TOWER CRANE TC3807 speed regulation by frequency control
- Loading Port:
- Qingdao
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
|
1. The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.
Model | Max.lifting capacity & work range | Max.work range & lifting capacity | Max.independent lifting height(m) | |||
Torque | Lifting capacity at max.boom length | Lifting capacity(t) | Work range(m) | Work range(m) | Lifting capacity(t) | |
QTZ31.5 | TC3508 | 3 | 11.59 | 35 | 0.8 | 29 |
TC3807 | 3 | 11.15 | 38 | 0.7 | 29 | |
QTZ40 | TC4208 | 4 | 11.6 | 42 | 0.8 | 29 |
TC4708 | 4 | 13.4 | 47 | 0.8 | 29 | |
QTZ50 | TC4610 | 5 | 11.9 | 46 | 1 | 36 |
TC5010 | 5 | 13.1 | 50 | 1 | 36 | |
QTZ63 | TC5013 | 6 | 13.72 | 50 | 1.3 | 40 |
TC5013A | 6 | 13.72 | 50 | 1.3 | 40 | |
TC5510 | 6 | 13.17 | 55 | 1 | 40 | |
TC5510A | 6 | 13.17 | 55 | 1 | 40 | |
QTZ80 | TC5512 | 8 | 12.68 | 55 | 1.2 | 45 |
QTZ100 | TC6013 | 8 | 14.45 | 60 | 1.3 | 45 |
QTZ125 | TC6014A | 10 | 12.4 | 60 | 1.4 | 50 |
QTZ160 | TC6020 | 10 | 15.2 | 60 | 2 | 52.6 |
QTZ250 | TC7030 | 12 | 20.4 | 70 | 3 | 45 |
- Q: Hello,I live in the St. Louis area of Missouri and during the summer, Crane Flies (I call them Mosquito Eaters) fly around all the time at night. I believe that it is normal for this type of bug to be nocturnal, but lately, I've seen them flying around, jumping around, and getting in the house DURING THE DAYTIME!! (AHH!!) :0 Is there any explanation for this? If so, is there anyway to reduce their population in and around my house? Thanks for reading.Ty
- Crane flies will probably be interested in the sunshine of the condo, so decreasing the light subsequent to the structure and what escapes from the home windows can help. They come from floor so it is rough to really do whatever to manipulate them.
- Q: Please no direct translations. I need the official name of the whooping crane in French.
- grue de huée
- Q: can anyone help me in telling me how to construct an electromagnetic crane or help me find a website which helps with the steps in constructing one. thank you
- www.okorder /.. Add a childs toy crane and you have a Electromagnetic crane Ta Da.......
- Q: the way u find them climbing with the building makes me wonder how they become this long and what is the mechanism for that
- The base and the arm can be expanded like the ladder of a fire fighter car.
- Q: What special operators should be equipped for the installation and disassembly of tower cranes?
- According to the requirements of the 2.0.3 specification: tower crane tower crane installation and disassembly operation should be equipped with the following: 1, hold a qualified safety assessment certificate of the project and responsible for the safety of people and machinery management personnel; 2, with construction qualification certificates for special operations of the construction hoisting machinery installation and disassembly, lifting work, special operation signal heavy drivers, riggers and other operations personnel. And an electrician.
- Q: Tower crane TC6013A-6-A2, what does "A-6-A2" mean later?
- QTZ100 in fact, there are two symbols behind T.M, which is used in the country.Q is lifting, T is tower, and Z is self elevating. The 100 is its lifting torque, which means 100 tons. Meters (T.M).
- Q: I have learned how to make crane but I just can't! I've watched about 6-7 videos for it and i still don't get it!
- If that doesn't help at all , try pictures with words . Here are my two favourite sites . They have good instructions and pictures . Really simple to understand .
- Q: Can anyone help me interpret the poem Fear by Hart Crane? or North Labrador?
- Analysing Poetry Close reading may seem like a foreign and unfamiliar approach to analyzing a piece of text. However, it can often yield insights that will help you to create a unique paper developed from your own interpretation of the text. To analyze the work effectively, it is useful to concentrate on specific components of literature used to build and reveal the themes in the work. This process will help you explain how a passage relates to central themes in the text allowing you to reach an intelligent and creative thesis for a literary analysis. First, choose a passage (or a series of passages) that intrigues you.
- Q: How many motors does the ZOOMLION TC6013A-6 tower crane use?
- Model: YZRDW225M-4/8 power: 24/24KW speed: 1420/725r/minDirect search {ZOOMLION QTZ80 (tc6013) _ crane Manual Part 1 (Part Two)}, can also be found.
- Q: how to make a magnetic crane on cheap price?
- The whole crane or just the lifting device? Not easy to be cheap in either case - the crane because of safety concerns and the lifting head because it requires a lot of now high priced copper wire, well insulated, and a hefty electrical source with long cables to get the power to the head. Best (probably) to buy used if you want to save money.
Send your message to us
TOWER CRANE TC3807 speed regulation by frequency control
- Loading Port:
- Qingdao
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords