• Topkit Tower Crane TC7040 Max Load -16t-18t System 1
  • Topkit Tower Crane TC7040 Max Load -16t-18t System 2
  • Topkit Tower Crane TC7040 Max Load -16t-18t System 3
  • Topkit Tower Crane TC7040 Max Load -16t-18t System 4
  • Topkit Tower Crane TC7040 Max Load -16t-18t System 5
  • Topkit Tower Crane TC7040 Max Load -16t-18t System 6
Topkit Tower Crane TC7040 Max Load -16t-18t

Topkit Tower Crane TC7040 Max Load -16t-18t

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
10000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

  TC7021 12T construction used tower crane for sale

 

Product Description

 

Descriptions of our tower crane:

1, TC7021 have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.5 to 70m, TC7021 tower cranes are famous for their large operating ranges, varied working methods and wide uses.  

2,This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.

3, It is original in design, reliable in operation and satisfactory in shape.

4,Equipped with all necessary safety devices, these cranes show a good speed-control capacity,, satisfactory operating stability and high work efficiency.

5,They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys. Best after sales service will be offered which will get rid of all your worries in the purchase of our products

 

Advantage of our tower crane:

1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, suitable for the group of tower cross homework.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

 

Independent height (m)

50

Max height with attachment (m)

200

Working range can be adjusted(m) 

40/45/50/55/60/65/70

Min working range(m) 

2.5

Max lifting capacity(t)

12

Tip load @ 48m(t)

2.1

Hoist mechanism

Falls

2

4

Lifting capacity(t)

0-3

-

0-6

0-6

-

0-12

Speed(m/min)

0-80

-

0-40

0-40

-

0-20

Motor

YZPBF250-4-55W   

Trolleying mechanism

Speed(m/min)

0-56

Motor

YZPBE132M-4-7.5KW  

Slewing mechanism

Speed(r/min)

0-0.6

Motor

YLEW112M-6-120.N.M X2

Climbing speed(m/min)

0.5

Counterweight(t)

23.6

Mast section size(L×W×H)m

2.0×2.0×3.0m

Working temperature

-40-+60°C

Total power (KW)

95

Power supply requirement (KVA)

190KVA for generator

Cable type ( within 30 meters from site power source to lower

 electric box of tower crane )

50mm2(3+2, 5 cores)

Startup voltage & current

380V×95%=361V       219A

Rated working voltage & current

380V                  146A

 

Topkit Tower Crane TC7040 Max Load -16t-18t

Topkit Tower Crane TC7040 Max Load -16t-18t

Topkit Tower Crane TC7040 Max Load -16t-18t

Topkit Tower Crane TC7040 Max Load -16t-18t

Topkit Tower Crane TC7040 Max Load -16t-18t

  

About CNBM:

1, CNBM is the biggest state-owned company which has had been awarded Qualified construction machinery manufactures and most of the big project are using our products.

2, CNBM possess key technical research department and could design & produce special machinery for international clients.

3, We have had passed ISO9001:2008,CE and etc.

4. The successful long-time construction machinery operation in the world testifies that the CMAX products' performance is stable.

5. More than 10 overseas branch office provide immediate commercial convenience and after service.

6. We also has building hoist, suspended platform, formwork, etc. We also signed the strategic partnership with Tadano (China), XCMG, Zoomlion, Sany and other prestigious crane manufacturer, getting the competitive cost price from them, and using our overseas marketing channel to promote their brands. We can provider a series of equipment for your building company customer and supply a basket scheme for the final users.

7. We have built a cover 50,000 square meter logistic park in, Dubai UAE, will be a great guarantee of our business in middle east and nearby area.

 

 

FAQ

 1. why chose us?

China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various

kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.

 

2.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

3. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

4.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.   

Q:I was told that this was taking place, so i would like to fax the info to the proper local
Is it a seeing eye dog?
Q:Which style of Kung Fu has an animal system besides Shaolin? Which one has the Tiger, Monkey, Mantis, Snake, and Crane animals (not Shaolin because Shaolin has Dragon, Tiger, Leopard, Snake, and Crane.)
Mantis is not a part of a style, it is a style in its own right. There are also more than one type or style of Mantis. There is Southern Mantis as well as others. There are estimated to be at least 300 to 400, and possibly more style of Kung-Fu. Man have more than one version of branch. Do not get caught up in the idea that Shaolin contains this or that as the subject is controversial at best. You mentioned Shaolin as being Dragon Leopard, Tiger, Snake and Crane. But truth is that everyone did not learn all of those styles. Many students were taught only one of them. The problem here is that people tend to assume that things are always one way, when in fact they often break all rules of assumption. Monkey is another concept or style that is often misunderstood. There is and is not such a thing as a monkey style. It is not easy to clearly explain. The few styles that are called Monkey styles are rare. There is also what ar known as drunken styles. These are not always separate styles but sometimes are taught as a version or level of other styles. Drunken Monkey is often perceived to be a set style or referring to only one specific style. It is not so. drunken monkey can refer to more than one variation of this and may also be seen as something coming form more than one unrelated style. As I have attempted to do, it is a difficult and confusing subject that is often not clear or correct as to what has been published about it. ....
Q:But theres always someone who gets a prize everytime. Its so unfair!lol
I suck at them lol. I actually like Spongebob (yea thats right), and im not afraid to admit it. Down here in the deep blue sea! It aint 80s I know but its pretty good nonetheless... and no im horrible at those skill cranes so I feel for Squidward in the episode...
Q:I have skills in my craft, I need finatial help for a n.c.c.c.o. certifacation.
lol, yeah, how about just flip my burgers.
Q:Recently a pair of Demoiselle Crane had a chick, it was al healthy right from the very beginning, its parents used to feed him/her a regular diet which usually consisted of insects and worms, it is almost a 30 days old however since yesterday he is not standing or walking on its own legs but just sitting on the knees
Your baby crane might have stepped on something, But this is nothing like malnutrition, From what ive learned the crane may have a joint dysfunction in the knee but this very common in cranes, I really think you should take an X-ray of the cranes legs because,(and the baby cranes feet will expand over time) This could get worse. This is more than likely a leg dysfunction. Hope this helps.
Q:I read the book and thought of a theory... I think that the headless horseman is just and alter ego Brom Bones alter ego and he wanted to kill Brom Bones for his beloved Katrina Van Tassel... I want to hear your opinions and theories possibly involving what you think Katrina said to Ichabod during the party. That would be nice thank you.
What Happened To Ichabod Crane
Q:I know that the whooping crane population recovered through captive breeding but how many are left currently (right now).
There were 535 total in 2009--the population increased slightly last year but I have not seen a total for the population of 2010. Deaths can occur at any time so the number changes constantly. The Journey North site counts 281 adults in the wild western population and 106 birds in the reintroduced eastern flock. They did not give a number for the birds in captivity so I cannot give you a total. You can follow the reintroduced whooping crane population and their migration each spring and fall on the Journey North (in fall called Journey South site). They also track song birds and hummingbirds and monach butterflies.
Q:can anyone help me in telling me how to construct an electromagnetic crane or help me find a website which helps with the steps in constructing one. thank you
Take a metallic bolt, and wind many turns of insulated copper wire around it, and connect one end of the wire to a battery, the other end to the other terminal of the battery through a switch. Now, whenever you press the switch, the bolt gets magnetised, and thus works as a crane (u can use it to lift small pins etc.) When you want to drop the pin, release the switch, the bolt gets demagnetised, and voila!
Q:Two cranes can unload a ship together in 8 hours. The faster crane takes 12 hours less than the slower crane, if each were to unload the same ship alone. How long does it take for each crane to unload this ship?
I'm surprised by how difficult and convoluted the other answers are. They're also wrong. If two cranes are working together and one crane can, in fact, do the job in two hours, then it cannot possibly take longer than two hours with the help of another crane. That makes no sense just by simple reasoning. So the answer of 2 and 14 hours is not correct. Not even close, really. Here's the simple, neat, and correct approach using basic algebra with no assumptions necessary or made: If crane 1 can unload at a rate1/x per hour, then crane 2 can unload at 1/(x+12) per hour since it takes 12 hours longer. The two cranes combined, unload at 1/8 per hour, which must be faster than either one alone. Example: If I can eat a pie in 3 hours and you can eat a pie in 6 hours: 1/3 + 1/6 = 3/6 = 1/2, so together we can eat a pie in just 2 hours... less time than either one alone. Makes sense. Back to the cranes, then: 1/x + 1/(x+12) = 1/8 (2x+12) / (x^2 + 12x) = 1/8 16x + 96 = x^2 + 12x x^2 - 4x - 96 = 0 (x - 12) (x + 8) = 0 - x = 12 or -8 Since the rate cannot be -8, the answer is x = 12 Crane A can unload all by itself in 12 hours. Crane B can do it in 24 hours, and together they can do it in just 8 hours. Check: 1/12 + 1/24 = 3/24 = 1/8 Their combined rate is, indeed, 1/8 per hour!
Q:My husband and I will be going to the Crane Resort in Barbados for 3 nights in January. Just wondering, will we need to rent a car or is everything we need to see right there on the beach. Past Crane visitors or even Barbados civilians, please respond. Thanks :)
The okorder / If you only are focusing on relaxing at your resort/beach then renting a vehicle is not necessary.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords