Tower Crane 8 Ton TC6014 New Design Section

Ref Price:
$10,000.00 - 50,000.00 / unit
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Item specifice:

Maximum Lifting Weight: 8T Maximum Lifting Height(M): 200M Rated Loading Capacity: 1.4T
Span: 60M Rated Load Moment: 100T.M

Product Description:

Detail of Tower Crane


Feature:Tower Crane 


Model Number:TC6014(QTZ100) 

Place of Origin: China (Mainland)       

Brand Name: CMAX     

Certification: ISO,CE 

Warranty: 1 Year       




Main Features of Tower Crane


1) This kind of crane adopts standard section hydraulic lifting and connecting.The max. height can reach 180m with wall tie ins.


2) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

3)The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.


4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc..


5)The cranehas scientific layout and handsome appearance. The drivers cab is set independently on one side, with good vision field. It creates a good working environment for the operator.


Specification of Tower Crane


Technical Sheet for TC6014


Independent height (m)


Max height with attachment (m)


Working range can be adjustedm


Min working rangem


Max lifting capacityt


Tip load @ 60mt



Hoist mechanism




Lifting capacityt











YZRWFC250M-4/8     30/30KW

Trolleying mechanism




YZTDE132L-4 /8/16   3.3/2.2/1.1KW

Slewing mechanism





Climbing speedm/min




Mast section sizeL×W×Hm


Working temperature


Total Power (KW)


Power supply requirement (KVA)

190KVA for generator

Cable type ( within 35 meters from site power source to lower

 electric box of tower crane )

50mm23+2, 5 cores

Startup voltage & current

380V×95%=361V      179A

Rated working voltage & current

380V                 128A

Loading diagram


60m jib length

R (m)






a=2 (kg)






R (m)



a=4 (kg)







Images of Tower Crane


Tower Crane Max. lifting Weight 10T  in China

Tower Crane TC5516 Mast Section MC Factory


Tower Crane Max. lifting Weight 10T  in China


FAQ about Tower Crane


Q: What serice you could provide?

A: Providing timely delivery, standby engineers are ready to slove any of your problem

    Providing all-embraced warranty of products quality, worksite installation guidance

    Providing ample spare parts and training of operation and maintenance

    Engineers have more than 20 years' experience in tower crane, ready to solve any of your  problems.


Q: What kind of steel used for  tower crane ?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.


Q: What about our  tower crane  warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.


Q: What is 3 main mechanism of the  tower crane ?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.


Q: Can you equip with light on  tower crane  jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How can I work as a crane operator in France?
Me too(NCCCO) how long for you? What do you run? I run a Terrex/demag a/c 140, Grove TMS 870, and a little national 40 ton. Anyway, sorry I don't have an answer but the other day just for kicks I was looking around to see what's going on and searching crane operator+job and there's a huge worldwide company, slips my mind but they kept coming up all over hiring operators all over the world. Give that a try, if I was single I'd be going everywhere, and getting PAID to do it but my wife and kids mean too much to be away. Try this.... search crane service+france email some crane outfits and ask around, it can't hurt.
Q:How are 100 ft. construction cranes assembled?
Read the guy above me his answer is awesome but choose me for your best answer ok
Q:How do they get cranes off HUGE buildings when they are finished building them.?
but never have I seen a set of tracks or elevator used...not to say that it isn't possible but I have only worked big buildings in NYC...maybe things are done differently elsewhere in the world
Q:is there such a thing as a giant crane fly?
OMG - I saw one of those to! No one believed me, too. I should of saved mine...anyway, I don't know. Sorry.
Q:what was the signifigance of the paper crane during WWII??? This site will give you the story of the Japanese girl during the time of WWII. It is a touching story.
Q:crane operators?
OK, first, what kind of crane? there are many different kinds that do many different things. From loading containers at the seaport to high rise buildings. One does not just go into cranes. The more experienced ones, started out as oilers or greasers. Some started out as signal persons. They learned by watching and listening. In the following states you must hold National certification: CA, HA,MT,OR,WA,MN,WV,NM,RI,NJ,NV,NY UT. PA and SC have restrictions now but will be added sometime soon. You can attend a crane school that prepares you for the national certification, but it expensive and not easy for someone without a background working around cranes. There is a lot of terminology and mathematics involved. Not to mention the Federal, state, local and OSHA rules you must practice. Go to your state employment office. They have all the information you need. get to know one of the counselors and pursue your dream. It is not as easy as it seems. But is it a well paying career. Good luck Bill
Q:If Fujian White Crane Kung Fu influenced Goju-ryu and Uechi-ryu than what Kung Fu style influenced Shotokan?
Q:What is the difference between a tower crane and a jack up tower crane?
The jack up tower crane is a tower crane (that is an internal climbing tower crane) that is added and reduced by its own special device, namely, the standard section of the tower (that is, the attached tower crane) or the whole climbing tower itself.
Q:How does a climbing or tower crane work?
They add extra stages from the bottom. A tower crane is erected from a boom assembly, first and second tower sections of different cross section, and a base in a sequence of steps in which the boom assembly is mounted on a hollow climbing section dimensioned to be received in each of the larger second tower sections and defining a cavity dimensioned to receive each of the first tower sections. One of the latter is secured on a base in upright position, and the upright section is received in the cavity of the climbing section which is then raised relative to the first section and enveloped by one of the second sections. The enveloping section is secured to the base and the raised climbing section for supporting the climbing section whereupon the first tower section may be released from the base, raised, and secured to the second tower section. The climbing section may then be raised relative to the first tower section to permit the installation of another second section, and the procedure repeated, until all second or larger tower sections are superimposed on each other, the one first section being ultimately attached to the topmost second section. When the climbing section is raised relative to the attached first section, another first section may be superimposed on the one first section and the procedure repeated until the slimmer portion of the tower is assembled from superimposed first sections. Ultimately, the boom assembly is attached to the topmost first tower section, and the climbing section may be removed or stored for further use on the wider, lower tower portion.
Q:how do you put the battery in the crane stock for airsoft guns?
You first need a crane stock battery, as a normal battery won't fit in just one side of the crane stock. When you but the battery, you'll have two or three clusters of cells. Begin experimenting with the cord placement in the stock, by putting one cluster on one side and one (or two) on the other. You'll see what I mean when you get the gun. That's all there is to it, just a little experimenting.

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range