Tower Crane 10 Ton TC6024 High Efficiency
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specification
Detail of Tower Crane
Feature:Tower Crane
Condition:New
Model Number:TC6024(QTZ160)
Place of Origin: China (Mainland)
Brand Name: CMAX
Certification: ISO,CE
Warranty: 1 Year
Application:Building,Construction,Industrial
Main Features of Tower Crane
1) This kind of crane adopts standard section hydraulic lifting and connecting.The max. height can reach 180m with wall tie ins.
2) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
3)The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.
4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc..
5)The cranehas scientific layout and handsome appearance. The drivers cab is set independently on one side, with good vision field. It creates a good working environment for the operator.
Specification of Tower Crane
Technical Sheet for TC6024
Free standing height (m) | 50.5 | |||||||
Max height with attachment (m) | 200 | |||||||
Working range can be adjusted(m) | 48、54、60 | |||||||
Min working range(m) | 2.5 | |||||||
Max lifting capacity(t) | 10 | |||||||
Tip load @ 60m(t) | 2.4 | |||||||
Hoist mechanism (VFD+PLC) | Falls | 2 | 4 | |||||
Lifting capacity(t) | 0-2.5 | 0-5 | 0-5 | 0-10 | ||||
Speed(m/min) | 0-80 | 0-40 | 0-40 | 0-20 | ||||
Motor | YZPBF250M1-6-45KW | |||||||
Trolleying mechanism (VFD+PLC) | Speed(m/min) | 0-56 | ||||||
Motor | YZPBE132S-4-5.5KW | |||||||
Slewing mechanism (VFD+PLC) | Speed(r/min) | 0-0.6 | ||||||
Motor | YTW112M-4-5.5KW×2 | |||||||
Climbing speed(m/min) | 0.5 | |||||||
Counterweight (t) | 48m jib | 54m jib | 60m jib | |||||
15.45 | 17.85 | 18.9 | ||||||
Mast section size(L×W×H)m | 2×2×3 | |||||||
Working temperature | -40-+60℃ | |||||||
Total power (KW) | 63 | |||||||
Power supply requirement (KVA) | 230KVA for generator | |||||||
Cable type ( within 35 meters from site power source to lower electric box of tower crane ) | 50mm2(3+2, 5 cores) | |||||||
Startup voltage & current | 380V×95%=361V 219A | |||||||
Rated working voltage & current | 380V 121A | |||||||
Loading diagram:
60m jib length:
R | 2.5-15.85 | 20 | 32 | 36 | 40 | 44 | 50 | 56 | 60 |
a=2 (kg) | 5000 (2.5-31.25) | 4874 | 4291 | 3821 | 3436 | 2971 | 2604 | 2400 | |
a=4 (kg) | 10000 | 7897 | 4804 | 4221 | 3751 | 3366 | 2901 | 2534 | 2330 |
54m jib length:
R | 2.5-16.25 | 20 | 30 | 34 | 36 | 40 | 44 | 48 | 50 | 54 |
a=2 (kg) | 5000 (2.5-32m) | 4687 | 4405 | 3925 | 3530 | 3200 | 3054 | 2795 | ||
a=4 (kg) | 10000 | 8099 | 5289 | 4617 | 4335 | 3855 | 3460 | 3130 | 2984 | 2725 |
48m jib length:
R | 2.5-35 | 39 | 45 | 48 | |
a=2 (kg) | 5000 | 4490 | 3790 | 3500 | |
2.5-19 | 30 | ||||
a=4 (kg) | 10000 | 7890 | 4385 | 3685 | 3395 |
Images of Tower Crane
FAQ about Tower Crane
Q: What serice you could provide?
A: Providing timely delivery, standby engineers are ready to slove any of your problem
Providing all-embraced warranty of products quality, worksite installation guidance
Providing ample spare parts and training of operation and maintenance
Engineers have more than 20 years' experience in tower crane, ready to solve any of your problems.
Q: What kind of steel used for tower crane ?
A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.
Q: What about our tower crane warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane ?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
- Q: I'm supposed to be critiquing an article for a class of mine.. and I don't feel like I understand the concept enough to critique his use of it... (It's an article about The Red Badge of Courage... the author talks about how the observing narrator Stephen Crane creates in the novel uses patterned reality without ambiguity... he's describing one of the scenes in which the dead soliders are somewhat personified.. describing them in terms of the living...... erm anyone take a class on realism? your help is greatly appreciated
- The okorder
- Q: I have a few questions...do they have a shuttle and if so where does it go? What is near the resort? Such as stores etc.
- Great propoerty, amazing views, cool breezes, near airport. Fantastic restaurants. I'd recommend hiring a car.
- Q: I need to do a report on how cranes topple, moment (physics) and there correlation (relasionship).I am an idiot and have forgotten what moment is. so please explian that, how cranes topple and why they dont topple, and the correltion between the two!thank you
- First of all, let's think of a crane like a giant see-saw, where the plank itself doesn't have any weight. Now cranes have big weights on one side of the pivot, which they can move along (I think, I may be wrong). These cause what is called a 'turning moment'. The further out from the 'pivot' they are, the greater the moment. The other consideration with a crane is it's load. Generally, this is carried a lot further out from the pivot point, on the opposite side from the weights. Now consider this. If you have a small child sitting on the end of a see-saw, you will be able to balance them with a larger person sat closer to the pivot. This is the principle on which cranes work. The moment is the force times the distance from the pivot, and it must be balanced turning each way for the see-saw/crane not to topple. This is somewhat of a simplification, but hope it helps.
- Q: What do you do after you made 1000 paper cranes. I know you string them up, but storing them is hard. Do you ceremoniously burn them or what? When can they be gone? This is the missing link in the story I want to know. I have 846 and I want to know what to do after I'm done.
- The okorder /
- Q: QTZ63 (Q5610) tower crane power, how many power parts, name, model specification, product number, date of appearance
- All the details of the equipment are availableAs for power, it depends on the specific configuration of the frequency conversion and non frequency conversion will not be the same
- Q: I know that you have to unfold the origami paper crane, but how do you find the surface area of it???????????????????????????/ please help...........
- Do you remember the formula for determining area? For a flat object (like your paper) the formula is Length X Width = Area. or LW=A So unfold your paper, and measure the length and the width, and simply multiply the two numbers. The resulting number will be your area. Of course, that is the area of the unfolded paper. Your crane in it's folded form will have a much different, and harder to find, surface area value.
- Q: Im looking for more information on Overhead Cranes!?
- You would get lot of information on Over Head Cranes as permanently installed material handling equipment for various industries, if you google search under EOT CRANES. As I know, in steel industries their capacities can go up to 400 Tons. EOT cranes are electrically powered and electrically controlled systems. These cranes are categorized for maintenance application and production application. At times their design and construction are quite complicated specially those of production application such as Steel melting shop of steel plant.
- Q: She was editing some of his writings. She was appalled(prim proper Nebraska gal) by his lack of punctuation. He said he didn't have the time for it. He was right. Shortly after he died of TB. Do you ever feel that time is your enemy; that you have only so many years to make a difference?
- Due to my present situation, I have thought about this many hours. Many days. Many months. Time, or the lack of it, is generaly considered the enemy. But there are situations that the less of it can be a blessing. None of us can ever know which we will wish for. Until that time comes.
- Q: Whats does the japanese crane symbolize?
- The Japanese crane symbolizes serenity and hope. It is a legend in Japan that if you fold 1000 paper cranes, any wish will come true. There is a story about a girl named Sadako who died from radiation in Hiroshima after WWII who tried to fold 1000 paper cranes to be brought back to health. She nearly folded 1000, and died before then. People come to Hiroshima still today with 1000 folded paper cranes to honor Sadako.
- Q: Is a crane a type of pulley?
- No. A crane is a machine to lift heavy things. It usually uses a pulley. A pulley is part of the crane.
Send your message to us
Tower Crane 10 Ton TC6024 High Efficiency
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords