glazed tile roof support system

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
5MWp watt/month
Inquire Now Customer Service

Contact us by

(1) WeChat
(2) Whatsapp: +8617190086776

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Stainless steel hook type support structure and special rail,simple and grand appearance,exquisite structure stability,installed in site without welding ,high reliability,long service life.

makesure supporting and base structure are entirety with firm,reliable,stabilizedand good safety performance.secondary protection are needed in constructionsite,in order to shorten the age of anticorrosion.


Installation site  Ground
  Installation angle  customization
  Wind resistance 35m/s
  Solar Panel Type  frame or frameless
  Solar panel size  any size
  Mount track  aluminum extrusion attachment
  Mount materials  6063-T5
  Installation height  customization
  Snow load  1.4KN/m2
 Components arrangement   laterally or longitudinally
  International Standards   comply with AS/NZS 1170 and other international standards
  Quality Warranty  20 years


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the metal material for the RESOLUTE bracket?
The role of drugs is anticoagulant, the coating is the drug wrapped up the polymer carrier. Vascular tissue is hydrophilic, hydrophilic polymers and vascular tissue can be physically compatible, which can greatly reduce the vascular tissue for the stenosis of the inflammatory reaction;
Q:What is a high-profile template system?
Large template support system refers to the construction of the construction site concrete component template support height of more than 8m, or erection span of more than 18m, or the total load of more than 15kN / ㎡, or concentrated line load greater than 20kN / m template support system.
Q:How to build an effective teaching stent
analysis of teaching problems and needs, design solutions to teaching problems and strategies to implement the design, evaluation, and constantly improve the design of a systematic process.
Q:Fire engineering, piping, valves, stent installation of what specific requirements
Design drawings and other technical documents complete, and reported by the owners and supervision and approval. Construction plan has been approved, and made to the team at the end. Temporary facilities and water supply, power supply to meet the normal construction requirements. Related equipment has been fitted and into the scene, with construction conditions.
Q:Specification for installation of fire pipe support
The height and spacing of the fire pipe support shall be in accordance with the requirements of the design and construction specifications.
Q:What are the hidden dangers of solar PV systems? It is best to classify, such as stents, inverters.
If the installation is very remote no man's land, it is recommended to purchase enough to buy the brand and good quality equipment, maintenance and repair costs are high.
Q:How to remove the climbing bag bracket
A good backpack is a good partner, travelers are very seriously and cherish their own mountain backpack. Mountaineering backpack is used for climbing, and other adventure sports (such as rafting, crossing the desert, etc.) and long journeys are also widely used.
Q:What is a finished stent?
Have shortened construction time, reduce maintenance time and so on. The main applications are mainly used in building water supply
Q:Is the template and stent two or one?
Material staff, that is, the contractor to see the words in accordance with the quota on it. The template is the contact area, the stent is the building area.
Q:Fire spray installation in the anti-swing stent approach?
5 when the nominal diameter of the pipe is equal to or greater than 50mm, each section of the water main pipe or water distribution pipe should not be less than one bracket, and the anti-swing bracket should not be greater than 15m spacing; when the pipeline changes direction,

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range