Aluminium Heat Sink

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
1 Ton pc
Supply Capability:
1200 Tons per Month pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Features:

 

1)Material : 6063  6061  6060 and different  aluminium  alloy

2)Status:T4  T5  T6 or other special status

3)Surface treatment: mill finish, anodized sliver ,anodized bronze, anodized champagne, anodized black pearl, various power coating color, electrostatic sliver, electrostatic champagne, electrostatic golden, electrostatic titanium , machine polish sliver, machine polish bronze, wooden grain color, and Fluorocarbon spraying.

4)Annual capacity : 120000TON

5)Quality : China Nation Standard GB/T 5237 2004 (advanced class)

6)Use: can be widely using aluminium window, door, curtain wall, hand railing , normal aluminium profile, decorative and industrial aluminium profile

7)Advantage: Famous Brand  reasonable&market price, soonest delivery and good after sale- service

8)Type of package:protection foam+heat contracted plastic film. / wooden packing / Metal pallet or depand on clientspecial requirement.

9)Payment term:T/T:30% of total value as deposite should  paid by T/T within 3 days when confirmation ,and the remaining sum should be paid by T/T before delivery.L/C: 100% at sight

10)Delivery Day: 15-30days

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:1000 square meters low voltage.36 volts lighting power supply with multiple transformers and wires
You must know the quantity and power of the lamp to determine the transformer
Q:Which is more energy saving by using 24V500W transformer lighting and 220V500W lighting?
See whether the lamp power saving, can not see whether it has a transformer, but to see the light efficiency of the lamp, that is, the ratio of light flux to power!Popular speaking, that is, spend the same electricity to see who sends more light!So, when comparing, ask what the light is, then judge again!The luminous efficiency unit is LM/W
Q:Why should lighting transformers be used in factories and mines?
In some factories and mines (such as power plants), in order to supply power reliability, the power system is grounded in a three-phase, ungrounded, or neutral manner. In this way, the transformer must be connected to a neutral grounding type with a special transformer to supply power to the lighting.
Q:How is the lighting power of the 380V transformer calculated?
The transformer (Transformer) principle should change the AC voltage of the primary coil, the main component of the device level by using electromagnetic coil core (core) main functions: voltage transformation, current transformer, impedance converter, isolation, voltage regulator
Q:3 24V100W lights, I need to use a large capacity transformer (220V change 24V)?
The bulb is used in the two luminescence tube combined type lamp holder, the calculation process is very complex. Different combinations, the secondary voltage is different. Because it is a DC ignition, but also consider the efficiency of rectification, but the total power is constant.
Q:The difference between lighting transformers and control transformers
Lighting transformer voltage is generally rated by a group or two setsControl transformers have many levels of output voltage
Q:Is the substation separate from the power and illumination transformer?
There is only bus in the substation, and the station is connected with the transformer from the bus. If there is no electricity even in the bus, then the substation should not be considered active.
Q:How to calculate the rated capacity of small transformers for lighting purposes?
Capacity of power transformer is the basic equipment for a total capacity of [kW] (maximum power consumption rate by a / X100 capacity) divided by the power load [%] value for benchmarking.
Q:How many power illuminator can 5Kva 36V transformer drive?
Of course, if you want to bring more is not impossible, but depends on the working conditions, the actual power = nominal power, short time use (to ensure that the transformer temperature rise is not too high) is also available
Q:Please tell me how to calculate the transformer in the lighting circuit of elevator shaft in building electrical design
Pe=19.5KW, installed capacityKx=1 coefficient of demandPjs=KxPe=19.5KW, calculated loadCOS, phi, =0.85, power factorIjs=KxPe/3/220/cos phi (Ijs calculates current, voltage, 380V/220V, three-phase)=1*19.5*1000/3/220/0.85=34.76A
We will be a leader in this industry relying on good designs, high quality materials and strict production. Our company tries the best to fulfill the requirements from customers. Your satisfaction is our first aim. Our policy is "high quality is priority and good service is the power of growth".

1. Manufacturer Overview

Location Guangdong,China (Mainland)
Year Established 2001
Annual Output Value Above US$100 Million
Main Markets South America 0.59%
Eastern Europe 0.38%
Southeast Asia 0.50%
Africa 3.30%
Oceania 0.07%
Mid East 0.50%
Eastern Asia 0.62%
Western Europe 0.50%
Southern Europe 0.27%
South Asia 0.75%
Domestic Market 92.52%
Company Certifications Guangdong Well-known Brand; Guangdong Famous Trademark Certificate; Tax Payment exxceed 10 million RMB/y; ISO9001:2008

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port Guangzhou
Export Percentage 31% - 40%
No.of Employees in Trade Department 11-20 People
Language Spoken:
b)Factory Information  
Factory Size: Above 100,000 square meters
No. of Production Lines Above 10
Contract Manufacturing OEM Service Offered Design Service Offered
Product Price Range High and/or Average