WPC Door Frame Highly Resistant to Mositure and Termites

Ref Price:
Loading Port:
China main port
Payment Terms:
Min Order Qty:
8 m.t.
Supply Capability:
200 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1> What is WPC?


WPC, simply for wood plastic composite.

Wood Plastic Composite is made from a unique combination of plant fiber and recycled plastic

according to high-tech formula.

It offers the best advantages of plastic and wood. The plastic shields the wood from moisture and

insect damage, and the wood protects the plastic from UV damage and gives you a natural feel.

It has characteristics of high strength and rigidity, acid and alkali resistance, corrosion resistant

and without formaldehyde, it is a real green environment protection building material.


2> Why choose WPC decking?


 Natural colour
 Resistance to water, rot and crack
 Guaranteed to last
 Low maintenance
 Beautiful and broad range of finish


3> What are the main kinds of WPC currently?

Door frame

Wall panel


Wardrobe door panel




Product Description




4> Specification of WPC?





Moisture Resistance


Water absorptive

Rot Resistance


Rot except special treating

Split Resistance

No Cracked

Cracked by weathering effect

Distortion Resistance

Almost no Contraction/expansion

Distorting effected by chang of 

moisture and temperature

UV Resistance

High Grade UV Resistance

Easily effected by UV

Fading Resistance

Almost no

Easy to fade

Outdoor adaptability


Only few of treatedowood adaptive

No need painting

No need

Need paint periodically


> 8-15 years

< 3 years< span="">

Various Configuration

Extruded via various mould


Environment Effect

Recyclable 100%

Consume woods




 made in china best selling wpc door frame




Company Information




5> About CNBM and It’s WPC products


China National Building Material Corporation (CNBM), long history since 1984 is one of the top 
fortune 500 corporation and central enterprise with total assets of more than $20 billion and 
120,000 staff. 
 Our unique advantages: 
 Preferential payment terms 
 good and reasonable price 
 quality guarantee -- CNBM won't let a single small deal ruin our reputation and brand, so quality is

 our lifetime. 
 professional team for CRM order processing & QA & logistics 
 global logistic database, originated from Dubai






Packaging & Shipping




6> How to buy and concerned terms

MOQ – 800m per item 
Lead time—2 weeks 
Departure port—Shanghai 
Package-- PE film, carton box or 2pcs.bundle, treated pallet


7> Certificates and Quality guarantee

Certificates – CE&ISO 9001 complied 
Warranty—10 years 
Quality guarantee—test report for each order under the strict management system


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Do you want to install a seal tape for steel windows
Some, the People's Republic of China Construction Industry Standard JG / T187-2006 Building doors and windows with sealing tape
Q:The settlement area of the doors and windows is calculated by what size
They may live on the C-1 actual size, but should be expressed as: 1675x1185. Just 1185 looks like it is a bit small.
Q:I would like to ask the doors and windows to install the master, the frame installed after the glue is good, or wait until the next glass together with plastic?
Glass installed a piece of plastic is the last thing else or else trouble again
Q:Common doors and windows installed several ways? What are the advantages and disadvantages?
Doors and windows of the installation methods are plug and mouth two "plug" installation of this installation method of steel doors and windows of the size requirements of strict, otherwise it is not put into the gap is too large. At the same time the window plaster also requires accurate size. And asked to wipe into the mouth type: that is, within the narrow width, so after the installation is complete, both inside and outside are playing full of sealant, the middle to play PVC foam agent "mouth" to install the steel window size requirements are not very strict, After the window frame can be carried out indoors and plaster. As the plaster is done by the construction workers, so the gap between the window frame and the wall is not necessarily able to handle. In addition to the installation before the use of packaging with the window to protect the finished product, wiping the gray after the packaging needs to be removed, so inside and outside the window frame and the wall will appear between the uneven size of the gap, playing sealant, it is impossible Playing evenly, as well as causing leakage.
Q:Bathroom, wash basin cabinet door mosaic
I have seen with the blockboard to do the backplane, with adhesive.
Q:Four-wheel positioning adjustment screw how to install
Four-wheel positioning requires tilting and pulling rods. Adjustment screw, extensive application of oil refining. Chemical. Car. Ship. Medical. Food. Packaging. Light industry and other mechanical equipment in the control system. Door frame adjustment screw, which is an easy-to-process, combined door and window frame adjustment screw consisting of a screw sleeve with a screw, which is provided with a longitudinal slit for said The first staples of the rear end of the screw are passed through the first-order hole of the screw sleeve, and the first-order hole is elastically deformed to expand its aperture so that the catching flange passes The front end of the first step hole is located at the front edge of the first stage hole and the rear end flange of the rear end of the screw is limited to the rear hole of the first stage hole, whereby the structure Easy, quick assembly of progressive benefits.
Q:What are the key points for the production and installation of wooden doors and windows?
2, the first fixed hinge side, to be close can not have a gap, up and down and left and right vertical, with screws or gun nails fixed; 3, door sets and the door frame pressure can not exceed 0.3mm, the line in the saw 45 ° angle when the corner to be straight, if burr, sandpaper sanding after the fight; 4, after installing the door, check whether the two sides are equal, the door is too large or too small , Some to open and close the page must be the first amount of accurate size, before processing, assembly page when the screw to play straight, lock to be firmly flush; 5, good product protection.
Q:Engineering materials inside the windows and doors hidden when to do? Is done in the main construction, or do the decoration when the doors and windows to do the decoration?
In the installation of doors and windows to do.
Q:What is the window frame section
Section is cross-section, take a 6M aluminum alloy material, the two incision is a cross-section
Q:Plastic window GB8814-88 what it means
GB8814-88 is the implementation of standards

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range