Solar Panel Ground Mounting Bracket

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description

   

Solar Panel Mounting Bracket
1, mainly used in large-scale photovoltaic power station project, the ground used to support the photovoltaic panels components.
2, product main frame profile is made of Q235B steel plate a cold bending forming, economic, durable, easy to install.
3, surface using hot-dip zinc treatment, durable resistance to corrosion.
4, our products have been in China, gansu, shanxi, shandong, sichuan and other large power station project put into use, obtained the customer consistent high praise.


Model NumberHL-PS-001
ApplicationCommercial
Installation SiteOpen Area
MaterialSteel
StandardGB,AISI,ASTM,BS,DIN,JIS
Installation AngleAccording to customer's request
Installation HeightAccording to customer's request
Wind Load90m/s
Snow Load1.8KN/m²
Solar Panel SizeAny
Warranty10 years
Service life25 years
Packaging DetailStandard Export Carton, Plywood Pallet and Case.
Delivery Detail1-2 weeks according to the order quantity


Our Services

1. Can provide the customer reference samples

2. Support customized to meet the need of customers design and processing.

3. Provide after-sales construction guidance.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is a finished hanger?
Finished hanger Overview Finished product hanger is directly from the manufacturers to produce stereotypes of the channel and a variety of connectors, and then by the construction staff on-site loading of the hanger system.
Q:What are the hidden dangers of solar PV systems? It is best to classify, such as stents, inverters.
Controller design charge and discharge circuit designed over-current protection (plus insurance); inverter output lightning protection, overcurrent protection; bracket can withstand more than 12 typhoons; battery low temperature and high temperature protection.
Q:How to build an effective teaching stent
So, what is the bracket, teaching design and how to build a bracket? This article to a writing design prototype for the case, how to teach in the design of students for learning and development of stent. First, what is the teaching design Teaching design is the protection of effective teaching, although different scholars on the interpretation of teaching design is not the same
Q:What is a finished stent?
A little bit of conflict is normal, it is estimated that after 3 months will come, but do not know what happens after 3 months I am also Zeyi the whole ah? I am also ah I was the same problem. The The I am also so I am also
Q:Is the template and stent two or one?
The requirements of the stent support: stable, will not be displaced due to pouring and vibrating, bearing capacity, can support the weight of the board after pouring, and demolition of all the pouring parts on the load, safe, will not collapse, or fall Wounding.
Q:What is the metal material for the RESOLUTE bracket?
If the core of the stent is a lipophilic molecule, it is compatible and firmly wrapped in drugs, in 6 months and longer time a small amount of uniform release of drugs to ensure sustained and stable drug stent effect.
Q:What is the support frame at the bottom of the car?
It is a spring spring pin to the front end of the leaf spring and the front of the steel plate spring front bracket connected together, the front end of the ear hole to reduce the wear and tear with a bushing.
Q:What are the benefits of finished stents?
U prefabricated welded steel groove will inevitably lead to error errors, affecting the quality of the project, reduce the safety of the project, causing hidden dangers, adversely affected by the duration.
Q:What is the full support system
Full scaffolding is mainly used for large single-storey building, exhibition hall, gymnasium and other high-rise, large building between the top of the building decoration and structural construction, must contain pole, bar, bracing, scissors support.
Q:Fire engineering, piping, valves, stent installation of what specific requirements
Installation preparation → prefabricated → trunk installation → riser installation → pipe installation → pipe pressure test → pipe flush → pipe corrosion and insulation.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range