• Tower Crane CMAX TC5613 Type For Dubai Market System 1
  • Tower Crane CMAX TC5613 Type For Dubai Market System 2
  • Tower Crane CMAX TC5613 Type For Dubai Market System 3
  • Tower Crane CMAX TC5613 Type For Dubai Market System 4
  • Tower Crane CMAX TC5613 Type For Dubai Market System 5
Tower Crane CMAX TC5613 Type For Dubai Market

Tower Crane CMAX TC5613 Type For Dubai Market

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 Quick Details

Feature: Tower Crane                          Condition: New                                           Max.Lifting Load: 8T

Span: 56m                                             Place of Origin: Human China(Mainland) 

Brand Name: CMAX                              Model Number: TC5613         

 

Packaging & Delivery

Packaging Detail: Nude package          Delivery Detail: 25-30days

 

Specifications

● Max. working range 56m, tip lifting weight 1.3T and Max.lifting weight 8T.

● Provide stepless speed regulation. Outstanding in working efficiency, operating stability and reliability,

● Reduce future maintenance cost.

 

8T tower crane, support installation inside or outside building.
The self-raising tower crane, which is a new-style elevating machinery specially designed for the construction 

of tall buildings and equipment installation, is a type of self-raising multi-purpose tower crane equipped with level arm support, and it allows trolley derricking and upper slewing.

 

To Lead The Revoluation of International Trade

Q:Her fan mail address isnt on fanmail
Try: Kara Crane c/o Orange County High School of the Arts 1010 North Main Street Santa Ana, CA 92701
Q:I know how to make cranes and I'm pretty fast at doing so but in pictures I see of crane leis the cranes look like they're folded differently so that they can be stacked on top of each other.. Can anyone teach me how to fold like that so that I can make a paper crane lei?
But I do different from step 11 on Step 11: Normally they fold along the red line. I dont. On step 10 you see the cross line in the center +. I then fold the right pointy toward the center. Do the same for all. Step 12: I the filp the right top layer to the left, same with the back side. Step 13: fold the bottom point to the top(one layer only) filp to back side, do the same. Step 14: flip right layer to the left again, same with the back side. Step 15: Pull and done.
Q:I've only read Hunger Games and watched the movie and noticed a large presence of Seneca Crane in the movie.However, I don't recall him being mentioned in the Hunger Games? Is he even mentioned in the Hunger Games? If so, please provide pages.I know he is definitely mentioned in Catching Fire but I haven't read that yet.
Nope. He is just called The Gamemaker in The Hunger Games. I guess they wanted to elaborate on him more so that you would know Katniss's hatred for him in the Catching Fire movie.
Q:What is the admissible weight of a crane?
Depends on how it is transported - you have to give more information on the kind of crane and where it will be used.
Q:why are siberian cranes endangered?
Would you spend a winter in Siberia if you could fly south?
Q:Two cranes can unload a ship together in 8 hours. The faster crane takes 12 hours less than the slower crane, if each were to unload the same ship alone. How long does it take for each crane to unload this ship?
Fast Crane = A unload x /hour Slow Crane = B unload y /hour A + B = 8 hours x /hour + y /hour = 8 hours (average rate) average rate = (x + y) / 2 so 8 hours = (x + y) / 2 and x + y = 16 since the slow crane is 12 hours longer, x must be 2 hours, since they will both take 2 hours and the slower crane will take 2 hours plus 12 hours equalling 14 hours. The rate of crane A is 2 hours to unload and the rate of crane B is 14 hours to unload. The average rate for both to unload is 8 hours. There were certain assumptions made to solve this puzzle and it is not clear how they actually operate on the ship while unloading. ~~ The most practical way to unload the ship is *NOT* to use the slower crane since it takes longer for them to work combined, than for the faster crane to work alone !! A tricky but fun question !! :-b
Q:in design of steel structures as per asce2005 or ibc2006 ,what load combinations are to be considered when crane loads and seismic loads are present?
Asd Load Combinations
Q:i'm doing it for fun but i was wondering because my aunt had a baby that like 1 and the baby has cancer and i'm gonna try this to help her please don't be mean like the only thing you will get is sore hands and stuff is it true or is it a myth only answer if you did thid and i want to know what happened to you but anyway ill pray to god that everything will be ok with the baby
I wish that were so but God only acts according to HIS will. Not your will but thy will be done, it doesn't hurt to ask and hope that he will grant you with what you desire but don't be disappointed when it doesn't happen. And remember, just because it does not happen doesn't mean that he didn't listen. We do not know what God has in store for us until it happens, but that's what we call faith. Trust in HIM and you shall receive, even though it might not be what you want God is righteous and you may expect a better outcome than what you have expected.
Q:The mobile crane has a weight of 116kip and center of gravity at G1; the boom has a weight of 29kip and center of gravity at G2. Determine the smallest angle of tilt θ of the boom, without causing the crane to overturn if the suspended load is W = 38kip . Neglect the thickness of the tracks at A and B. Determine the smallest angle of tilt θ of the boom, without causing the crane to overturn.
The key here is to simplify this as much as possible The equation is really: mass 1 x length 1 + mass 2 x length 2 = mass 3 x length 3 G1 * 6 ft = (G2 * X ft) + H3 * X ft) G1 = 116 kip G2 = 29 kip H3 = 38 kip Now it is an equilibrium of torque about the point where the boom pivots: 116 kip * 6 ft = 29 kip * Xft + 38 kip * Xft solve for X feet: X feet = 10.388 ft So the crane is in equilibrium when the load is length1 + length 2 times the mass = mass of motor * length 3 (10.388 ft * 29 kip) + (10.388 ft * 38 kip) = 116 kip * 6 ft The boom forms a triangle with the hypotenuse equals 12ft + 15 ft = 27 ft. The bottom of the triangle is 10.388 ft + 10.388 ft = 20.776ft So we have two sides of the triangle and now just need to find the angle where the triangle forms with those two sides: cosine of angle = adjacent side / hypotenuse cosine of angle = 20.766 / 27 = 0.7691 and the arc cosine of that = 39.7 degrees So rounding it off, angle of crane = 40 degree
Q:How to crane fly out of your room?
The crane fly might look a little scary, but they really are harmless. They do not bite people. But you don' t want one in your bedroom. Just open the window and get a towel and chase him out. You may have to get a ladder because he may want to go to the ceiling.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords