Tower Crane TC7050 Construction Equipment Building Machinery Distributor Sales

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Tower Crane TC7050 Description:

1.CMAX Tower Crane TC7050  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC7050 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC7050 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC7050  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC7050  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC7050 Parameter:

 Max. working range 70m, tip lifting weight 5T and Max. lifting weight 20T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50

Max height with attachment (m) 200

Working range can be adjusted (m) 50、55、60、65、70

Min working range (m) 2.5

Max lifting capacity (t) 20

Tip load @ 50m (t) 5


Tower Crane TC7050 Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC7050 Diagram:

Tower Crane TC7050 Construction Equipment Building Machinery Distributor Sales

Tower Crane TC7050 Construction Equipment Building Machinery Distributor Sales

Tower Crane TC7050 Technical Sheet:

Tower Crane TC7050 Construction Equipment Building Machinery Distributor Sales

Tower Crane TC7050 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC7050 for example, the first two letters “TC” means Tower Crane, “70”means jib length is 70 meter, and the last two letter “50” means the tip load is :5 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Quotes from Thousand Cranes?
Yasunari. okorder.com/
Q:two cranes that are directly opposite of each other are used to lift a 2000lb. cargo container from a ship.?
All I can say is.. Big crane make big thing go up.
Q:Stringing Paper Cranes Together?
You poke a hole in them and string them....
Q:How can i get my crane operator license from a company i quit?
contact whatever agency issued the license in the future, remember to keep the original yourself and give the company a copy
Q:do cranes have any symbolic purpose?
Cranes Symbolism
Q:How were Railroad Steam Engines from 1830 to 1890's recovered before the advent of the Wrecker Steam Crane.?
Its been carried out till now, many early vehicles have been steam powered. genuine it may burn renewable fuels alongside with trees, inspite of the undeniable fact that it has to hold those fuels with them (check out a steam loco - extensive soft or coal that's extra compact capability than trees) draw back may be the load of the part of get the overall performance needed, the smoke (and then smog), and the capability needed totransport the boiler, water tank and gasoline till now you even thinkabout the burden it is going to hold. extra suitable for busses could be to pehaps generate electrical energy and grant that to the bus - and thats been invented too -a tram! reward are that the gasoline doesnt could desire to be carried with the vehicle (extra useful - lighter), brakes canbe used to generate electrical energy, cleanser inthe cities, and the turbines could have scrubbers on the chimneys to take out the harmfull gasses
Q:What is the torque limiter of the tower crane A: the lift is stopped when the lifting torque is exceeded. B: over gravity
The torque limiter acts as follows: (a)In lifting process, when the weight of the lifting object moves ahead of the trolley when the lever force exceeds the moment limiter, the hook rises, the motor and the trolley forward motor are stopped at the same time, and the utility model has the safety function.
Q:how do you say paper crane in japanese?
Origami is paper folding in general, whereas 折鶴 おりづる oridzuru means folded paper crane, or in context, people just use tsuru (crane).
Q:How do they put cranes on the top floors when constructing high Sky Scrapers?
The cranes are built in the elevator shafts and moved up as needed during work progress.
Q:Which U.S. city has the most Tower Cranes working?
We have been told that our state bird was a crane. That's because there are so many of them here all the time. Construction is booming in Oklahoma. I think most of them are coming from the east and west coasts. They can get a much larger house here for a whole lot less. They are sold when they are being built.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range