ZL25(CTX936) 2.5 ton Mini Wheel Loader/Front End Loader

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
100 set/month
Inquire Now Customer Service

Contact us by

(1) WeChat
(2) Whatsapp: +8618101089932

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Description of CTX936:

• Low fuel-consuming, high-quality turbo charged engine has good power performance and big torque   reserve.

•Double rocker with better visual field. Short wheel base chassis improves steering flexibility and operation efficiency.

• Steering system provides flexible steering operation.

•Unique energysaving patent technology, including double pumps and double circuits, turning priority and unloading hydraulic pressure system, is efficient and energy-saving with better power performance and lower fuel consumption.

•Turbo hydraulic torqueconverter together with dynamic planettype gear box enables a wide and high efficient range and facilitates the gear shifting.

• Bigger driving axle, 4-wheel drive ensures excellent towing performance.

• Four-wheel, dual-line and pliers disc braking system ensures safer and more reliable operation.

•The soundproofing, heatproofing and shockabsorbing driver’s cab has a spacious operating space, a broad view and comfortable adjustable seats, specialized cool & hot air-condition can also be equipped.

• Z-form connecting rod has strong breakout force and high raising ability, and enables high operating efficiency.

•Low alloy material and alloying blade and corner tines are used for the bucket, which is stronger and more durable.

• Higher dumping height and biggest dumping reach.

• The front loader frame provides good machine stability and stronger structural strength.

• Rational matching parts, superior machine performance and extraordinary operating efficiency.

• Various optional equipments and buckets can satisfy different needs of customers.


ZL25(CTX936) 2.5 ton Mini Wheel Loader/Front End Loader

ZL25(CTX936) 2.5 ton Mini Wheel Loader/Front End Loader

ZL25(CTX936) 2.5 ton Mini Wheel Loader/Front End Loader

ZL25(CTX936) 2.5 ton Mini Wheel Loader/Front End Loader

ZL25(CTX936) 2.5 ton Mini Wheel Loader/Front End Loader

ZL25(CTX936) 2.5 ton Mini Wheel Loader/Front End Loader

ZL25(CTX936) 2.5 ton Mini Wheel Loader/Front End Loader



Technical Specifications of CTX936:

ZL25(CTX936) 2.5 ton Mini Wheel Loader/Front End Loader

ZL25(CTX936) 2.5 ton Mini Wheel Loader/Front End Loader


FAQ:

1.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days. 


2. What about your service?

• Reply your inquiry in 24 working hours.
• Experienced staffs answer all your questions in professional and fluent English.
• Customized design is available. OEM is welcome.
•Exclusive and unique solution can be provided to our customer by welltrained and professional engineers and staffs.
• Special discount and protection of sales area provided to your distributor.
• Do the best reliable heavy-duty single drum vibratory road roller in China.
• Warranty period is 1-year or 1500 working hours against Bill of Lading.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the most weight a helicopter has ever lifted ?
nicely they replied the 2nd question, as for any helicopter, it varies notably on engine (turbine, or piston) and length there's a notably small helicopter called the ok-Max which could raise 6000 lbs, and is used for hearth scuffling with and logging. Heaviest lifting american helicopter is i believe the Chinook. international, russian geared up MI-26 (i believe thats the call)
Q:Why are the amd bulldozers considered not good cpu's?
There really isn't anything bad about them...they just didn't live up to the expectations WE thought they would have when compared to the Intel. They came out late...the bulldozer was slated to come out before the 1155 sandy bridge...knowing the price for the previous gen of CPUs when the 2600K came out at under $300 I was floored! We had expected the Bulldozer to be at 3.8GHz or better/faster and of course be cheaper than intel...It didn't happen!
Q:Hi, I'm buying a gaming PC and I need some help!!?
AMD processors are well known for gaming but in my opinion Intel is just as good.
Q:Which build? Wait for bulldozer?
You should wait because there's a rumor that Intel will drop the price of their non-K series chips to greet Bulldozer. Sadly, the cheapest Bulldozer processor is suppose to be $200. If you're looking into a gaming PC, I would save up a little more money for a quad-core. Games are finally just starting to get to the point that they're actually making use of these things. Build #3 is the best. But, I would save up a little more just to future proof a little bit. It seems your last build was made of of some top shelf parts. You won't get as much time out the the parts you've picked, as you did with the last one.
Q:Is it tacky to have 2 themes at a birthday party?
It would be tacky if anyone there would even care. But he's only 2! Its his birthday so do what he likes. Using both themes would be great. It would make him so happy!
Q:Could a remote control Bulldozer, Crane, and a Backhoe be sent on planet Mercury for dig, and live underground?
If people are willing to spend the money, yes. Such a project would not require much new technology but the expense would probably be somewhere around the whole world's full output. For several years. Just start to try to think of all the intermediary steps required For example the Martian rovers are tiny, making them ten times bigger would barely be a start. They have to be many more times bigger to make a human sized borehole, and more more times bigger than that to make a hole big enough to put in the equipment to house a human in such a tough environment. But there is nothing except expense to stop the project. TIme and technology will bring the price down to plausible. Such a project is not likely to be considered until human colonies are already established someplace and a real economic benefit for doing it is found.
Q:How can i get rust off my bulldozer?
Yes. Phosphoric acid will remove rust and is a good base for paint. Car accessory stores sell it (Jenolite in the UK).
Q:Can I Use An AMD Bulldozer FX On My Motherboard ?
Socket AM3+ is for bulldozer and you only have an am3. Wikipedia states It will retain backward compatibility with Socket AM3 motherboards (as per motherboard manufacturer choice and if BIOS updates are provided, however this not officially supported by AMD; AM3+ motherboards will be backward-compatible with AM3 processors. Long story short no unless your motherboard had an update on the bios which'll support it
Q:The bulldozer on the mountain is out of order
Q:Should i upgrade to AMD Bulldozer or to change to Sandy Bridge?
Yeah, you'll want to wait for Bulldozer. Now the top of the line Bulldozer Chip is the FX-8170p that's stock clocked at over 4ghz. I don't know if they actually needed someting with a higher clock speed to beat the core i7 or if they plan to charge $500-600 for that chip. The prices of the Core i5-2500k and i7-2600k have already dropped $30-40. I paid $334 for the i7-2600k, now it's $300. What will the price be in 2 months? You know something's wrong or UP when an Intel processor goes down in price. Usually, they're trying to find a way to increase or maintain the price. To say Sandy Bridge is better is Fanboyism. AMD Claims that bulldozer will be 40%-50% faster while using the same Thermal Design Power. Most of AMD's Pehnom II high end chips run at 125TDP. The FX-p series runs at the same TDP. It's impossible to look at a benchmark becasue the 125w p series chips are all 8-core chips.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range
客服
live chat