• TC4608 towercrane / QTZ40B1 tower crane System 1
TC4608 towercrane / QTZ40B1 tower crane

TC4608 towercrane / QTZ40B1 tower crane

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
100 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

Specifications

1. The mast adopts a piece structure. It is convenient to transmit, store and place 
2. The hoist uses double motors 

1. Version: fixed and traveling type
2. Free height: 32 meters
3. Max. height: 140 meters
4. Max. radius: 46 meters
5. Jib end load: 0.8MT at 46 meters
6. Max. load: 4MT at 12.9 meters
7. Hoisting mechanism: JT1
8. Drum capacity: 200 meters
9. Lifting speed: 3.32m/min~60.97m/min
10. Slewing mechanism: HZ-40
11. Slewing speed: 0.7r/min
12. Trolley mechanism: BF-40
13. Trolley speed: 28m/min
14. Power line voltage: 380V/50Hz
15. Color: yellow
16. Counter weight: Stell-structured frame (without concrete)
17. Mast section: 1.6 x 1.6 x 3m 
18. Mast section and mast section connection: by screw
19. Foundation bolt: included (8 sets)
20. Cabin: included
21. Telescoping cage: included 
22. Pump and cylinder: included 
23. Main cable: included 
24. Basic mast: included

Q: If I have one week, is that enough time?
It all depends on how fast you can make one paper crane and how many hours you have available each day. If you made 15 an hour for 10 hours each day (150 cranes a day) for 7 days you would have 1050 cranes. You will probably find that you begin to go faster, the more cranes you make. However, after 2 or 3 days you will get sore hands and this will slow you down again. It's easier when you work as a team.
Q: What are the characteristics of a tower crane?
Two, according to the structure characteristics of the boom can be divided into the pitching amplitude boom (boom) and trolley jib tower crane (arms).Luffing jib tower crane luffing jib by lifting does not achieve the amplitude, the utility model can give full play to the effective height of the boom, simple mechanism.Trolley jib tower crane is installed on the level of the boom on the track trolley achieve amplitude, the utility model has the advantages of large amplitude range, trolley can near the tower, can load amplitude, the shortcoming is: the boom stress on the structure of complex, high requirements, and the boom and the car must be in the building the upper part of the spire, the installation height should be higher than the roof of buildings 15-20 meters.Three, according to the turret structure, the rotation mode can be divided into lower slewing (turret rotation) and upper slewing (turret not slewing) tower crane.Under the rotary tower crane slewing bearing, balance weight mechanism are arranged on the lower end of the main tower, its advantages are: less bending, low gravity, good stability, convenient installation and maintenance, the disadvantage is the higher requirement to the slewing bearing, installation height is limited.The slewing tower crane is characterized in that the slewing bearing is balanced and the main mechanisms are arranged at the upper end, and the advantage of the utility model is that the lower part of the tower body can be simplified, and the lifting and the adding of the joint can be simplified because the tower body is not turned. The disadvantage is: when the building exceeds the tower height, due to the influence of the balance arm, limit the slewing of the crane, at the same time, the center of gravity is higher, the air pressure increases, the weight increases, so that the total weight of the whole machine increases.
Q: How about the installation and disassembly of the tower cranes?
Authorized by the national security inspection department, the local special operations training school or the technical quality supervision bureau, after the study, assessment, qualification and graduation permit, will give you special operations installation, removal operation certificate.
Q: Examples of filling and acceptance forms for tower cranes and examples of filling in.
3 no or no inspection items are completed". In the absence of such or part of the sub - item, it shall be drawn on its serial number".
Q: A. Designated operatorsB. All construction site personnelC. InspectorsD. All of the above
Crane are extremely dangerous and complicated machinery , the operators need intensive education and training , they have to pass the required tests to be certified . Now even the signal guy on the ground who helps the crane operator needs to be certified . So your answer is A.
Q: Our company is responsible for the general contracting construction project foundation pile by Party A but other subcontractor for the construction of pile foundation of a pile foundation the company has quickly completed the construction scheme of the party and the supervision of tower crane foundation now has been reported by the audit Party B must contact us pile pile. We believe that Party A shall bear it at one time. Ask the net friend is this so?
1, the pile foundation of the pile and tower crane foundation pile is not the same item, cannot pile foundation pile and tower crane foundation pile together to talk about.2, you did not say who is tower crane?. Who is responsible for the tower crane installation, including tower crane foundation construction.3, but, in fact, in most cases, the mechanical leasing company only provides technical requirements, providing tower crane foundation section. Piling and foundation concrete are the responsibility of the contractor.4, if the contract does not have a definite agreement on the construction of the tower crane foundation, the general contractor shall be responsible for the cost of piling the tower crane foundation. The piling Team can be the construction unit of the pile foundation, and also can be found by the general contractor.5, in the future tower crane foundation construction program should be clear about this matter, avoid controversy.These are only personal opinions.
Q: i need six colors mentioned in the story and wat each one means thanks :)
From: The Open Boat By Stephan Crane. These waves were of the hue of slate... ...save for the tops, which were of foaming white... In the wan light, the faces of the men must have been grey. ...the color of the sea changed from slate to emerald-green... ...wild with lights of emerald and white and amber. ...near patches of brown seaweed... ... at the men with black bead-like eyes. ... marked by dingy clouds, and clouds brick-red, ... Ain't they peaches? A faint yellow tone came into the sky over the low land. ... a small bluish gleam on the edge of the waters. ... with a sky of pure blue...
Q: do they eat them or what??i hear about hunting them and i think cool but what do you do with them i mean do they tast good??
This Site Might Help You. RE: what do people do with sandhill cranes after shooting them? do they eat them or what? i hear about hunting them and i think cool but what do you do with them i mean do they tast good?
Q: why do whooping cranes migrate? If its because its to cold in the winter then why not stay in the warm weather?
It is freezing cold in the upper Midwest during the winter. Whooping cranes simply cannot find any food, even if they can endure the cold. During the summer, the upper Midwest has longer daylight hours and slightly cooler temperatures. than their wintering grounds in Florida. The longer hours allow them and their young more time to gather food. Reproduction is very taxing on the female body, even if it is just laying eggs. The young need the extra time and nutrition to grow quickly into adult sized birds. Small birds are more vulnerable to predators.
Q: What kind of personnel should be installed for the tower crane installation and disassembly?
According to GB specifications:2.0.3 the installation and disassembly of tower cranes shall be provided with the following personnel:1. The project and the safety supervisor and the mechanical management personnel who have the safety inspection certificate;2, with special construction operation qualification certificate of construction, lifting machinery, installation, demolition workers, lifting signal workers, lifting drivers, cable operators and other special operations personnel.And an electrician.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords