Aluminum solar frame

Ref Price:
Loading Port:
China Main Port
Payment Terms:
Min Order Qty:
Supply Capability:

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:


1)Alloy No.:6005,6060,6061,6063,6063A,6463,6463A or other as requested

2)Surface Treatment:

  (1)Powder Coating



  (4)Mill Finish  

  (5)Wood Grain

  (6)Flourocarbon Coating

  (7)PVDF Coating


3)Profile Shape:in accordance with drawing or re-design as requested or market needs

4)Coating Colour:silver, bronze, champagne, black, blue, glod and so on

5)Introduction:We can supply all kinds of aluminum profile, aluminum extruded profile, solar energy profile, elevator guide rail profile, radiate heat profile, pipeline profile, auto window frames profile,window and door profile, decoration profile, mechanical special shaped profile, special shaped scraper profile, curtain wall profile, building roofing profile, finned tube profile, general profile and others

6)Certificates:ISO 9001:2008,CE,SGS

7)Standard: GB5237-2008


  (1)Extrusion production lines

  (2)Anodizing and electrophoresis production lines

  (3)Spraying production lines

  (4)Thermal insulation production lines

  (5)Fluorocarbon production lines

  (6)Smoothing mill production lines

9)Cutting Length: according to customers' need

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is a finished hanger?
Mainly used in the construction of the water supply and drainage works, construction electrical engineering, building HVAC projects, solar photovoltaic systems, subway stent system and other systems.
Q:What are the hidden dangers of solar PV systems? It is best to classify, such as stents, inverters.
If the installation is very remote no man's land, it is recommended to purchase enough to buy the brand and good quality equipment, maintenance and repair costs are high.
Q:What is a finished stent?
Finished stents are directly from the factory to produce stereotypes of the channel and a variety of connectors, and then by the construction staff on-site assembly of the stent system.
Q:What is the difference between a shock support and a conventional stent?
support hanger, and then change its design and selection. , Strengthening, anchoring, etc .; 3) seismic support hanger vertical, horizontal hanger, its force, laying, anchoring and so on seismic engineering, structural engineering, mechanical engineering, water supply and drainage and other multi-disciplinary knowledge.
Q:What are the characteristics of the hydraulic support hydraulic system?
Hydraulic support is mainly used in coal mining and other underground production site, so the first is to ensure that when used in these places will not appear fire heart, it will not be charged because of friction and amplification, and thus detonated, so first consider the hydraulic
Q:Easy to pave the anti-static floor bracket system?
static floor can be freely in the track orbit on the random placement, free flip, to ensure that the floor of the smooth, beautiful, no deformation, which is the patented technology and conventional Way to install the biggest difference.
Q:What are the benefits of finished stents?
Through the assembly of different parts can be flexible with a variety of production needs of the design to meet a variety of construction environment.
Q:Specification for installation of fire pipe support
The size and type of the bracket should be based on the actual situation to determine the stent hole should be used to open the hole drilling, is strictly prohibited to use electricity, gas welding openings.
Q:What is the full support system
A construction method, to take a certain interval, dense erection, from the role of the scaffolding construction method. Currently common in the construction of cast-in-place bridges and cast-in-place floor construction.
Q:Fire engineering, piping, valves, stent installation of what specific requirements
Design drawings and other technical documents complete, and reported by the owners and supervision and approval. Construction plan has been approved, and made to the team at the end. Temporary facilities and water supply, power supply to meet the normal construction requirements. Related equipment has been fitted and into the scene, with construction conditions.

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range