ZL08(CTX912) 0.8 ton Mini Wheel Loader/Front End Loader

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
100 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Description of CTX912:

• Low fuel-consuming, high-quality turbo charged engine has good power performance and big torque   reserve.

•Double rocker with better visual field. Short wheel base chassis improves steering flexibility and operation efficiency.

• Steering system provides flexible steering operation.

•Unique energysaving patent technology, including double pumps and double circuits, turning priority and unloading hydraulic pressure system, is efficient and energy-saving with better power performance and lower fuel consumption.

•Turbo hydraulic torqueconverter together with dynamic planettype gear box enables a wide and high efficient range and facilitates the gear shifting.

• Bigger driving axle, 4-wheel drive ensures excellent towing performance.

• Four-wheel, dual-line and pliers disc braking system ensures safer and more reliable operation.

•The soundproofing, heatproofing and shockabsorbing driver’s cab has a spacious operating space, a broad view and comfortable adjustable seats, specialized cool & hot air-condition can also be equipped.

• Z-form connecting rod has strong breakout force and high raising ability, and enables high operating efficiency.

•Low alloy material and alloying blade and corner tines are used for the bucket, which is stronger and more durable.

• Higher dumping height and biggest dumping reach.

• The front loader frame provides good machine stability and stronger structural strength.

• Rational matching parts, superior machine performance and extraordinary operating efficiency.

• Various optional equipments and buckets can satisfy different needs of customers.



ZL08(CTX912) 0.8 ton Mini Wheel Loader/Front End Loader


ZL08(CTX912) 0.8 ton Mini Wheel Loader/Front End Loader


ZL08(CTX912) 0.8 ton Mini Wheel Loader/Front End Loader


ZL08(CTX912) 0.8 ton Mini Wheel Loader/Front End Loader


ZL08(CTX912) 0.8 ton Mini Wheel Loader/Front End Loader



Technical Specifications of CTX912:

ZL08(CTX912) 0.8 ton Mini Wheel Loader/Front End Loader

ZL08(CTX912) 0.8 ton Mini Wheel Loader/Front End Loader


FAQ:

1.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days. 


2. What about your service?

• Reply your inquiry in 24 working hours.
• Experienced staffs answer all your questions in professional and fluent English.
• Customized design is available. OEM is welcome.
•Exclusive and unique solution can be provided to our customer by welltrained and professional engineers and staffs.
• Special discount and protection of sales area provided to your distributor.
• Do the best reliable heavy-duty single drum vibratory road roller in China.
• Warranty period is 1-year or 1500 working hours against Bill of Lading.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Have you ever driven a bulldozer?
No, just a tractor.
Q:Under what factor of production would you clasiffy a bulldozer?oil deposits?
A bulldozer is capital -- which is both money and things used to make money from, i.e, even a factory is capital, and all equipment in factory Oil deposits are classified as Land. The main factors of production are: Land, labor, and capital. Management sometimes is added as a fourth factor, as is technology as fourth or fifth. IMO, management is really labor with one's mind. Technology would be capital too.
Q:Where there is high-quality used bulldozers supplier information?
All kinds of used bulldozer and construction machinery information to help you,Provide all kinds of dozer information.
Q:Who makes a higher salary ..backhoe, excavator, or bulldozer operater?
It all depends on who you work for and in what region. One person should be able to run all of these because they are so simple to operate. The more you are able to do for a company the more valuable you are to them which means more $$$$$$$$$
Q:Should i go with the AMD FX-8150 Bulldozer 3.6GHz or save some money and get a AMD Phenom II X4 980 3.7GHz?
For gaming the x4 would be completely fine. And don't worry about the amd/ intel debate, intel is better but not nearly as much as amateurs believe
Q:What are some good words to describe good athletes?
Specimin Bulldozer Wizard Tank Axe-Murderer
Q:when should I make a new computer?
I'd wait about a year and then look at upgrading the processor, then maybe the graphics card. Out of the current generation, I'd look at upgrading the processor to an FX-8320 (6300 or 8350 depending on budget, but 6300 might not be worth it). For a graphics card, a 7850, 7870, 7950, or GTX 760 depending on budget, with the top cards being the 7970, GTX 770 and 780. EDIT: 600W psu will handle 8320 and 7870 if it's decent quality (Corsair, Antec, Seasonic...).
Q:GTA San Andreas for bulldozer
Hello, if you play in San Francisco, you are doing the task of arriving in San Francisco, behind the mission point is a construction site, where there are bulldozers.
Q:How would the ohmic resistance, heat generated by the resistance, self-inductance?
A first look I would interpret it as is: the conductor and its insulation have been converted from perfectly round to a flattened oval. But, it is also stretched in the length direction and that is where the problem arises. Since the wire would have been stretched the cross-sectional surface area is smaller. Due to the uneven pressure , the distortion will be greatest at the edges of the bulldozer tract. In this area the resistance will be greatest, the heat generated would be concentrated at these two areas. Since the remainder is flattened (some) the self induction would be greater along the more flat portion. All this assumes insulator integrity remains.
Q:why is Intel so much better than AMD?
I wouldn't say intel is better...but better for what reason? the architecture in the Intel is ...better...because it has better &bells whistles&?? or is AMD better cause it doesn't have &bells whistles& ...just simpler architecture for a lesser price. can AMD be as good as intel? sure if you compare apples and apples not apples with oranges. True the FX &bulldozer& did not meet the expectations WE had for it...notice the big WE! WE expected a CPU that would beat Intel...didn't happen. when you want super high end processing you go with Intel...If just need good solid processing but for a cheaper price you go with AMD...its that simple. True AMD is focusing on the lower end...cause that's were MOST buyers are spending there money! look at the FM1 &A& series CPUs...nice moderate processing WITH reasonably higher end graphics....NO Intel CPU can say that at any price. Its just a matter of were you want to be in the market. Look at Mac vs. PC...people love Mac...but it is only 10-15% of the market. Is the PC better?? because it holds 80% of the market??...EACH has its own attributes that make it unique....each fills a &niche&....you buy what fills YOUR niche!

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range