1500kg Articulated Front End Wheel Loader
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 100 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick details:
Condition: New
Model Number: 930D
Place of Origin: Shandong, China (Mainland)
Type: Front Loader
Moving Type: Wheel Loader
Dimension(Long * Breadth * High):5900*2100*2970mm
Rated Load: 1500kg
Certification: CE, ROPS/FOPS
Warranty: 8 months
After-sales Service Provided: Engineers available to service machinery overseas
color: yellow, red, black as u need
our advantage:
1.Installation Services
Installation Services are available with all new machine purchases. We will provide the technical know-how for your operation smooth transition and support for installing, debugging, operation of the machine, it will indicate you how to use this machine well.
2.After Sales Service
We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.
Specifications of our products:
FAQ:
1.How about the shipment?
You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.
The delivery time is 20 days.
2. What about your service?
We have our factory, we can meet customers needs as soon as possible.
We have first rate professional technology and provide good after-sales service.
3. Why choose us?
1.We are professional wheel loader and backhoe loader manufacturer with 10 years experiences in China.
2.Loaders rated load from 600kg to 5000kg and backhoe loader rated load 1200kg.
3.Loaders' color can be yellow, red, green ect, as you like.
4. All of loaders are approved by CE, ROPS/FOPS certification.
5 Delivery time: within 14 days when we have received advance payment.
6. Customers first: Anytime or anywhere or any question i will reply to you as soon as possible.
- Q:a new bulldozer was being loaded or unloaded from a trailer and it rolled over backwards;flipping on top of the operator.iviewwed this picture on another computer and i would like to see if i could find it again.
- try youtube,it might be there i have a great set of pictures of a bulldozer being eaten by a bucket wheel shovel
- Q:What is a high drive bulldozer?
- High drive sprocket and walking system before and after the bulldozer guide wheel in triangular arrangement, the drive sprocket and away from the ground, to avoid the direct impact of the traditional load type bulldozer for driving wheel in contact with the ground by the transmission system, a substantial increase in life expectancy.
- Q:I, honestly, do not know because Intel is releasing their Ivy Bridge early 2012, so I think Bulldozers will be good until then. What do you guys think?
- I think the lowest speed Bulldozer FX-4100 model will at minimum be 10% faster than a i7-2600k and the FX-8170 will be 60% faster than the 2600k and could be as much as 100% faster. With the lack of news coming from AMD, I expect the speeds to blow the socks of most everyone. Generally quite before the storm.
- Q:I think being a bulldozer operator would rock. I had to hire a guy to move some dirt in my backyard this afternoon. Those things rock.
- yeah, or at least work on bulldozers, i think they make more money than the drivers, this is the age of machines, An axe-age, a sword-age
- Q:Brian Urlacher is extremely experienced and played football his whole life I'm sure. Umaga however, is the Samoan BullDozer.
- Well considering Brian Urlacher is one of the best MLB in the game he would win against Jon Cena who fake wrestles.
- Q:ANY advice is appreciated, thank you!My parents have been married for 17 years, and got divorced about 4 months ago. Yesterday over dinner, my father announced that he is getting married....to my aunt (mom's sister)........As ridiculous and shocking the whole divorce thing was, this was like being kicked in the groin after being hit by a bulldozer. I don't know WHEN they started dating, or HOW this is even possible, but what I do know is that I don't want them to get married. I'm generally an accepting person and can deal with strange situations, but I am appalled and disgusted by this. My twin brother stormed out and went to go live with his friend for the next week, and I felt like doing the same, but then I felt bad about leaving my father in his crisis. I cannot accept this as it is but I don't know how to tell my dad. Please PLEASE help me out!!
- nothing you can do about it, hes an adult, and hes going to do what he wants
- Q:a martian rover times ten along with the astronauts next going to planet Mercury after an underground tunneling could be madePlanet Mercury soil loose with some little-big W-54 bombs for demolition
- The cost would be enormous to even get them out of earths atmosphere for one and Mercury's temperature would either freeze the fuel or boil it off and the machinery would melt in the suns light so you would have to get them underground so fast that it would be imposable!
- Q:another question can any one help with answer 2 bulldozer1 level 56 it is another can't be done as far as i'm concerned maybe someone can help please
- WTF are you talking about?
- Q:Shandong Shantui bulldozers and than what a good
- The difference between driving and driving the Shandong Shantui
- Q:An appraiser values the following. A man wants is willing to bid as high as $300 000 for the lot, however he won the lot at a bid of only $234 000.1. Bulldozer $60 0002. Dump Truck 1 $12 0003. Dump Truck 2 $60004. Crane $120 0005. Pavement roller $72 0006. Land Parcel $36 0007. Construction building $30 0008. Sand pit $24 000Total $360 000Question:1. How can the appraised values be used to calculate cost values for hte new assets?2. Work out he cost values for the newly acquired assets, making sure that the total is equal to the auction price.
- Determine what percentage each asset is of the total appraised value. Then use that percentage times the accepted bid amount to determine the cost of each. For example: 1. Bulldozer $60 000. Divide: 60000 (Bulldozer) / 360000 = .166667 times 100 to get the percentage. 16.6667% Then apply that percent to the total bid, 234 000 times .16667 = $39 000 and so on down the line. Add up the 8 results and make sure the total equals $234 000.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
1500kg Articulated Front End Wheel Loader
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 100 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords