Tower Crane Split in row of weight QTZ125(6015)
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
QTZ125(6015) Description
Feature: Tower Crane Condition: New
Application: urban construction Rated Loading Capacity: 8T /10T
Rated Lifting Moment: 125MT Max. Lifting Load: 6T
Max. Lifting Height: 200M Span: 60M
Model Number: QTZ125(6015)
Certification: ISO9001:2000; CE;Ukraine & Belarus Certificate
Colour: Orange/ Yellow
After-sales Service Provided: Overseas third-party support available
QTZ125(6015) Features
1.Thirteen years of experience in supplying new self-erecting tower crane with Dahan Brand.
2. Export to more than 20 countries with CE/ISO/GOST Certificates.
3. Stationary,Travelling, external,internal climbing tower crane
4. Impeller blasting,rust protection paint
5. Advanced painting process
6. Potain masts designed with dismountable panels, making teansport easier and cheaper
7. New designed mast, can be used to Internal and external climbing tower crane
8. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor
9. Engineers available to service machinery overseas.
QTZ125(6015) Specification
QTZ125(6015) Pictures
QTZ125(6015) FAQ
Q: What is tower crane?
A: Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.
Q: What is the principal to quote the right tower crane to the client?
A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client: max lifting capacity, height (height under hook), tip load and jib length.
- Q: what is the common cause of crane accidents
- Although mechanical failure does occur, most crane accidents are caused due to human error. Here are some examples: 1) Operating a crane during adverse weather conditions, such as wind conditions 2) Overloading a crane/ improper load calculations 3) Inexperienced or untrained personnel 4) Improper rigging of the load 5) Bypassing safety devises 6) Improper selection of the crane for the environment (ground conditions, power lines etc.) based on the type of load 7) Shock-loading a crane 8) Failure to perform maintenance and inspections in accordance to manufacture specifications I hoped this helped Cheers
- Q: What is YOUR take on Louis Crane's idea of meduso-anthropic principle?
- Well, weak- anthropic beats the hell out of strong- anthropic. One cannot, in good conscience, postulate God from the improbability of a good primordial soup kitchen, when beating the odds is the prerequisite for anything evolving sufficiently to be amazed. Life, however, plays hell with probability, because it’s possible for an improbably complex thing to create as many improbably complex things as energy allows. Introduce evolution, crank out a tool user, it gets worse. One dedicated farmer can create a vast and profoundly improbable flourishing of life. Now if we move out into the universe and find a vast and improbable flourishing, we will have cause to suspect the existence of cosmic farmers. This especially because it appears we are evolving towards that state ourselves. Dressing up this concept in pseudo science though, strikes me as a bit pretentious. Which is my take on Louis Crane's idea of meduso-anthropic principle
- Q: Tower cranes sometimes have very long booms, but seem to usually have fixed counter-weights at fixed positions behind the cab. Why doesn't it flip backwards when there is no load, or flip forwards when a load is way at the far outward end of the boom? It seems to be a very large range of moment arms given that the counter-weight has a fixed one.
- I think the counter weights are connected to a pully system that directly interacts with the boom and hook movement. This way it can put more or less pull on the weights according to the amount of weight or position of the weight on the crane.
- Q: What should be included in the disassembly plan of the tower crane?
- - 1 -Contents and requirements of special construction plan for tower crane installation1. General situation of Engineering; 2, installation location and elevation plane3. The type, performance and technical parameters of the tower crane selected4,; foundation and attachment device set(1)The foundation of tower crane and the bearing capacity of its foundation shall comply with the product specificationRequirements for books and design drawings. Before installation, the foundation shall be checked and accepted before installation. There should be drainage facilities around the foundation.(2)Attached tower crane is used, the attachment device and set freeThe end height shall comply with the requirements of the product manual. When adhering to a horizontal distance or attachmentThe design calculation and drawing system should be carried out when the spacing is not satisfied with the requirements of the product specificationDrawing and writing relevant instructions shall be examined and approved by the technical leaders of the enterprise or through the originalManufacturer confirmation. Attachment device and component shall be the original manufacturer or by embedded partsEnterprise with corresponding ability to make. Attachment device design, the main structure of the building to support the checking.5, climbing conditions and adhesion node detail;The foundation, anchor and climbing support structure of an internal climbing tower crane shall be used as the foundationAccording to the product manual to provide the design calculation, and the internal climbing tower crane bearing structure checking.6, the main components of the weight lifting and installation position.7, the installation of auxiliary equipment; the type, performance and arrangement position.8. Rigging and special tools9, set the power supply;10, the construction personnel configuration;
- Q: I was wondering if anyone knows what period this book is set in? I know that it's set in the slums of New York and the story was published in 1893. But what time period does the story actually take place?
- hah ha i'm in your class too :) This project sucks... and I still haven't done it! I have to tonight..
- Q: I just can't figure this out. They need a crane to assemble tall buildings, but how do they assemble the crane? Especially if the building is over 20 stories high. What crane can build a crane higher than itself?
- a mobile crane sets the original lower sections in place, and then the crane is assembled in 6' sections as it climbs itself.
- Q: What tower cranes are used on the 30 storey house?
- The 30 storey building on the height of about 100 meters to 120 meters, plus 2 to 3 layers of basement, the tower crane must set the height of 110 meters to 140 meters, if the single building is less than 60 thousand square meters of building square meters, as the total number of square meters, using a two QTZ63 type tower crane is enough,
- Q: where do they live, and what do they look like
- these guys described them pretty well. I get to see these types of birds every day here in south florida. We do have a lot of cattle egrets they follow behind you when you mow your yard picking up bugs.
- Q: I have a Manfrotto/Bogen 055XB tripod that says it supports up to about 15lbs. The crane I'm looking into getting is the Glidecam Camcrane 200 which says it has a payload of up to 30lbs. depending on the height. What would happen if I were to use this crane with my tripod?
- Please let me know where you will be so I can capture the video of your camera crashing to the ground. Because you overloaded the tripod, there will be no warranty coverage for anything. Yes, they can tell. ++++++++++++ I realized I had not provided an alternative... the crane specs also specify Camcrane 200 mounts on the 3/8 standard bolt found on the majority of medium and heavy duty tripods an
- Q: What is the Tower crane Roadb track laying criteria?????????
- The okorder ) track in the vertical and horizontal direction is not more than 1 / 1000. (we Should use the standard instrument, two tracks, and keep in10m range ,Measuring not less than 3 periods, respectively,taking the average).
Send your message to us
Tower Crane Split in row of weight QTZ125(6015)
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords