2 Tons Fast Erection Electric Tower Crane
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 1000 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Item specifice
Brief Introduction:
1.Overall haulage with only a 5t vehicle for whole machine transportation. Haulage size can smoothly pass all standard bridge and culvert.
2.After quick erection, it can start working normally within one hour.
3.Correctly-positioned mechanism kinematics spacing.
4.High precision and reliable load moment limiter and load lifting limiter.
5.Special system: wheelbarrow persist axis break
6.Two purpose: arm-brace fixing and orbit walking
7.Overall haulage bridge can be easily altered into a transport tow (10t)
8.35m height and could be used 30 degree higher up
9.Crane body locked automatically, crane jib docked automatically, pulley at jib point positioned automatically. There is no artificial high-altitude operation through the whole erection and dismantling process.
Max.Lifting moment | 40 tm | |||||||
Lifting capacity | 4 Ratio | 4~11m | 11~36m | |||||
4.0t | 4.0~1.1t | |||||||
2 Ratio | 4~21m | 21~36m | ||||||
2.0t | 2.0~1.1t | |||||||
Lifting speed | Ratio | α=2 | α=4 | |||||
ton | 2 | 1 | 4 | 2 | ||||
m/min | 0~24 | 0~29 | 0~12 | 0~14.5 | ||||
Slewing speed | 0~0.65r/min | |||||||
Trolleying speed | 20/30m/min | |||||||
Erect Height | 30.9m | |||||||
Working temperature | -20℃~+40℃ | |||||||
Total power | 24.9KW | |||||||
Lifting mechanism | Motor | Model | YEJ160M-4 | |||||
Power(kW) | 11 | |||||||
Speed(r/min) | 1460 | |||||||
Uplifting mechanism | Motor | Model | YEJ100L2-4 | |||||
Power(kW) | 11 | |||||||
Speed(r/min) | 1430 | |||||||
Slewing mechanism | Motor | Model | YLEW112L-55-6B1 | |||||
Moment(N.m) | 55 | |||||||
Trolleying mechanism | Motor | Model | YDEJ100L-4/6 | |||||
Power(kW) | 2.2/1.5 |
1. why chose us?
China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various
kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.
2.How about the shipment?
You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.
The delivery time is 20 days.
3. What about your service?
We have our factory, we can meet customers needs as soon as possible.
We have first rate professional technology and provide good after-sales service.
4.After Sales Service
We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.
- Q:Is a mobile crane allowed to operate in an inclined plane?
- It has been my experience that cranes like to be level, and not operate unless they are level. But, I am no expert.
- Q:my HSAP prep teacher wants us to find instructions on how to make an oragami crane.She said that it has to be less than 24 steps.I have looked on the internet and I cannot find anything.I need this by tomorrow.Please help!
- Start with a square piece of paper. You got that? Fold the paper corner to corner to get a large right triangle, and fold it corner to corner again to get a smaller triangle. You got that ,or did I lose you. Open the paper, and you will see a big X. Never mind the X. We will come back to it. Now fold the paper side to side to get a rectangle, and fold the two SHORT SIDES to the X fold. Open and do the other two by repeating what you just did. Open the paper FLAT. You can now see a 4 pointed star. Along the four sides of the square, push down on the perimeter of the star to make the star come up. Fold down until you have a flat KITE. Make sure you have 2 flaps on each side. What you are looking at now is one wing, and the other one is in the back. The neck and head are inside the wings. Pull them out half way to expose them. Fold one side at the tip to make a head. If you did everything correctly, and hold under the neck with one hand and pull the tail with the other hand, the crane should flap its wing. Write back if you need more help.
- Q:How come you never see cranes being transported from one site to another?
- because they move so slow its hard to tell if there moving or not.
- Q:Do cranes, the bird, have any significance in Egyptian or Chinese mythology?
- Yes, they do. Look it up over an Internet search engine.
- Q:The cantilever part has to stay at least 6-12 inches off the ground.
- Then how are you interlocking the popsicle sticks? Most projects like this allow for thread and glue. OK.. so you can glue them and, I assume, cut them. Use a truss system made out of small pieces of split sticks to build and strengthen the support of your crane and make that long arm out of a series of sticks that form an interlocking triangle when you look into the arm. Stagger the triangle pieces so that no two joints are in the same location and then glue small splints to the inside of the long pieces.at ecah of those joints. If you have no weight limit and the support column will hold it, consider filling the triangle with a coating of glue.. be sure to allow several days for it to dry. That way the glue will also add an element of strength Take your tme, use a strong glue if you have that option - like Gorilla Glue, ,and build it in sections. Be sure to let the glue dry fully before moving on to the next stage. For the triangle portion, you can use thread to bind the pieces into a triangle shape until the glue dries and then remove the thread and use light sand paper to remove any residue. for the counterweight of the cantilever, fashion a small box out of pieces of sticks and fill it with a dense glue. As the glue hardens and compacts add more glue. When the glue has fully dried, remove the sticks unless you are still within your 150 count. That way the glue serves two functios and your instructions do not prohibit this. Hope that helps
- Q:How to improve the stability of tower crane
- The fatigue test data show that the fatigue life of the phosphating coating of steel wire rope is about 3 times of the same structure light steel wire rope (laboratory comparable conditions), not easy to wear and corrosion is not easy to cause the service life of wire rope large amplitude extension. Manganese phosphating is wear resistant phosphating, which can solve the wear problem in the use of wire rope and improve the corrosion resistance. It is for reference only
- Q:hiya :) for my birthday i want an arcade style grabber machine that can pick up sweets and accept real money etc. I dont want small plastic ones because they are pretty pathetic tbh. I know its a bit random but i really appriciate it because my birthday is coming up ;) i want it being in the range of ?60-?100 :) thanks
- Do okorder / There's some at the bottom there for sale for only $2175 if you're willing to shell out that much. Cheers
- Q:how do you make one of them, put me through sep by step with photos.
- Hi okorder /
- Q:WHAT IS A WADDLE CRANE?
- This okorder /
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
2 Tons Fast Erection Electric Tower Crane
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 1000 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords