• Tower Crane of Jing Kui Model Number QTZ4810 System 1
  • Tower Crane of Jing Kui Model Number QTZ4810 System 2
  • Tower Crane of Jing Kui Model Number QTZ4810 System 3
  • Tower Crane of Jing Kui Model Number QTZ4810 System 4
Tower Crane of Jing Kui Model Number QTZ4810

Tower Crane of Jing Kui Model Number QTZ4810

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
50 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

QTZ4810  Description

Feature: Tower Crane

Condition: New

Rated Loading Capacity: 4

Rated Lifting Moment: 400

Max. Lifting Load: 4

Max. Lifting Height: 121

Span: 48

Place of Origin: Shandong, China (Mainland)

Brand Name: JINKUI

Model Number: QTZ4810

Warranty: one year

After-sales Service Provided: Engineers available to service machinery overseas

Certification: ISO9001:2000; CE;Ukraine & Belarus Certificate 

Colour: Orange/ Yellow 

QTZ4810   Features

1.Thirteen years of experience in supplying new self-erecting tower crane with Huiyou Brand.

2. Export to more than 20 countries with CE/ISO/GOST Certificates.

3. Stationary/Travelling, external/ internal climbing tower crane 

4. Impeller blasting/rust protection paint

5. Advanced painting process

6. Potain masts designed with dismountable panels, making teansport easier and cheaper. 

7. New designed mast, can be used to Internal and external climbing tower crane

8. Famous brand mechanism system, Schneider Electronic control system, jiangte and jiuhe motor

9. Engineers available to service machinery overseas.   

QTZ4810Specification

 Tower Crane of Jing Kui Model Number QTZ4810

QTZ4810  Pictures

 

Tower Crane of Jing Kui Model Number QTZ4810

Tower Crane of Jing Kui Model Number QTZ4810

Tower Crane of Jing Kui Model Number QTZ4810

QTZ4810  FAQ

Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.

 

Q: What is the function of the monitor?

A: Monitor, namely inspection system (like black box), which could store 10000 tower crane operation reports, and it is recommended to be installed in big cranes more than 16t.


Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.


 

 

 

 


Q:Under what circumstances are winches used and under what circumstances tower cranes are used?
First of all, what you say should be a derrick or a Longmen frame. In any case, the derrick or tower crane should first meet the construction requirements, then the economy and safety requirements. To meet the construction requirements, it is much better to choose the derrick, of course, economically and safely. Derrick is a simple nonstandard equipment. It is easy to install, use and disassemble. It has low running cost and less safety risk than tower crane. The derrick is suitable for construction under 30 meters or less, especially for multi storied buildings and single pieces. The volume and quality are not more than 2 tons.
Q:How many meters of cranes should be in accordance with the anemometer?
Tower crane type test items, technical requirements and test methods provides that: Boom root hinge point height of greater than 50m tower crane, should be equipped with anemometer. When the wind speed is greater than the working limit wind speed, the alarm can be issued to stop the operation. The anemometer shall be installed at the top of the tower without the wind.In fact, this is also the requirements of the type test rules for tower cranes and the safety technical specifications for crane overload protection devices.The answer is recommended dogmatism, mainly because the standard setters do not understand the actual situation of the construction, and not the outdoor crane need, need only part of crawler crane and tower crane installation, as the case may be other.Welcome to the emperor student - lifting expert Sina blog, my blog is committed to the dissemination of hoisting safety and professional knowledge.
Q:How often should the crane be inspected regularly?
Tower cranes, elevators, mobile cranes 1 times a year, including rubber tyred container gantry crane every 2 years 1; small light lifting equipment, bridge crane, gantry crane, gantry crane, cable crane, crane mast, railway crane, jib crane, mechanical parking equipment every 2 years 1, the crane annual molten metal and hot metal 1.Rules for periodical inspection of lifting machineryArticle 1 These rules are formulated in accordance with the regulations on the supervision of special equipment safety and the regulations on the supervision of crane safety.Article second of the rules from the regular inspection of heavy machinery, is often used in hoisting machinery maintenance unit (hereinafter referred to as the foundation of the self inspection and maintenance), by the State Administration of Quality Supervision Inspection and Quarantine (hereinafter referred to as the State Quality Inspection Administration) special equipment inspection agency approved (hereinafter referred to as the inspection agency) according to the rules, to incorporate the use of registration in the inspection of crane.Article third these rules apply to lifting machinery within the scope stipulated in the regulations on safety supervision of special equipment. All the hoisting machines included in the catalogue of special equipment shall be inspected regularly."No" included in the catalogue of special equipment installation supervision and inspection and the implementation form of hoisting machinery factory, direct delivery unit, for use in pre registration by the local inspection agencies in accordance with the rules of the test items and their contents, requirements and methods for inspection of the equipment before using test (i.e., referred to as the first examination), qualified rear can be used for registration. For the first inspection of hoisting machinery, see Appendix A.
Q:What should I do with them? who would accept them if I donated them?
My brother-in-law won my niece an orange, Halloween cat from a crane when she was very small. She carried that cat everywhere. However, she recently lost it. I've been googling for a replacement. Is there any chance that you have an item like that in your menagerie? And to answer the original question, Salvation Army and Goodwill are great places, but so are state and federal organizations like the Department of Social Services and local Police Departments or Fire Stations. I work for DSS and many agencies like that give away a stuffed animal to any child involved in a case. Just a thought.
Q:Tower crane (tower crane)
Fixed tower crane, mobile tower crane, flat tower crane, movable arm tower crane
Q:From what I'm understanding in the first stanza, a women lost her lover to the war because he fell off his horse...Is that right?
Yes, Stephen Crane talks about lost love and sacrifices in his poem. The basic casualty of war. A lover, a father and son are lost in his story and those that are left behind he tries to console. The poem is noted for the ironic use of war is kind. We all know that War is really not kind. The poem’s speaker, simultaneously sympathetic with the victims of war and cynical about the purposes of war, implicitly criticizes the image of the romantic hero, showing in graphic scenes the realities of battlefield death and the emotional torment it causes for those left behind.
Q:A lot of condos and hotels are being build in hawaii, and each time i drive pass them i wonder how they are assembled.Since each individual piece looks heavy/sturdy and is 45 stories+ high, how do construction workers put them together. Do they assemble it by hand? Or are smaller cranes needed to do the job? Or possibly a different way i didn't mention?
I saw one erected once - it was fascinating. They started out with a big mobile crane - then they added piece by piece until they finished it.
Q:well I am making 1000 paper cranes... I am on 18... but how do you string them all together anyone know?
How To String Paper Cranes
Q:If I have one week, is that enough time?
It all depends on how fast you can make one paper crane and how many hours you have available each day. If you made 15 an hour for 10 hours each day (150 cranes a day) for 7 days you would have 1050 cranes. You will probably find that you begin to go faster, the more cranes you make. However, after 2 or 3 days you will get sore hands and this will slow you down again. It's easier when you work as a team.
Q:I need step by step information on how to make a paper crane.
An okorder /d

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords