Tower Crane TC7034 Construction Sale Equipmen Building Machinery

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Tower Crane TC7034 Description:

1.CMAX Tower Crane TC7034  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC7034 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC7034 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC7034  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC7034  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC7034 Parameter:

 Max. working range 70m, tip lifting weight 3.4T and Max. lifting weight 12T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50

Max height with attachment (m) 200

Working range can be adjusted (m) 50、55、60、65、70

Min working range (m) 2.5

Max lifting capacity (t) 12

Tip load @ 50m (t) 3.4


Tower Crane TC7034  Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC7034 Diagram:

Tower Crane TC7034 Construction Sale Equipmen Building Machinery

Tower Crane TC7034 Construction Sale Equipmen Building Machinery

Tower Crane TC7034 Technical Sheet:

Tower Crane TC7034 Construction Sale Equipmen Building Machinery

Tower Crane TC7034 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC7034 for example, the first two letters “TC” means Tower Crane, “70”means jib length is 70 meter, and the last two letter “34” means the tip load is :3.4 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:how do they get counter-weights onto high cranes?
The top section of a tower crane, including the cab, boom, and counterbalance, is erected on the crane's base, using a portable crane. After that, there is a mechanism on the tower crane that jacks up the top and allows another tower section to be inserted under it to increase the crane's height.
Q:Minimum QTZ63 tower crane special electric box open for many A
QTZ63 tower crane with air and leakage protection:Minimum three-phase air switch not less than 100A; at the same time leakage protector is not less than 100A three-phase four wire system leakage protection.Maximum three-phase air switch not greater than 150A; at the same time, leakage protector is not more than 150A of three-phase four wire system leakage protection.
Q:a crane lifts load of 500kg mass to a distance f 20m in 10s at a constant velocity. how much work is done?
a lot
Q:Paper cranes... What do I do?
Okay - so if you can't string them from the ceiling - than what I would do is buy some round vases/globes, from Pier one or some place like that, and fill them with paper cranes, then set the bowls on your shelves/windowsill/desk/table or other flat surface. I've enclosed some examples below. You can also make a mobile by hanging something like a super strength hook with adhesive. 3M makes them (the same folks who created scotch tape). The adhesive does not damage walls and you can stick them to anything. They can bear up to 30 pounds of weight. Put a few on your ceiling or walls and hang your mobiles from them.
Q:What is a CCRadio ? (C. Crane)?
C Crane Company sells shortwave receivers. You can use it to listen to shortwave broadcasts, marine weather, NIST time signals, foreign broadcasts, clandestine broadcasts.
Q:Like pygmies we fight with cranes?
Thoreau, okorder.com/
Q:Construction tower crane driver (T) Ben can be used as construction crane driver (S)?
Building crane driver (T); tower crane driverConstruction crane drivers (S); construction elevator drivers; neither is common.
Q:I Need Help Healing an Injured Crane Fly?
Well, it looks like they only have a lifespan of a 2 weeks at the most, so I'd just make him comfortable and let nature do its thing. According to Wikipedia, adult crane flies don't really eat--they just hang out and mate... If you really want, I suppose you could put some sugar water in a bottle cap or something for him.
Q:can some one give me contact details for O & K Marine Crane Manufacturer?
there okorder.com/
Q:What controls are needed for the 'average' tower crane?
There are only two control levers that are on a tower crane.There is one on either side of the seat called joy sticks the right side joy stick controls the hoist cable to go up and down pushed forward to go down and pulled back to hoist up.The left has four functions it controls the swing of the crane and also the boom of the crane to control the swing you push the lever to the left to swing left and push the lever right to swing right.You pull the lever back to boom up and puh it forward to boom down.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range