mini wheel loader/Haihong CTX930 wheel loader

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
100 set/month
Inquire Now Customer Service

Contact us by

(1) WeChat
(2) Whatsapp: +8618101089932

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Description of CTX930:

• Low fuel-consuming, high-quality turbo charged engine has good power performance and big torque   reserve.

•Double rocker with better visual field. Short wheel base chassis improves steering flexibility and operation efficiency.

• Steering system provides flexible steering operation.

•Unique energysaving patent technology, including double pumps and double circuits, turning priority and unloading hydraulic pressure system, is efficient and energy-saving with better power performance and lower fuel consumption.

•Turbo hydraulic torqueconverter together with dynamic planettype gear box enables a wide and high efficient range and facilitates the gear shifting.

• Bigger driving axle, 4-wheel drive ensures excellent towing performance.

• Four-wheel, dual-line and pliers disc braking system ensures safer and more reliable operation.

•The soundproofing, heatproofing and shockabsorbing driver’s cab has a spacious operating space, a broad view and comfortable adjustable seats, specialized cool & hot air-condition can also be equipped.

• Z-form connecting rod has strong breakout force and high raising ability, and enables high operating efficiency.

•Low alloy material and alloying blade and corner tines are used for the bucket, which is stronger and more durable.

• Higher dumping height and biggest dumping reach.

• The front loader frame provides good machine stability and stronger structural strength.

• Rational matching parts, superior machine performance and extraordinary operating efficiency.

• Various optional equipments and buckets can satisfy different needs of customers.


mini wheel loader/Haihong CTX930 wheel loader


mini wheel loader/Haihong CTX930 wheel loader


mini wheel loader/Haihong CTX930 wheel loader


mini wheel loader/Haihong CTX930 wheel loader


mini wheel loader/Haihong CTX930 wheel loader



Technical Specifications of CTX930:

mini wheel loader/Haihong CTX930 wheel loader


FAQ:

1.How about the shipment?

You can put 3 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days. 


2. What about your service?

Our quality ensurance time is 3 months. And our engineers can supply overseas service. 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Beg great God to point out, 5Computer model X64 compatible desktop computerOperating system Windows 7, ultimate 64 bit SP1 (DirectX 11)Processor AMD, FX, -8150, Eight-Core eight kernelMain board ASUS SABERTOOTH 990FX R2.0 (ATI RD890 PCI to PCI bridge (external gfx0 port B))Memory 16 GB (G.skill DDR3 2133MHz)The main drive of Kingston SV300S37A60G (60 GB / SSD)Video card Nvidia GeForce GTX 770 (2 GB / ASUS)Display Samsung SAM0907 SMS24B750V (24 inches)Sound card Nvidia, GeForce 6800, Ultra @ ATI, IXP SB600/SB700/SB800, hi fi audioRTL8168F PCI-E Gigabit Ethernet card Realtek NIC / ASUS
Wow is a CPU game with limited support, dual core, and more importantly, single core performanceA:One operation of the CPU is to predict the amount of instruction (from memory) to read instructions - decoding - - - to output (to memory); such a process is generally referred to as the "clock cycle"".The actual performance of CPU in a program can be interpreted as equal to the core number x (which can be exploited) and the number of instructions actually executed in each x clock cycle.At present, the number of instructions per cycle "actual execution of this indicator, AMD is far behind INTEL; so it can increase the number of cores, raise the frequency (higher frequency can increase the number of clock cycles per second execution), to obtain the final performance is close to or equal to the same level of CPU application in INTEL support for multi-core and multi thread, but in the multi-core multi process support application in good condition, effect of frequency, number of cores can play is relatively limited.When a major feature of developing people with AMD CPU wow playing less, simple environment do not see a problem, flowing freely, many people, when big data (many people of the city, a copy of the data explosion broke out, when the moment), a prototypeTwo:Even a single nuclear, amd (instruction set architecture) the cache hit rate is far lower than Intel, CPU cache delay and alarming high, led directly to the efficiency of AMD is much lower than that of Intel, in simple terms, CPU 1 MHZ Intel AMD CPU is approximately equal to 1.5 MHZ, the 3.6 of you (4.2) G CPU. But the equivalent of Intel 2.4 (2.8).
Q:Today, passing a site, idle boring, want to play, ha ha. Please don't scold ~~~~~~~~~~~~Personal feeling:Excavator: high attack, but low defense,Roller: high defense, but lack of means of attackBulldozer: attack and defense is relatively balanced, agile and high. (after all, the wheel is faster than the crawler.) I prefer it..
Of course is excavator, hand length, arm length, hit far, also can hit and run, in that both the boy hasn't caught up, a black tiger Taoxin, remote attacks, the engine broke again, you say who wins?
Q:Was it Sharon!!!?
It was him, all right. They say he's in a coma, but I personally believe he finally exploded from eating one too many bagels with cream cheese.
Q:Is the AM3+ special interface for the AMD bulldozer? Does the AM3+ motherboard provide full support for bulldozers?
AM3+'s motherboard can use AM3's CPU, but AM3's motherboard can't be used, and AM3+'s CPU..AM3+ is built for the launch FX series
Q:depreciates by 20% of its value in the value in the preceding year. Let Vn be the value of the bulldozer in the nth year. (let n=1 be the year the bulldozer is purchased.)What is the formula for Vn? and in what year will the value of the bulldozer be less than $100,000?pls show your solution so that i can understand it easily...pls...thank you
Vn=.8n + 160,000 In just over 2 years the bulldozer will be worth 100,000. So if you are going by years the answer would be. In three years the value of the bulldozer will be less than 100000. Another way to look at the problem would be so say that the dozer retains 80percent of its value from the previous year. 100-20=80.
Q:Who would win, me or a bulldozer?
The bulldozer, because it doesn't obsess over hating someone who is more successful than it, like you.
Q:Why do I want to drive a bulldozer through an Occupy Camp?
To scoop up all of the feces and other garbage they leave behind.
Q:a new bulldozer was being loaded or unloaded from a trailer and it rolled over backwards;flipping on top of the operator.iviewwed this picture on another computer and i would like to see if i could find it again.
try youtube,it might be there i have a great set of pictures of a bulldozer being eaten by a bucket wheel shovel
Q:Driver rams bulldozer into traffic in Jerusalem, killing two.The issue is parallel verb structure. Give me an answer that utilizes parallel verb structure and you will win!
A driver rams a bulldozer into traffic in Jerusalem, killing two.
Q:What Do You Do For A Living?
I run heavy equipment (loader, bulldozer, excavator) Still playing in my sandbox, just with bigger toys!

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range
Hot Searches
客服
live chat