• Tower Crane TC7021 Construction Equipment Building Machinery Distributor Sales System 1
  • Tower Crane TC7021 Construction Equipment Building Machinery Distributor Sales System 2
  • Tower Crane TC7021 Construction Equipment Building Machinery Distributor Sales System 3
  • Tower Crane TC7021 Construction Equipment Building Machinery Distributor Sales System 4
Tower Crane TC7021 Construction Equipment Building Machinery Distributor Sales

Tower Crane TC7021 Construction Equipment Building Machinery Distributor Sales

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Tower Crane TC7021 Description:

1.CMAX Tower Crane TC7021  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC7021 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC7021 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC7021  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC7021  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC7021  Parameter:

 Max. working range 70m, tip lifting weight 2.1T and Max. lifting weight 12T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50

Max height with attachment (m) 200

Working range can be adjusted (m) 40、45、50、55、60、65、70

Min working range (m) 2.5

Max lifting capacity (t) 12

Tip load @ 50m (t) 2.1


Tower Crane TC7021   Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC7021Diagram:

Tower Crane TC7021 Construction Equipment Building Machinery Distributor Sales

Tower Crane TC7021 Construction Equipment Building Machinery Distributor Sales

Tower Crane TC7021 Technical Sheet:

Tower Crane TC7021 Construction Equipment Building Machinery Distributor Sales

Tower Crane TC7021 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC7021 for example, the first two letters “TC” means Tower Crane, “70”means jib length is 70 meter, and the last two letter “21” means the tip load is :2.1 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Q:I am going to make 1000 paper cranes like Sadako Sasaki did. I am doing it to remember the victims of hiroshima and nagasaki and all the others who died as a result of wwii. especially sadako sasaki who, though she died in 1955, she was poisoned by the toxic gases in hiroshima. what do you think of my project, and got any tips to help?
Aw, it somewhat is particularly stunning! And the attempt will raise your spirits, i'm particular. From what i can discover, they are oftentimes strung at the same time, 25 strings of 40 cranes each and each. Then the 25 strings are tied at the same time and the mass would be hung up. putting them interior the water is a foul concept for the water. that is an incredible form of soggy, colored paper polluting the water, so i wouldn't try this. purely a tenet, i could string them as is classic, and while your mom has enjoyed them a jointly as, donate them to an area charity like a infant's wellness facility. wish your mom has extra stable days than undesirable, and that if she would be able to be cured, she's cured quickly! Oh, no, they do no longer take in an incredible form of room. bypass examine the wiki article on 1000 cranes and you will see %.. They carry at once down, and take in little or no room.
Q:Okay, well obviously, in The Legend of Sleepy Hollow,he was ugly, but wat exactly made him ugly?? it tells you, but its way too complicated for me. Could anybody just make it... simpler?
His okorder /
Q:How much do you know about construction cranes??
The okorder / to have a look!
Q:A crane lifts a 1265 kg steel beam vertically 26 m, it then stops and swings the beam 3 m horizontally into a position where the welders can secure it into its proper position. What is the work done on the beam by the crane? What is the work done by the force of gravity on the beam?
the work done on the beam by the crane = 1265 * 9.81 * 26 + 1265 * 9.81 * 0 = 322651 J answer work done by the force of gravity on the beam = 1265 * 9.81 * 26 + 1265 * 9.81 * 0 = 322651 J answer
Q:Any difference?
The crane part can be identical, but the vehicle part differs: in the former case it's a road-going (even multi-axle) truck, in the latter case it's an off-road vehicle with oversize all-terrain tires and appropriate traction and transmission capabilities. In either case, the vehicle must be stabilized on adjustable hydraulic struts before hoisting.
Q:any kind of sayings
whoops big whoop don't walk under a crane secure the crane
Q:How To Make Origami Crane?
You okorder and see how to make origami crane step by step
Q:I want to make a sculpture out of 1,000 paper cranes. I have sometime to work on it, but not months. Has anyone ever known someone to do this, or done this themselves? How much time should I allow for such a project?
It depends on how big they are, and how fast you are at folding. If you can fold one crane a minute, 1000 minutes would translate to about 17 hours. How you then spread out 17 hours of paper folding is up to you.
Q:For my science fair project we have to build someething using simple machines, me and my partner decided to do the crane, but we havent been able to find any place that shows intructions on how to build it. If you can please included a step by step plan, the things you will need ( whether or not they are hard to find/ and if so where i might be able to find them ), and your sourcetruely i appreciate this sooo much thankyou in advance everything counts so please make it as detailed as possible and if you know any other sites that show please include thank you sooo much :)
you are totally just trying to avoid doing this work by yourself. anybody with two eyes can just look up crane on google and learn how it works. they are super simple just go to the library or something. or better yet go look at a real crane.
Q:Could anyone tell me how they erect a construction crane.Some how they just are suddenly THERE, as If by magic.It seems as though the Boom part of the crane must be kind of JACKED up into place.That is the only way I can see them getting those GIANT concrete blocks into the back end of the boom. It doesn't seem possible otherwise. The only other thing I can thing of is the bulk of the pieces are brought in by helicoper and attached.Everything kind of makes sence except the Giant concrete blocks used as a counter weight. ALSO, if the blocks are needed to act as counterweigth to the CRANE itself..why doesn't the Crane fall over when it picks stuff up???
How do they erect the construction cranes? Not very well according to the news of them toppling down of late. Seriously, the cranes are lifted upward one or two floors at a time as the building progresses upward - this is usually accomplished by pulling them up into place with heavy cables and powered winches.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords