• Topkit Tower Crane TC7021-F-50 for Building Construction System 1
  • Topkit Tower Crane TC7021-F-50 for Building Construction System 2
  • Topkit Tower Crane TC7021-F-50 for Building Construction System 3
Topkit Tower Crane TC7021-F-50 for Building Construction

Topkit Tower Crane TC7021-F-50 for Building Construction

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Brief Description:

 

Tower crane 7021 is used to lift building material such as concrete, steel bars vertically and horizonally.

 

All tower cranes consist of the same basic parts:

1. The base is bolted to a large concrete pad that supports the crane.

2. The base connects to the mast (or tower), which gives the tower crane its height.

3. Attached to the top of the mast is the slewing unit (large ring-gear and motor) that allows the

crane to rotate.

4. Attached to the slewing unit is the jib (or boom), the machinery arm, the counterweights

 and, the Operators cabin

 

Features:

 

Typehammer head
Max loading capacity: 12t

Tip loading:2.1t

Jib length:70m

Free standing height:50m

Mast section: 2mx2mx3m

Topkit Tower Crane TC7021-F-50 for Building Construction

Topkit Tower Crane TC7021-F-50 for Building Construction

 

 

 

 

Loading Diagram:

Topkit Tower Crane TC7021-F-50 for Building Construction

 

FAQ

1. The foundation type available: fixed, undercarriage, travelling type

2. The life time of tower cranes: usually 10 years

3. Packaging:each unit needs 6x40HQ for free standing height

4. Shipping time: Usually around 35 days after receipt of advance payment

5. Payment term: TT, L/C

 

TRUEMAX was established in 2003 at Hangzhou, China. In the past 10 years, TRUEMAX has established over 10 manufacturing base, to offer the one-stop services in construction machinery filed, including R&D, designing, manufacturing, quality control and delivery. 


        With core principle of “True to Quality, Ture to Customer”, our product has been exported to more than 100 countries with high customer appreciation & brand popularity.


        TRUEMAX provide the full series of construction machinery and one-stop overall solution. Our product range covers pre-fabrication including aggregate crushing, dedusting and block making; concrete series including mixing, batching, pumping & placing; construction series, such as tower crane, building hoist, suspension platform and lifting basket; light construction machinery, including compacting, cutting, surface finishing machines & rebar processing machines. 


        Especially the concrete placing boom, we’re the No. 1 in term of products variety, with top quality placing boom of placing radius ranging from 10 meters to 51 meters over 10 different series, the excellent quality & performance has been tested & approved by being used in lots of world famous high buildings.


        The manufacturing base of TRUEMAX adopts 6S management system.  Quality control system are implemented strictly in the whole procedures, including components purchasing, fabricating and manufacturing, packing and dispatch pre-inspection, ensuring the perfect quality assurance for all of our products. With international certificates like ISO9001:2008, CE & SGS, TRUEMAX guarantee the international first-class level for all of our products.


        At present, TRUEMAX is the“Grade A Export Enterprise of China Customs”, “Famous Export Brand of Zhejiang”, “ Famous Export Brand of Hangzhou”, “High & New Technology Enterprise of Hangzhou”, “Top 100 innovation-type foreign trade enterprise of Hangzhou”&“ Key enterprises of Xiacheng district, Hangzhou”, with support from Zhejiang Public Foreign Trade Service Platforms consecutively in 2012 and 2013.


        “Quality achieves outstanding success, innovation leads the bright future”, our working principle has leads the rapid expansion of TRUEMAX, with branches and spare parts distribution centers established oversea step by step. We’re targeting to complete the global layout of TRUEMAX Agent within next 2 years, and “TRUEMAX 6S” stores within 5years.


        In the coming days, TRUMAX will continue to forge ahead, make our best efforts to create the best platform for career performance, as well as to realize the maximized mutual benefit with all TUREMAX friends, partners, agents & clients.     


        “View Broad, Ambitions Boundless”, at a new height, we wish to join hands with all the ambitious friends together, contributing to the consummation of the first-class quality construction machinery industry, and creating the new glory constantly.


 

Q:I'm curious
Shortly okorder /
Q:live in marshes???
Why didn't you just wiki it? The common name of this bird references habitat like at the Platte River, on the edge of Nebraska's Sandhills in the American midwest.
Q:I recently read that adult crane flies consume nectar or do not eat at all, their only purpose is to mate. After a crane fly mates, is starvation the cause of its death, or is there something else that ends its life such as age?
Adult crane flies survive from all the fat they have, from their larval and pupal stage.When they run out of it, they eventually cannot find food, and by that time, they should die of age.It's probably both causes, if not because of predators,disease..etc
Q:I just watched hunger games, and in the end Secana Crane was locked in a room with nightlocks, but why did they do that to him? what did he do to get killed?
President Snow killed him because he allowed the games to break its rules for the first time ever by having two victors. What Katniss and Peeta did was a sign of rebellion and the Capitol relented by letting both of them live, otherwise that there would be no victor. That was not supposed to happen and President Snow had already warned him to stop any signs of rebellion prior but Crane let it happen. Someone needs to be held responsible and since Crane is the gamemaker, he has to die. This is to show that no one holds greater power than Snow over the districts and Capitol and no one should defy him. Rebellion leads to death, no matter what your role is or how you might have contributed to it.
Q:↑ pretty much explains itself. (:~Animal_Lover
Probably okorder /
Q:It's better if the explanation is not complicated.TQ
Hello, 1. Modularity: You can build ships (larger ships) in modular sections and have the crane lift these modular sections and put them into place for final assembly. This is one major advantage that was not available back in the day
Q:How much more than m of tower crane jib winch point height should be equipped with anemometer
According to the regulations of JGJ196-2010 for the safety and safety of installation, use and disassembly of tower cranes for construction purposes:The use of 4.0.15 tower crane height of more than 30m should be equipped with obstacle lights, jib root hinge height of more than 50m should be equipped with anemometer.
Q:How many types of crane?
Types Of Crane
Q:In stephen Crane's The Open Boat does the correspondent change from the beginning of the story to the end?
It relies upon entirely on the area. If the character revealing the dying(chosen climax) is a fortune teller or vacationer from the destiny who occurs to understand the effect of the story, i might discover it setting up. As you suggested, it may on occasion make the dying or climax extra emotional because of the fact, alongside the way, you're praying something will substitute the oncoming adventure entirely. while that fails to ensue, you are able to share the different characters' emotional misery, that helplessness and expertise that no longer something would desire to be executed on your area. Now, if the dying or climax is given away with the aid of the author in a narration or with the aid of a talkative character which could no longer have in all hazard time-honored what grow to be to ensue, i may be somewhat unnerved. It dismantles the story's exhilaration and stress for the reason which you will finally end up critiquing each little thing that follows. Why is that this happening if the character is meant to die? and this is pointless if he/she will have the means to finally end up lifeless besides. Me in my view... i like walking with the aid of a room packed with twists and turns with a blindfold on(no longer actually as that would desire to be very uncomfortable). the place is the buzz in understanding the effect of something if it does not slot interior the context? Authors of those particular novels want stress to construct and yet they get so absorbed of their very own paintings that they experience the objective audience ought to understand each little thing unexpectedly. i think of that's a variety of education dumping. although, as i discussed in the previous, if the way of informing an objective audience of the story's effect suits, than it could make the e book very relaxing. :) ~~ ??MeryKheper??
Q:My relatives and their kids are coming the 28th for our Christmas does any body know where I can get a Brio Crane for a 3 year old? most web sites I checked say sold out. Just wondering.
Hi okorder . Please visit it and it will satisfy your needs. Best regards, Soma

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords