Tower Crane New Building Machine in China
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Structure of Tower Crane TC7034 Description
Feature: Tower Crane Condition: New Application: Construction Max.Lifting Load: 12T Max Tip Load:3.4T Independent Height:50M
Max Lifting Height: 200M Span: 70m Certification: CE,ISO
Place of Origin: China(Mainland) Model Number: TC7034
Packaging & Delivery of Tower Crane TC7034
Packaging Detail: Nude package Delivery Detail: 25-30days
Main Feature of Tower Crane TC7034
Our tower crane is self-erecting and wall-attached tower crane, in addition to it's advanced parameters, reliable performance, well-looking appearance, and excellent quality.
It has characteristica such as long boom, largeworking coverage, hydraulic rising, and tandem mounted tower body.
It's design idea shows advantages including simple structure and good applicability, convenient maintainability, and lower price at the same time to emphasize meeting the requirement from construction units at different levels.
It's lifting height is obviously increased thanks to its self-erecting and wall attached function.
It is applicable for construction of different industrial, commercial, office, and civil building lower than 220m, and becomes an ideal service-building machine at home.
Tower Crane TC7034 Specifiction
Images of Tower Crane
FAQ of Tower Crane
Q: What serice you could provide?
A: Providing timely delivery, standby engineers are ready to slove any of your problem
Providing all-embraced warranty of products quality, worksite installation guidance
Providing ample spare parts and training of operation and maintenance
Engineers have more than 20 years' experience in tower crane, ready to solve any of your problems.
Q: What about our tower crane's warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
- Q: Jin Title required 20 large equipment testing reports. The personnel system is really rubbish, so we don't know what to do professionally.
- General purpose gantry cranes: MG, 440t, MG, 360t, MG, 450t, Me, 360t, ME, 900tGeneral purpose bridge crane: QD, 350t, QD, 400t, QD, 450t, QD, 390t, QD, 330t, QE, 350t, QE, 330tThe above tonnage is now recognized as a large lifting machinery.Hoisting machinery refers to the lifting of heavy objects with hooks or other lifting devices, and mechanical operations such as lifting and moving in space. There are many classifications of cranes, such as cranes, cranes, cranes, cars and so on. They are commonly referred to as one or more kinds of cranes.
- Q: How often should the crane be inspected regularly?
- Tower cranes, elevators, mobile cranes 1 times a year, including rubber tyred container gantry crane every 2 years 1; small light lifting equipment, bridge crane, gantry crane, gantry crane, cable crane, crane mast, railway crane, jib crane, mechanical parking equipment every 2 years 1, the crane annual molten metal and hot metal 1.Rules for periodical inspection of lifting machineryArticle 1 These rules are formulated in accordance with the regulations on the supervision of special equipment safety and the regulations on the supervision of crane safety.Article second of the rules from the regular inspection of heavy machinery, is often used in hoisting machinery maintenance unit (hereinafter referred to as the foundation of the self inspection and maintenance), by the State Administration of Quality Supervision Inspection and Quarantine (hereinafter referred to as the State Quality Inspection Administration) special equipment inspection agency approved (hereinafter referred to as the inspection agency) according to the rules, to incorporate the use of registration in the inspection of crane.Article third these rules apply to lifting machinery within the scope stipulated in the regulations on safety supervision of special equipment. All the hoisting machines included in the catalogue of special equipment shall be inspected regularly."No" included in the catalogue of special equipment installation supervision and inspection and the implementation form of hoisting machinery factory, direct delivery unit, for use in pre registration by the local inspection agencies in accordance with the rules of the test items and their contents, requirements and methods for inspection of the equipment before using test (i.e., referred to as the first examination), qualified rear can be used for registration. For the first inspection of hoisting machinery, see Appendix A.
- Q: the cable of Crane I creates and angle of 30 degree angle from the horizontal and the cable of Crane II creates an angle of 45 degrees from the horizontal.-draw a figure that gives a visual representation of the problem-write a vector to represent the tension on the cable of Crane I-write a vector to represent the tension on the cable of Crane II-write a vector to represent the 20000 lb cargo container being lifted -calculate the tension on both cables. Justify your answer.....please help me!!! thank you!!!!:)
- So I can't tell whether the cargo container is one ton (2000 lbs.) or ten tons (20,000 lbs.). For doing the problem, I'm using 2000 lbs., so you might have to multiply the answers by 10. Also, I'll use A and B for the cranes instead of I and II. (Vertical): A sin 30° + B sin 45° = 2000 == A + √2 B = 4000 (Horizontal): -A cos 30° + B cos 45° = 0 == -√3 A + √2 B = 0 Solve those equations simultaneously to get A = 4000/(1+√3) = 1464 lbs. and B = √(3/2) A = 1793 lbs. (Answers) The vectors are: A = 1464 (-i cos 30° + j sin 30° = -1268i + 732j (Answer) B = 1793 (i cos 45°i + j sin 45°) = 1268i + 1268j (Answer)
- Q: My fiance and I would like to make 1,000 paper cranes for our wedding next year in May. We are looking for a good type of paper to use for this. We are not too particular on the color of the cranes, though we like blue or gold. Does anyone have any feedback on the sort of paper I can get for this project? I know there is origami paper I can buy, but I was wondering if that is the only option I have to choose from. Thanks in advance! :)
- I see origami paper quite often in bookstores, art supply stores, and at the local Japanese grocery stores (I'm in the Portland area).... it's also commonly available online, sometimes in packs of solid colors. Try folding some cranes in different sizes... very small ones can be difficult to fold (I can't manage less than 2 square)
- Q: If so, would you mind finding me a site that will teach me how to either with a good video or an easy-to-follow explanation because i tried many sites and i just cannot understand clearly enough. I get so far and then i can't tell what is happening in a step, and i can't do it.If you wouldn't mind to find me a site that you know will help, since you can make them, it would be greatly appreciated.Thanks.
- Go to Howcast and type in origami.It taught me how to fold like a pro.
- Q: Im looking for more information on Overhead Cranes!?
- Try okorder /
- Q: The story I'm writing that has Frank Crane in it is here. Is there a better name I could be using for the protagonist?
- Names are not important. If it's bothering you, chose another name (find a list online of current most popular boys name so you chose something modern, maybe). But if you start relying on a name to put across something of the charactor you are doing something very wrong.
- Q: Trying to find an estimated weight for a mobiles crane with a 5 tonne capacity ?
- If the crane HAS a 5-ton capacity, then to be able to estimate the weight you would need to know the length of its lifting arm at maximum extension w.r.t the C.G. of the body of the crane. So suppose we have an arm length of (say) 6 mtrs, then the max turning moment at the fulcrum (from front wheels of crane ? ) due to the Load alone = 5 x 6 = 30 You need to add the moment for the arm itself. Lets say the arm is around 1/2 ton. And its c.g. is approx 1/3 the distance from the fulcrum. Then this adds another = 1/2 * 1/3 *6 = 1 So total moment is 30 + 1 = 31 The body of the crane must be MORE than this. Suppose the C.G. of the crane is 2 meters behind the same fulcrum. Then weight of the body must be 31/ 2 = 15.5 tons. Lets say the weight is 16 tons. Then the TOTAL mobile cranes weight would be 16 (body) + 1/2 (arm) ~ 16.5 tons It all depends on the dimensions of the crane, and where the c.g. is located. If the crane has ballast added right at the back, then it's overall weight can be made less since it's c.g. would get shifted further away from the fulcrum
- Q: How many tons are tower cranes QTZ125?
- Nominal lifting torque KN ? m 1250Rated lifting torque KN ? m 1300Maximum lifting weight T 8Operating range M 3~60Maximum rated lifting weight t 1.5Maximum lifting speed m/min 80The lowest steady decline speed of m/min is less than or equal to 7Lifting performance two rate lifting speed m/min 80405.6Lifting weight t 248Four magnification lifting speed m/min 40202.8Lifting weight t 488Variable speed m/min 52/26/8Slew speed r/min 0.63Lifting height independent type M 50Attached m 170Design weight t 42.7 (stand height)Counterweight t 21.2The working environment temperature is Co -20 to +40Maximum working wind speed is m/s 20The maximum wind speed at ceiling is m/s 13
- Q: Firstly, I realize that the 1000 paper crane thing is based on faith and not science. I'm not stupid. Secondly, Do the 1000 cranes have to be in the same place? If I send one of my cranes to a friend across the country, would that no longer count as part of my 1000 cranes?If a crane gets destroyed, must I start over or replace that crane?If anyone has any knowledge or link pertaining to the 1000 paper crane myth, please post it. Thank you.
- The myth seems to surround the FOLDING on the 1,000 cranes - it is the sacrifice on the part of the person doing the folding that is the magic not the cranes themselves. See the Wiki......
Send your message to us
Tower Crane New Building Machine in China
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords