• Steel Frame with Easy Operation Formed Formwork System 1
  • Steel Frame with Easy Operation Formed Formwork System 2
  • Steel Frame with Easy Operation Formed Formwork System 3
  • Steel Frame with Easy Operation Formed Formwork System 4
  • Steel Frame with Easy Operation Formed Formwork System 5
Steel Frame with Easy Operation Formed Formwork

Steel Frame with Easy Operation Formed Formwork

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 m²
Supply Capability:
100000000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

     1. Structure of Steel Frame Formwork GK120

        There is a prizing part designed in the corner, which can help to position and remove formwork easily.

        The plywood is screwed on from the back when connecting frame and plywood, so the surface of the finished concrete is             perfect.

       The formwork series are a complete system with a full set of accessories, and can be set up flexibly according to project              demand.


     2. Main Features of Steel Frame Formwork GK120   

      Light weight

      High strength

      High standardized system

     Easy connection with adjustable steel clamp

     Convenient and fast corner formwork

     Flexible to assemble and application


   3. Steel Frame Formwork GK120 Images

                         

 

      4. Steel Frame Formwork GK120 Specification

      -The steel frame formwork is plywood covered with hollow steel. The plywood is 18 mm thick.

     -The frame is highly strengthened, and the wall formwork can bear lateral pressure 60 KN/m2 while the column formwork can bear 80 KN/m2.

     -As a standardized system, it is flexible to assemble , wood batten can be filled to satisfy the need f of non-standard size.

     -The adjustable steel clamp is convenient to use, and can hold tightly.

    -There is a prizing part designed in the corner, which can help to position and remove formwork easily.

    -The plywood is screwed on from the back when connecting frame and plywood, so the surface of the finished concrete is perfect.

   -The formwork series are a complete system with a full set of accessories, and can be set up flexibly according to project demand.

 

      5. FAQ of Steel Frame Formwork GK120

        1) What can we do for you? 

      .We can ensure the quality of the vinyl banner and avoid extra expenses for customers.    

      .We can provide you the professional design team.    

      .We can provide fashionable and newest styles for you.    

      .We can design the artwork for you.    

      . Please feel free to customize.  

 

     2) What promises can be done by us?

     . If interested in Steel Frame Formwork GK120, please feel free to write us for any QUOTE.

     . If printing required, please advise asap because the whole set need much more time to complete.

     . Please DO check goods when courier knocks your door and contact us asap if any issue.

 

   3) What about of our after-sale service?

   . Response will be carried out in 24hours  after receiving any complain or request.

   . Steel Frame Formwork GK120 cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

  4) What about the package and shipping time?

    .Packing:  As Customer's Requirements

    .Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.  

  .Shipping time:

    Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. 

    Other mass qty of Steel Frame Formwork GK120, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.  


Q:Can steel frame formwork be used for both horizontal and vertical structures?
Yes, steel frame formwork can be used for both horizontal and vertical structures. Its sturdy and durable construction enables it to support the weight and pressure of concrete for various types of structures, regardless of their orientation.
Q:What are the safety precautions for working with steel frame formwork?
To ensure the well-being of workers and minimize accidents, there are several important safety precautions that should be observed when working with steel frame formwork. 1. Personal Protective Equipment (PPE): Workers must wear appropriate PPE, such as safety helmets, safety glasses, gloves, and steel-toed boots. This protective gear helps mitigate the risk of head, eye, hand, and foot injuries. 2. Training and Education: Workers should receive proper training and education on the use of steel frame formwork. This includes understanding the equipment, its limitations, and safe assembly and dismantling procedures. Adequate training helps prevent accidents caused by human error or negligence. 3. Inspection and Maintenance: Regular inspection and maintenance of steel frame formwork is crucial. It is important to check for damaged or worn-out components, such as bolts, joints, or scaffolding. Any faulty or defective parts should be immediately repaired or replaced to avoid potential accidents. 4. Secure Foundation: The formwork must be set up on a stable and level foundation. This prevents sudden collapse or shifting of the structure, reducing the risk of accidents. The ground should be properly prepared and compacted before placing the formwork. 5. Secure Anchoring: Proper anchoring or support is essential to prevent movement or collapse during construction activities. Sturdy braces, ties, or supports should be used to ensure stability and structural integrity. 6. Fall Protection: Adequate fall protection measures should be implemented. This includes installing guardrails, safety nets, or personal fall arrest systems (PFAS) to prevent workers from falling from heights. Proper training on the use of fall protection equipment and its correct installation is essential. 7. Communication: Clear communication among workers is vital for maintaining safety. Workers should be trained to use appropriate hand signals or communication devices to coordinate their movements and avoid potential accidents. 8. Safe Lifting and Handling: Workers should be trained in safe lifting techniques and the proper use of lifting equipment, such as cranes or hoists, to minimize the risk of back injuries or strains. 9. Weather Conditions: Extreme weather conditions, such as heavy rain, strong winds, or freezing temperatures, can affect the stability and safety of steel frame formwork. Monitoring weather forecasts and taking appropriate measures, such as suspending work during adverse conditions or providing additional support to the structure, is important. 10. Emergency Preparedness: Workers should be familiar with emergency procedures, such as evacuation routes, first aid locations, and the location of fire extinguishers. Regular drills and training sessions on emergency response can ensure workers are prepared to handle unexpected situations. By adhering to these safety precautions, workers can significantly reduce the risk of accidents and injuries when working with steel frame formwork. Prioritizing safety and implementing necessary measures to create a secure working environment is paramount.
Q:What types of projects are steel frame formwork suitable for?
Steel frame formwork is suitable for a wide range of projects, including high-rise buildings, bridges, tunnels, dams, and industrial structures. Its versatility and strength make it an ideal choice for projects that require large-scale concrete pouring and need a durable and reusable formwork system.
Q:Are there any limitations on the size and shape of structures that can be constructed using steel frame formwork?
Yes, there are limitations on the size and shape of structures that can be constructed using steel frame formwork. The size of the structure may be limited by the maximum dimensions of the steel frame panels. Additionally, complex and intricate shapes may pose challenges in terms of the formwork's ability to accommodate and support the desired design. However, with proper planning and engineering, steel frame formwork can still be used to construct a wide variety of structures, including buildings, bridges, and other concrete elements.
Q:How does steel frame formwork handle the placement of electrical and plumbing systems within the concrete structure?
Steel frame formwork for concrete structures provides a flexible and efficient solution for accommodating electrical and plumbing systems. The formwork system allows for precise positioning and embedding of conduits, pipes, and electrical boxes within the concrete structure. This is achieved by incorporating special openings and recesses in the formwork panels, which can be adjusted and customized according to the specific requirements of the electrical and plumbing systems. The steel frame formwork ensures that these systems are seamlessly integrated into the concrete structure, providing a durable and secure foundation for the electrical and plumbing installations.
Q:How does steel frame formwork ensure proper anchoring to the ground?
Steel frame formwork ensures proper anchoring to the ground through a combination of factors. Firstly, the steel frame itself is designed with sturdy anchor points and connection mechanisms that help secure it firmly to the ground. Additionally, the formwork is often supported by vertical supports such as props or scaffolding, which further enhance its stability and prevent any movement. This ensures that the formwork remains in place during the concrete pouring and curing process, ultimately resulting in a properly anchored structure.
Q:What is the maximum load capacity of steel frame formwork?
The load capacity of steel frame formwork can vary depending on factors such as design, dimensions, and steel quality. However, steel frame formwork is generally recognized for its high load-bearing capacity. It is specifically engineered to withstand heavy loads during concrete pouring and formwork support. Typically, steel frame formwork can handle load capacities ranging from 60 to 100 kilonewtons per square meter (kN/m²). This capacity enables it to support the weight of concrete, reinforcement, and any additional loads encountered during construction. It is worth noting that the load capacity can be influenced by factors like steel frame thickness, support spacing, and weld quality. Furthermore, the specific application and engineering calculations for a particular project can also impact the load capacity. Hence, it is crucial to refer to the manufacturer's specifications and guidelines to determine the maximum load capacity of a particular steel frame formwork system. Seeking guidance from a structural engineer or qualified professional can provide more precise information concerning the load capacity based on the specific project requirements.
Q:Can steel frame formwork be used in earthquake-prone areas?
Yes, steel frame formwork can be used in earthquake-prone areas. Steel is known for its durability and strength, making it suitable for construction in areas prone to seismic activity. Steel frame formwork provides a rigid structure that can withstand the forces generated during an earthquake, ensuring the safety and stability of the building. Additionally, steel formwork can be easily assembled and disassembled, allowing for quick and efficient construction, which is especially beneficial in earthquake-prone areas where time is of the essence. However, it is important to follow the relevant building codes and regulations specific to the area to ensure the proper design and installation of the steel frame formwork system.
Q:How does steel frame formwork accommodate for different concrete curing methods?
Steel frame formwork is highly adaptable and can easily accommodate different concrete curing methods. The formwork allows for easy adjustments in terms of height, shape, and size, enabling it to be customized to suit various curing methods such as wet curing, steam curing, or even precast curing. Additionally, the steel frame formwork facilitates efficient and controlled pouring of the concrete, ensuring uniform curing throughout the structure. Its versatility and strength make steel frame formwork an ideal choice for accommodating different concrete curing methods.
Q:Does steel frame formwork require any specific handling equipment?
Efficient and safe installation and removal of steel frame formwork typically necessitates the employment of specialized handling equipment. This is due to the weightiness of the steel frame formwork and the need for elevation adjustments on construction sites. Cranes, forklifts, and hoists are commonly utilized in the handling of steel frame formwork. Cranes are particularly useful for lifting and positioning the larger and heavier formwork systems. Forklifts are frequently employed to transfer the steel frames between the storage area and the construction site. Hoists, on the other hand, are instrumental in raising and lowering the steel frames to desired heights during installation. By utilizing suitable handling equipment, not only can worker safety be assured, but productivity and efficiency can also be enhanced on construction sites. It is imperative to have trained and skilled operators who possess a thorough understanding of the specific handling equipment and safety protocols in order to prevent accidents and damage to the steel frame formwork.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords