mini wheel loader/Haihong CTX918 wheel loader

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
100 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Description of CTX918:

   Haihong wheel loader combines strong power with advanced intelligent design together to make the products superior in this area. It can be called"both intelligent and courageous" . The closed type load sensing hydraulic system can provide you with accurate power you need. So even work on steep slope, the wheels can still obtain powerful motive force to ensure strong loading capacity. The full usage of HP reduces fuel consumption and decrease the times of wear and maintenance. We believe that "possessing Haihong loaders, work excellently".

    Our wheel loaders have the following features:

    Good economy: belt drive, automatically adjust the output torque according to load change, high efficiency and convenient repair.

    High production efficiency: the optimization design of working devices makes strong lift force and high automatic flat function.

    Flexibility: articulated frame structure, double steering oil cylinder, small turning radius, convenient operation in narrow space.

    High pass through ability: rear axle can swing around the lifting frame to improve the pass ability.

    Comfortable driving: hydraulic load sensing steering system is stable and reliable.

mini wheel loader/Haihong CTX918 wheel loader

mini wheel loader/Haihong CTX918 wheel loader

mini wheel loader/Haihong CTX918 wheel loader

mini wheel loader/Haihong CTX918 wheel loader

mini wheel loader/Haihong CTX918 wheel loader

mini wheel loader/Haihong CTX918 wheel loader

mini wheel loader/Haihong CTX918 wheel loader


Technical Specifications of CTX918:

mini wheel loader/Haihong CTX918 wheel loader


FAQ:

1.How about the shipment?

You can put 3 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days. 


2. What about your service?

Our quality ensurance time is 3 months. And our engineers can supply overseas service. 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Amd FX-4100 Bulldozer or Sandy Bridge?
For okorder.com Make sure you get a good P67 or z68 motherboard with it.
Q:who do u think would have won when they were both in their prime..?
I'm sorry to say that I disagree, but it would have been a terrific fight. Marciano was, to his credit, a phenomenal puncher, and could have punched a hole right through Ali's chest. . . ..IF Ali stood still, which he'd never do against a puncher like Rocky. Ali stood with harder punchers (Foreman and Shavers) and came out just fine. Also, Rocky was a really crude &boxer& (by that I mean, his boxing skills weren't exactly that of a Mayweather or Robinson). While I think Marciano could have been another Joe Frazier for Ali. . . .I think the Louisville Lip would have prevailed.
Q:What are the common faults of bulldozers?
Common faults of bulldozer:1, the main clutch slippingWhen the main clutch of the bulldozer is slipping, the engine speed is normal, and the smoke does not emit smoke. The working device works normally, but the machine climbs uphill and can not even walk. The main clutch slip fault is the most common type, the main reasons are: the main driven plate wear; pin adjustment plate welding; the main clutch lever is not in place; thread poor adjustment plate and the flywheel end cap. Clutch slip faults are sometimes very difficult to handle and the general repairman's approach is to rotate the disc repeatedly. If multiple adjustment after the clutch is still slipping, is often the first to remove transmission and blindly remove the main clutch, so not only to find the fault point and easy to damage other parts, production delays, the result will cause major economic losses. To this end, the investigation should be based on the above possible reasons for careful analysis in order to effect.
Q:Politically speaking, If my llama drove a bulldozer through your side wall, what would you do about it?
well first thing I'd do is see if the lama was right winged or left winged, check out their back roung as an activist and do research to see if this was a terrorist act, then on finding that information i would then know which party to sue. :)
Q:what are these called?
It is simply called a wrecking crane.
Q:What's the difference between a high powered bulldozer and an ordinary bulldozer?.
Komatsu without high drive, so there is no logical drive by high mountainSimply look at a bulldozer,
Q:Can i run Battlefield 3 at ultra settings?
I am not sure but I use nvidia geforce gtx 550ti and I play on ultra settings. I have a mid grade card myself. the rest of your specs look real good in my opinion.
Q:Who killed Rachel Corrie?
so funny should be more of it here you go kids dont lie in the front of bulldozers protecting terrorists
Q:What's the driving license for a bulldozer?
Local units responsible for special operations assessment, not the same, there are Safety Supervision Bureau, labor bureau or quality supervision bureau.The wheel excavator must do the driving license. The driver should do the operation card and driver's license, and the bulldozer needs the operation card. There is the B driver's license and the operation certificate of the production safety administration
Q:How much does it cost in general to level out and flatten a football field with a bulldozer?
you could do it with a laser bucket for around (im not sure of real cost, just getting it there and moving dirt.)now you could shape the field to shed water by giving it a half foot of fall sideline to sideline, and around 14 inches for the field. set on a bidimensional plane.it would put the highest point centerfield 50 yrd line and gradually slope down.itd be a way better job than a dozer, flat like as in from center outor you could use 4 planes, 1 up the center with 1 on each end and 1 in the center.it shouldnt cost 5000 providing its level to start with, you remove around 3 inchs from the sidelines and build the center and plane it, maybe a day and a half.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range