Resistant to Mositure and Termites WPC Door Frame

Ref Price:
Loading Port:
Payment Terms:
Min Order Qty:
8 m.t.
Supply Capability:
200 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1> What is WPC Door Frame?


WPC, simply for wood plastic composite.

Wood Plastic Composite is made from a unique combination of plant fiber and recycled plastic

according to high-tech formula.

It offers the best advantages of plastic and wood. The plastic shields the wood from moisture and

insect damage, and the wood protects the plastic from UV damage and gives you a natural feel.

It has characteristics of high strength and rigidity, acid and alkali resistance, corrosion resistant

and without formaldehyde, it is a real green environment protection building material.


2> Why choose Resistant to Mositure and Termites WPC Door Frame?


 Natural colour
 Resistance to water, rot and crack
 Guaranteed to last
 Low maintenance
 Beautiful and broad range of finish


3> What are the main kinds of WPC Door Frame currently?

Door frame

Wall panel


Wardrobe door panel




Product Description of WPC Door Frame




4> Specification of WPC Door Frame?





Moisture Resistance


Water absorptive

Rot Resistance


Rot except special treating

Split Resistance

No Cracked

Cracked by weathering effect

Distortion Resistance

Almost no Contraction/expansion

Distorting effected by chang of 

moisture and temperature

UV Resistance

High Grade UV Resistance

Easily effected by UV

Fading Resistance

Almost no

Easy to fade

Outdoor adaptability


Only few of treatedowood adaptive

No need painting

No need

Need paint periodically


> 8-15 years

< 3 years< span="">

Various Configuration

Extruded via various mould


Environment Effect

Recyclable 100%

Consume woods




 made in china best selling wpc door frame




Company Information




5> About CNBM and It’s WPC Door Frame


China National Building Material Corporation (CNBM), long history since 1984 is one of the top 
fortune 500 corporation and central enterprise with total assets of more than $20 billion and 
120,000 staff. 
 Our unique advantages: 
 Preferential payment terms 
 good and reasonable price 
 quality guarantee -- CNBM won't let a single small deal ruin our reputation and brand, so quality is

 our lifetime. 
 professional team for CRM order processing & QA & logistics 
 global logistic database, originated from Dubai






Packaging & Shipping




6> How to buy and concerned terms

MOQ – 800m per item 
Lead time—2 weeks 
Departure port—Shanghai 
Package-- PE film, carton box or 2pcs.bundle, treated pallet


7> Certificates and Quality guarantee

Certificates – CE&ISO 9001 complied 
Warranty—10 years 
Quality guarantee—test report for each order under the strict management system


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Doors and windows installed
With the installation of doors and windows, the nail must be fixed on the concrete structure, is strictly prohibited in the masonry fixed, even if your block is made of concrete is not OK! If you can not be fixed in the concrete structure, you can not use the way to nail the door frame frame fixed, but should be used door and window frame embedded or indwelling embedded parts of the way to install.
Q:I would like to ask, the interior wall plaster door window frame a few centimeters ah, the external wall insulation board wiping the surface of the door window frame a few centimeters ah?
The thickness of the plaster is the thickness of the box.
Q:Common doors and windows installed several ways? What are the advantages and disadvantages?
Hello: doors and windows of the installation methods are plug and mouth two "plug" to install this installation method of steel doors and windows of the size requirements of strict, otherwise it is not put into the gap is too large. At the same time the window plaster also requires accurate size. And asked to wipe into the mouth type: that is, within the narrow width, so after the installation is complete, both inside and outside are playing full of sealant, the middle to play PVC foam agent "mouth" to install the steel window size requirements are not very strict, After the window frame can be carried out indoors and plaster. As the plaster is done by the construction workers, so the gap between the window frame and the wall is not necessarily able to handle. In addition to the installation before the use of packaging with the window to protect the finished product, wiping the gray after the packaging needs to be removed, so inside and outside the window frame and the wall will appear between the uneven size of the gap, playing sealant, it is impossible Playing evenly, as well as causing leakage.
Q:What is the box method installed in the doors and windows?
Sub-box installation is another way to install plastic doors and windows. It is in the hole to install a sub-box, sub-box in the foot directly into the cement mortar wall, sub-box installation must ensure that the horizontal and vertical, so that the installation of the window can be achieved to achieve horizontal and vertical. With this installation method, the doors and windows frame and the wall completely out, and can be completed in the cement mortar after all, so it will not cause pollution. In addition, due to the use of the sub-box, so that the installation quality of doors and windows easier to get control, but also reduce the plastic doors and windows due to thermal expansion and contraction caused by the expansion and contraction.
Q:The installation of the horizontal lines, vertical lines and out of the line, respectively, what is the use of what in the end
The horizontal line of the window to determine the level of the installation of the window; entry and exit line on the window side and the inner wall of the flat, or highlight the size (press Decoration requirements), steel windows, aluminum windows every wall center line.
Q:Glass curtain wall and doors and windows to do what information? Do you want to do some information when you install the doors and windows frame? The
Sub-box, lightning protection, waterproof, the main frame and the sub-frame connected to the screws, these are hidden, to cover the acceptance records, the rest do not need to attach the form, the main frame is installed, with inspection batch form, glass ibid.
Q:There are doors and windows installed with main and auxiliary boxes
Plus the skin are generally have a gap of about 3 mm design itself is to stay good to put the skin to strengthen the watertight
Q:Plastic window around the gap with cement plug or foam plug?
Plastic window around the gap should be the first use of blowing agent, foam agent dry after the removal of excess parts, and then cement mortar paint, and finally do waterproofing.
Q:Paving mosaic construction process
Double gull nostalgic mosaic can be used for indoor and outdoor floor and wall decoration. For construction paving, the most critical job is to prepare the surface of the site. Tiles must be in the horizontal and vertical angle are accurate and accurate paving, so as to avoid problems. Paving the surface must be clean and dry. Paving materials: the market has a professional mosaic tile adhesive and sealing agent, there are two-in-one tile glue. Color is also a variety of points, according to different needs with the use of cement and sealant. The most widely used is white and black. Paving tools: grouting floating, large bucket, V-shovel, hammer, small bucket, pliers. Paving steps: 1. In the vat inside the mixed powder-like mosaic tile glue, stirring at the same time by adding water until peanut butter to achieve similar viscosity. 2. In the construction of the wall, then use the v-type shovel. Each post a paste From the middle of the patch area to start paving out. In the wall with the horizontal line and the vertical line for the mark, you can make the gap between each paste evenly. Hand the appropriate force to the mosaic into the tiles inside, so that mosaic and ceramic tile full contact. 3. Paste finished or close the mosaic, you need to paste a paste on the match mosaic. With a piece of wood and a hammer, gently tapping to adjust the position of the mosaic. Need to pay special attention to the edge and connection of each mosaic. 4. If necessary, adjust the mosaic position in time before the mud is dry. 5. Allow the mud to have a 24 hour posture before filling. 6. Dry the sealant for 10-20 minutes, then gently wipe the mosaic surface with a piece of wet sponge. 7. Finally, wipe with a piece of lint-free cloth out of the mosaic surface of the remaining cement and caulking agent.
Q:How to deal with the lower part of the aluminum window frame
Broken bridge aluminum door window frame how to deal with: a large number of doors and windows before installation, should first install the sample doors and windows, after passing the acceptance, before a large number of installed. For the same type of doors and windows and their adjacent upper, lower, left and right openings should be kept line, the hole should be horizontal and vertical. Doors and windows should be placed in a clean, flat place, and to avoid sun and rain, and shall not be in contact with the corrosive; doors and windows shall not be directly touch the ground, the lower part of the placement of wood should be placed, and should be placed, vertical angle should not be less than 70 degrees , And should take anti-dumping measures. Should be measured in the middle of the window, and one by one to make a mark, multi-storey building, from a high-level hanging; installation window frame should be aligned with the center line.

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range