Tower Crane TC4808 Construction Equipment Wholesaler Sales
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Tower Crane TC4808 Description:
1.CMAX Tower Crane TC4808 is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.
2. Tower Crane TC4808 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.
3. Tower Crane TC4808 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
4.Tower Crane TC4808 has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on.
5.Tower Crane TC4808 has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.
Tower Crane TC4808 Parameter:
Max. working range 48m, tip lifting weight 0.8T and Max. lifting weight 4T.
Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.
Trolleying mechanism can provide two operation speeds.
Free standing height (m) 31.5
Max height with attachment (m) 110
Working range can be adjusted (m) 38、43、48
Min working range (m) 2.25
Max lifting capacity (t) 4
Tip load @ 48m (t) 0.8
Tower Crane TC5013 Packaging & Delivery:
40HQ container
20~25days after deposit
Tower Crane TC5013 Diagram:
Tower Crane TC4808 Technical Shee:
Tower Crane TC4808 FAQ:
1.What is tower crane?
Tower crane is a modern form of balance crane that consist of the same basic parts Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.
2. What is the meaning of the tower crane’s code?
Take Tower Crane TC4808 for example, the first two letters “TC” means Tower Crane, “48” means jib length is 48 meter, and the last two letter “08” means the tip load is :0.8 ton.
3. What is the principal to quote the right tower crane to the client?
First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.
- Q: I am going to make 1000 paper cranes like Sadako Sasaki did. I am doing it to remember the victims of hiroshima and nagasaki and all the others who died as a result of wwii. especially sadako sasaki who, though she died in 1955, she was poisoned by the toxic gases in hiroshima. what do you think of my project, and got any tips to help?
- Aw, it somewhat is particularly stunning! And the attempt will raise your spirits, i'm particular. From what i can discover, they are oftentimes strung at the same time, 25 strings of 40 cranes each and each. Then the 25 strings are tied at the same time and the mass would be hung up. putting them interior the water is a foul concept for the water. that is an incredible form of soggy, colored paper polluting the water, so i wouldn't try this. purely a tenet, i could string them as is classic, and while your mom has enjoyed them a jointly as, donate them to an area charity like a infant's wellness facility. wish your mom has extra stable days than undesirable, and that if she would be able to be cured, she's cured quickly! Oh, no, they do no longer take in an incredible form of room. bypass examine the wiki article on 1000 cranes and you will see %.. They carry at once down, and take in little or no room.
- Q: In the Pacific NW, what will get rid of Crane Flies in my yard?
- Crane Flies,aka Mosquito Hawks are beneficial insects and I would not get rid of them.
- Q: When you're training to work in construction, do you need to do a seperate course or qualification in order to be able to operate a crane? Or are all construction workers taught it in training?
- Of course you need specialised training! Crane operators have to sit several courses in safe crane operations. Crane operators tend to just work cranes and not help with general building work as they earn more money and it is only cost effective to have them on site when they are actually needing to use the crane.
- Q: How many meters is the tower crane installed on the edge of the deep foundation pit?
- Tower crane foundation, if set up in the foundation pit, the foundation is to pile other, general tower crane is to support the wall.Therefore, how far away from the foundation pit is determined by the distance from the retaining wall.According to the industry standard "technical specification for concrete foundation of tower crane tower crane foundation installation" (JGJ/T187-2009), the installation of tower crane foundation concrete should reach more than 80% of design strength, the tower crane foundation concrete design strength should reach 100%.
- Q: First Summary gets best answer...thanks!
- The City is covering itself by shifting the blame form a negligent city inspector to the crane company by charging its owner with Manslaughter Charges. This is typical of civil service personal who forget who they work for (We the People).
- Q: Where are levers used in and throughout the crane
- the boom itself can become a lever if the load lifted is greater than the cranes capacity and causes the crane to tip over--the weight acts upon the boom(lever)--the pivot point of the boom becomes the fulcrum and OSHA will soon drop by to find out why!
- Q: A. Power LinesB. WaterC. FiresD. Overturns
- Dangerous to whom and exactly what does overturns mean? Operators are most likely to be killed when a tower crane breaks (is this an overturn?) because the operator is several hundred feet up in the air in the cab. Hitting power lines can be risky to the operator if dumb but staying in the cab is likely to be safe (stepping out may kill in touching ground) Overturning a ground based crane is going to hurt someone in the area much of the time.
- Q: and it appears to be looking up at the sky?
- It isn't craned back, it is in whatever position it ends up in after the deer is killed by the careless driver.
- Q: where did the story originated from? how and why did it happened?
- It is Storks so parents didn't have to discuss sex with children at an eary age. My parents told me they found me on the church door step and took me home and adopted me because no one else wanted me. Nice huh? We have one family picture taken before I was born and even though we had a nice home and a nice cabin on a beautiful lake they said they couldn't afford to have another one taken...and they wonder why I have issues. lol
- Q: i was wondering
- I am not sure if it is true, but There is a myth that if a sick person makes 1000 paper cranes they will get one wish from god. Read the story Sadako and the thousand paper cranes.
Send your message to us
Tower Crane TC4808 Construction Equipment Wholesaler Sales
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords