ZYC90 Pile Driver Hydraulic Static Pile Driver for Sale

Ref Price:
$100,000.00 - 500,000.00 / unit
Loading Port:
Shanghai
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

ZYC90 Pile Driver Hydraulic Static Pile Driver for Sale

 

Lower Energy Consumption:

>>We use variable hydraulic systems with low   loss and constant power in this series of products, so that energy   consumption decreases by 30% and working efficiency increase by 60%.

 


 

High Efficiency:

>>To ensure the high working efficiency of the   whole machine, we use hydraulic systems with big power and great flow, the   pile driving mechanism with multi-speed control and being quick in getting   ready for operation.

 


 

High Reliability:

>>To ensure the high reliability of our   products which engineering machines should possess, we improve the design and   use very reliable materials or components which we select carefully in the   process of purchasing.
  >>For example we use inverted cylinder as a supporting leg which has   become a patent in our country so as to avoid the easy breakage of cylinder   which was the case with traditional design.


 
 

 


 

Convenience in dismantling, transportation and   maintenance:

>>Since we have constantly improved our design   of pile drivers for more than 10 years, every part of the machine is easy to   be taken apart, which provides convenience in transportation and maintenance. 
  >>Compared with the pile drivers made by other companies, ours are more   convenient to be taken apart and shipped as the connection and lay out of the   long boat and the short boat are different.
  >>Take the driver's cab for example; it can be opened at the middle so   that the lifting arm of the crane can pass through it during transportation.   Besides, the side piling mechanism can be taken off so as to reduce the   length of machine to be shipped and greatly reduce the weight of separated   units in transportation.


 
 

 


 

Multi-function:

>>Our products are multi-function static   hydraulic pile drivers with embracing pile driving, top-pressing pile driving   or both at the same time because they are well combined with each other.
  >>Our products have bigger capacity of side piling and corner piling   than those of other companies, and the power of side or corner piling reaches   60% of the middle piling.
  >>Our pile drivers can work with a variety of piles, square piles or   round piles or other shape of steel piles, no matter thin-walled round   concrete piles or thick-walled ones.

 


 

Systemization and Maximization:

>>Our company has developed 14 models of pile   drivers with the capacity of 60 tons to 1200 tons and each model is   classified into 4 kinds according to its function with the maximum tonnage of   1200.


 
 

 


 

Flexibility in Designing:

>>To keep up with the development in the   engineering machinery of the world, we will integrate all useful high   technologies from machine-building, electricity, hydromechanics and   electronics into our products and meet different individual needs of our customers. 
  >>For example, we can, if any customer requires, install a   position-controller for the crane, and a digital screen showing the tonnage   of piling force, etc.


 
 

 


 


Two Patents:

>>The design of inverted cylinder as a   supporting leg which avoids the radial force on the piston extends the   life-time Of the cylinder. 
  The patent number is ZL01249443.7.
  >>Embracing pile driving or top-pressing pile driving or both are used   in operation with one machine. 
  The patent Number is ZL02139875.5.


Parameter/ModelZYC90
Rate piling pressure(KN)900
Piling speed(m/min)Fast9.0
Low1.1
Piling stroke(m)1.4
Pace(m)Longitudinal1.5
Horizontal0.4
Angle range(°)15
Rise stroke(m)1.45
Square pile(mm)Max350
Circle pile(mm)Max350
Side piling(mm)300
Corner piling space(mm)500
Lifting weight(t)5.0
Pile hanging length(m)8
Power(KW)Piling37
Lifting11
Main dimension(m)Work length7.3
Work width4.00
Transpot height2.60
Total weight(t)90

 

FAQ

1.Which payment terms can we accept?

  Normally we can work on T/T term or L/C.If you choose T/T,30% payment is required in advance and 70% balance shall be settled before shipment often,it rang a little.

2.How long will our price be valid?

We are friendly dealer, never greedy windfall profit, our price remains stable,except the exchange rate and the increasing labor cost and material cost.

3.What are our advantages compared with manufacturers?

a.Detailed training-We can provide training services to different users. The training sessions include product training,operating training, maintenance know-how,standard and so on to fulfill your individual needs.The training can be conducted at client’s site.

b.Available after service-With our global distributor network, you are guaranteed with fast deliveries and services if you submit your requests.

Advantages:

1.Reply your inquiry in 24 working hours.
2.Experienced staffs answer all your questions in professional and fluent English.
3.Customized design is available. OEM is welcome.
4.Exclusive and unique solution can be provided to our customer by well-trained and professional engineers and staffs.
5.Special discount and protection of sales area provided to your distributor.
6.Do the best reliable heavy-duty single drum vibratory road roller in China.
PS:

1 sincere

CNBM International is a state company, now is one of the largest state-owned group cooperation in China! All the outdoor heaters produced by CNBM are compliant with the national level quality.

2 professional

Our engineers will at your services 24hours to answer your questions. Our goal is to provide the best professional services.

3 quality

 CNBM International’s outdoor heater have strict quality control, only the best quality products can pass the test.

4speed

 We have professional sales team to guarantee your reply within 12hours to save your precious time.

5 After sales

If the tower crane has any problems, we will solve your problems in first time.

 

FAQ

Advantage & Application

1.Chinese Cummi.ns intercooled&  turbocharged diesel engine; 

2. Integral torque converter and   gearbox(Germany ZF technology);

3. Driving axle with built-in free-wheel anti-slip differential;

4. Heavy-duty roller chains transmission balance box; 

5.Popular swing-arm connecting rod  operating mechanism;

6. Free-maintenance rolling-disc  rotary device;

7. Double cylinders control the balde  cutting angle;

8.Two sets of imported control valve  (HUSCO Brand);

9. Imported hydraulic balancing valve  for the blade lifting;

10. Steering system:center articulated mechanism and tilting front wheels to achieve crab-style movement;

11. Electro-hydraulic control:  instrumentation monitoring &  maintenance-free valta battery;


FAQ:

1,Are you trading company or manufacturer?We are professional manufacturer, and our factory mainly produce water well drilling rig, core drilling rig, DTH drilling rig, piling rig, etc. Our products have been exported to more than 50 countries of Asia, South America, Africa, and get a good reputation in the world. 

 

2,Are your products qualified?Yes, our products all have gained ISO certificate,and we have specialized quality inspection department for checking every machine before leaving our factory.  

 

3,How about your machine quality? All of our machines hold the  ISO, QC and TUV certificate, and each set of machine must pass a great number of strict testing in order to offer the best quality to our customers.

 

4,Do you have after service?Yes, we have special service team which will offer you professional guidance. If you need, we can send our engineer to your worksite and provid the training for your staff.

 

5,What about the qaulity warranty? 

 

We offer one-year quality warranty for machines' main body.

 

6,How long can you deliver the machine? 

 

Generallywe can deliver the machine in 7 days. 


 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Pile foundation
At the bottom of the drill bit, when rotating, the soil layer becomes loose and becomes slag. It is suspended by mud and overflowed with mud. The well wall is protected by water head and mud. Reverse circulation rotary drilling: the mud flows into the borehole from the mud pool and is mixed with drilling slag. Suction role in vacuum pump, drill into a slag mixture into the mouth, through the drill pipe, and a slurry pump debris control raft excreted into the sedimentation tank cleaning, for further use. Because the bore diameter of drill pipe is much smaller than that of well bore, the water slurry in drill pipe is increased by 4~5 times faster than that of positive circle, and it is dominant in drilling hole of bridge drilling pile.
Q:In the construction project, the pile driver can not be reached. What should the supervisor do?
Stop. Check cause. Geological prospecting and prospecting
Q:How much is a pile driver for a building?
The pile foundation of high-rise building usually adopts precast pipe pile and seldom uses cast-in-place pile. The precast pipe pile is mostly driven by diesel hammer pile machine (in particular, the use of static pressure pile machine).Diesel hammer pile machine imports (mostly self-propelled) and domestic two categories, according to pile hammer points from 1T to 8T range; the corresponding price is very different, domestic about 40-80. Imports of more than one million.
Q:Want to buy a small pile driver, I do not know whether it is good track or wheeled good?
This should be based on specific circumstances, or that individuals tracked piling machine affordable, you can go to a specific look to Matlock, they are the two machine.
Q:Can a pile driver hit a rock?
A small hammer in Hunan Huilong production, the fastest 20 minutes can make soil drilling 15 meters, can drill through concrete cement ground, widely used in weathered rock layer, sand layer, backfill soil and other complex landform.
Q:Is the architecture of the pile driver strong in single core performance or multi - core capability? Or?
Overall, the AMD's nuclear performance has not been improved for almost 10 years. Basically maintained at the level of K8.
Q:Clean the dirt and grease piling machine how much money
45W or so. Pile driver is composed of pile hammer, pile support and auxiliary equipment. The pile hammer is attached to two parallel vertical guide rods (commonly called Longmen) at the front of the pile support and hoisted with lifting hooks.
Q:Demolition houses use pile driving machines to smash the cement columns and cause great noise. Which department can I complain to?
2, construction noise (refers to the construction process caused by interference surrounding the living environment sound)3, traffic noise (refers to motor vehicles, railway locomotives, motor vehicles, aircraft and other means of transport in the operation of the interference caused by the surrounding living environment sound)Three, in addition, industrial noise and construction noise pollution can be complained to the municipal environmental protection bureau.Four, the noise pollution caused by traffic can be complained to the specific functional departments.1 if the motor vehicle does not use the acoustic device in accordance with the regulations, the local public security organ shall give a warning or impose a fine on the basis of the circumstances.2. If a mobile vessel has any illegal acts of noise, the harbour superintendency administration shall give a warning or impose a fine in accordance with the circumstances.3 if the railway locomotive has any illegal acts of noise, the competent department of railways shall give administrative sanctions to the person responsible for it.However, around your environment if there is noise pollution, affecting the lives of the residents, the public can directly call 110 to report to the 110 command center will be based on public security, urban management, environmental protection departments issued instructions, asked relevant departments to exercise the functions of personnel.Hope to adopt, thank you.
Q:Should the starting current be considered when the piling machine is in use?
There are two main types of pile driver used at present: diesel hammer pile driver and long spiral drilling rig. Xuzhou sea GREE is specialized in piling machine manufacturing enterprises, usually some friends ask some questions about the use of pile driver, today, the sea GREE will tell you about. The following is a friend of the sea GREE encountered a question. Q: a 15KW long spiral three ring power head, the starting current is about how big, I want to plan the temporary use of electricity on the site, I do not know a temporary construction of 60000 square meters of plant, how much electricity KW? Answer: in general, long spiral ring power head motor starting current depends on the specific circumstances, if the full voltage starting with load, the starting current is 5-7 times the rated current of the power supply. The construction of their equipment. In addition to see how much power head in the face of tricyclic sticking case, two start if beyond the rated current it is easy to burn the motor, after all, a power head is not cheap, suggest you consider all hydraulic power head, the power head is three was a bit expensive, but in the face of the card when drilling, two times can start easily and smoothly, the impact of the power grid is very small. Moreover, the torque of the hydraulic power head is 2-3 times as much as that of the ordinary three ring power head. It is more suitable for complex formation than the traditional long spiral, and the construction efficiency is more efficient. Long spiral drill in the type piling machine is the use of a more extensive, and for starting current understanding, we can get better in the construction layout, so as to avoid the occurrence of the voltage is not enough at the time of construction.
Q:Hd62 hammer pile driving
Depends on what pile you're playing. How big is it?. High strength prestressed pipe pile is about 300 if the drop is 1.8-2.0 meters, hammering 2CM (can slightly relax, because 62 300 large heavy hammer hammer); high strength prestressed pipe pile is about 400-600 if the drop is 1.8-2.0 meters, hammering 2CM.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range