• Tower Cranes self-ascending Hammer Head QTZ125( 6015) System 1
  • Tower Cranes self-ascending Hammer Head QTZ125( 6015) System 2
  • Tower Cranes self-ascending Hammer Head QTZ125( 6015) System 3
Tower Cranes self-ascending Hammer Head QTZ125( 6015)

Tower Cranes self-ascending Hammer Head QTZ125( 6015)

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

QTZ125( 6015)  Description

Feature: Tower Crane                   Condition: New 

Application: urban construction     Rated Loading Capacity: 1.0T 

Rated Lifting Moment:500KN.M     Max. Lifting Load: 5T 

Max. Lifting Height:30M                 Span: 50M 

Model Number:  QTZ125( 6015)

Certification: ISO9001:2000; CE;Ukraine & Belarus Certificate 

Colour: Orange/ Yellow 

After-sales Service Provided: Overseas third-party support available 

QTZ125( 6015)  Features

1.Ten years of experience in supplying new self-erecting tower crane with Taiwo Brand.

2. Export to more than 20 countries with CE/ISO/GOST Certificates.

3. Stationary/Travelling, external/ internal climbing tower crane 

4. Impeller blasting/rust protection paint

5. Advanced painting process

6. Potain masts designed with dismountable panels, making teansport easier and cheaper. 

7. New designed mast, can be used to Internal and external climbing tower crane

8. Engineers available to service machinery overseas.   

QTZ125( 6015)  Specification

Tower Cranes self-ascending Hammer Head QTZ125( 6015)

 QTZ125( 6015)  Pictures


Tower Cranes self-ascending Hammer Head QTZ125( 6015)

Tower Cranes self-ascending Hammer Head QTZ125( 6015)

Tower Cranes self-ascending Hammer Head QTZ125( 6015)

QTZ125( 6015) FAQ

Q: What can we do for the clients in the market and after-sale service?

A: There is branch office for us in the kingdom and she could provide any commercial assistance for the clients; our exclusive agent would fully represent lifting machinery for business communication and rapid & professional technical support.

 

Q: What is tower crane?

A: Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.


Q:I used to buy a new tower crane that was attached to someone else's unit and (the key Gou Er). Now I have set up a company myself and bought a key, Gou Er. The question is, now how can I put it back from someone else's key dog and bring it back to my own dog?Know about the urgent urgent urgent urgent call to inform the mobile phone can ah ~ ~ ~ ~ ~ ~ thank you!
Measures for the record and registration of construction hoisting machineryArticle 1 These measures are formulated in accordance with the provisions on the supervision and administration of the safety of construction cranes' machinery (Order No. 166th of the Ministry of construction) in order to strengthen the management of the record and registration of construction cranes.The construction and registration of the hoisting machinery as mentioned in the present Measures shall include the registration of the lifting machinery, the installation (disassembly), the notification and the use of the registration of the second.Third construction departments of the people's governments at or above the county level may use the computer information management system to handle the registration and registration of construction hoisting machinery, and establish a database.The construction administrative department of the local people's government at or above the county level shall provide the registration and registration and inquiry service of the building hoisting machinery within its administrative area.Article fourth rental, installation and use of units shall be submitted in accordance with the provisions of the lifting of construction machinery registration information, and the authenticity of the information provided by the responsible.The construction administrative department of the local people's government at or above the county level shall establish a system for the examination and registration of the hoisting machinery.Fifth construction machinery rental units or purchase building lifting units (hereinafter referred to as the "property units") in the construction machinery rental for the first time or before the installation, should be registered at the competent construction Department of the local people's governments at or above the county level to the unit of business (hereinafter referred to as the "equipment registration authority") for the record.
Q:In Catching Fire Katniss hangs a dummy with the words Seneca Crane on it. Who is that? It sounds familiar...
Seneca Crane
Q:The rated lifting capacity of a tower crane refers to what is allowed and what is allowed to be divided by the crane
The total quality of the crane rated liftingweightincludes the lifting load and the hook and rope a simplified example, such as the rated lifting weight of 100 tons, the quality of the hook and spreader for 5 tons, the actual quality of the goods can lift 95 tons.
Q:What kind of bodies are tower cranes made of?
First, the working mechanism of tower cranesThe working mechanism of tower crane is usually composed of lifting mechanism, luffing mechanism, slewing mechanism, hydraulic jacking mechanism and running mechanism.The hoisting mechanism to realize heavy vertical up and down movement; luffing mechanism and slewing mechanism to achieve weight moving in two horizontal directions; hydraulic lifting mechanism of standard section, increase or decrease, so as to increase or decrease the tower; range of weights can achieve walking mechanism in tower crane and force of arbitrary space motion.
Q:Calculate the work the crane performs.
Crane work = weight to be lifted x 6.95 m Weight to be lifted = 2.75x10^3 N + 1.20 m^3 (2.00 x 10^3 kg/m^3) (9.8) = 2750 + 23520 = 26270 Therefore, Crane work = 26270 x 6.95 = 182576.5 J
Q:What is the safe distance of a tower crane to the surrounding buildings?
JGJ160-2008 "construction site mechanical equipment inspection technical regulations" on the 46 page clearly written, safety distance shall not be less than 0.6 meters,
Q:How much is a team of 40 tower crane
Tower crane rental generally do not rent pricing, can not count number, not today is installed, removed tomorrow!Usually on a monthly basis, with or without use!
Q:How much height should tower crane work at M?
Try to ensure that the tower crane in the wind is too large to be free of rotation. The safe distance between the rear arm of tower crane and adjacent buildings shall be no less than 50cm. The safe distance between tower crane and power line meets the requirement.
Q:a/ Calculate the lift workb/ What is the power used by the crane when the efficiency is 60%? (Can you explain for me what efficiency means)c/ What will the kinetic energy of the load be when it hits the ground, if it falls from the height 8.5 meters, g=9.81 m/s^2Thank you.
I wonder if you saw my response to the additional question you asked of my previous answer to this question .. To see my response .. go to your previous question and click on comment in the Action Bar (below 'Asker's Rating')
Q:How does the torque of a construction crane relate to the torque of a car?
In an automobile, you are looking for torque over a wide range of speeds and loads. A crane does not need to have a great deal of speed in terms of lifting an object but does need a great deal of torque. The result is an automobile needs much more horsepower to meet its goals while a crane can actually lift a huge load with a much smaller amount of horsepower. I personally can remember a lift on one of the construction projects I was field engineer on. The lift of 650,000 pounds was made with two 85 horsepower Ford gasoline engines and two industrial gear boxes.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords