Tower Crane TC4808 Construction Sales Equipment Wholesaler

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Tower Crane TC4808 Description:

1.CMAX Tower Crane TC4808  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC4808  can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC4808 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC4808  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC4808  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC4808  Parameter:

 Max. working range 48m, tip lifting weight 0.8T and Max. lifting weight 4T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 31.5

Max height with attachment (m) 110

Working range can be adjusted (m) 38、43、48

Min working range (m) 2.25

Max lifting capacity (t) 4

Tip load @ 48m (t) 0.8


Tower Crane TC5013   Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC5013 Diagram:

Tower Crane TC4808 Construction Sales Equipment WholesalerTower Crane TC4808 Construction Sales Equipment Wholesaler

Tower Crane TC4808 Technical Shee:

Tower Crane TC4808 Construction Sales Equipment Wholesaler

Tower Crane TC4808 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC4808  for example, the first two letters “TC” means Tower Crane, “48” means jib length is 48 meter, and the last two letter “08” means the tip load is :0.8 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:how much does a crane operator make ?
don't know
Q:Do crane flies bother people?
I use an electric flyswatter to take out flying pests. For tonight, why not just put cotton in your ears to sleep? Most insects have very short lifespans, so it's not likely to keep bugging you (pun intended) for long!
Q:in the short story open boat by stephen crane how does he define Fate?
Without doing your work for you, Crane is a naturalist. They believe nature works at random, and is completely unsympathetic to man's plight in the process. Hence, the oiler dies. He was probably the strongest one in the boat. So, how does that translate into the concept of fate?
Q:Method for operating tower crane
2.21, drivers must pass the escalator up and down, up and down the escalator, hand tools are prohibited items.2.22 do not drop any objects from tower cranes or defecate.2.23 winter in tower crane operating room heating, should be taken to prevent electric shock and fire measures.2.24 any tower crane with an elevator must comply with the instructions in the elevator manual. No overloading or violation of the operating procedures.2.25 multi machine operation, should avoid two or more than two tower cranes overlap in the radius of rotation. Special circumstances, need to overlap operations, must be safe distance between the vertical arm to ensure the safe distance and the lifting of materials, and have reliable safety measures approved by the competent technical leadership before construction.2.26 jib cranes in heavy lifting off the ground after lifting, rotating and walking three actions can be done at the same time, but the amplitude only alone, strictly with variable load. A crane that allows variable amplitude loading shall not vary at full load or near full load.2.27 lifting hoist is not installed in the rotating part of the crane, lifting operations may not continue in one direction continuous rotation.2.28 a crane with a mechanical torque limiter must adjust the tonnage indicator of the overload limit device according to the radius of gyration and the rated load at that radius.2.29 bend rail subgrade must comply with the provisions of the crane should turn on the outer rail surface of the sand, rail, rail and wings painted with grease. The counterweight box shall be turned to the direction of the outward turn. It is strictly prohibited to do lifting or turning on heavy roads.
Q:Do they mention Seneca Crane by name in book 1 (The Hunger Games?)?
You know what? I thought they did but I just went through my copy again and I can't find any mention of him by name. I apologize for the incorrect answer I gave earlier.
Q:Where on millsberry is the chips ahoy crane/machine?
with the help of a methods the Oreo. there is extra ideas Double Stuf, the frosting is colored for the vacation journeys, Cakesters and Golden. they are ultimate dipped in a tall glass of milk and that i trust they actually have them in straw kinds now. Plus, you may pull them aside and lick the filling, you won't be able to attempt this with an Chips Ahoy.
Q:How do the cranes used to build tall buildings get put in place?
Large cranes are built in sections imagine like an erector set. When there is a large building to be built the crane arrives in smaller easier to manage pieces and assembled on site.
Q:Red badge of courage by steven crane??!?
A kid, full of beans, runs off to join the army to annoy his mum, but on the eve of battle suddenly becomes paranoid that he'll do something to disgrace himself through cowardice. (That's actually as far as I got in the book so far.) I am given to understand, though, that in his own mind at least he does disgrace himself and endeavours for the rest of the book to redeem his manliness. In that sense the story arc, or at least the character arc, is not dissimilar to The Four Feathers. The point of the story is to counterpoint the myths of warrior gung-ho and daring-do, and to analyse the inner anxieties and motivations of the individual, volunteer-citizen soldier, and by extension the expectations of society. The novel also presents the battlefield with an unprecedented realism; that is to say, Crane presents the actual fog of war that authors have always set out to clear.
Q:WHAT IS A WADDLE CRANE?
This okorder.com/
Q:Are there influence about Microwave and electromagnetic waves on the tower crane?
if the spread is just in the microwave communications channel or radio transmitting antenna in the vicinity, will be subjected to microwave and high-frequency electromagnetic waves Interference, even if it is in all the tower crane hook when the closing power is outage

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range