Slim 8000mah polymer Power Bank with Dual USB

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Name

Ultra Slim Power Bank

Size/Net Weight

125*72*14mm/180g

Body Material

Aluminum Alloy

Battery Type

Polymer

Battery Capacity

6000mah

Output USB Port

Daul port

Power Statues

LED power indicator

Charging Time

About 7hrs

Input

DC5V/1A

Output

DC5V/1A DC5V/2.1A

Recycling Life

Over 500 times

Charging Temperature

0°C~+45°C

Discharge Temperature

-20°C~+60°C

Application

Iphone, Ipad, Tablets, MP3, MP4, Smartphone ect.

Certificates

CE&ROHS&FCC

Warranty

12 month









Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:I work at Citizens bank and I hate it?
Well, i seriousley love your question as it gives me a chance to vent mine and many others frustration at the banks. It is not by chance that your job is constantly advertised! have you thought of that ? i can try and say this , the banks are sneaky, the banks are greedy and people in the public will always be P/O at them, they put people like yourself at the counter that eventualy hate their job and burn out, and move in another for the job. Lets go to how you explained the holding of the check for three days and blaa blaa blaaa.the thing your not told and all bank CEO know is that YES halleluya! technology caught up a millinium ago.it is possible at the click of a button to have that payment , money and cet. on time all the time. The idea is to make an excuse so money sits around for longer earning interest for the bank (at any excuse{this is called greed} any excuse to the client ) to double the whammy, the bank comes up with a fee to charge the poor sucker Oppps Client , when they don't have time to look at their statement everytime!Dear sweety when you run a household, have a lunatic husband, demanding greedy me me me its all about me teenagers, some even have toddlers on topthen go in and battle with an air head at a bank, tell me again to have a nice day !
Q:How can I get a solar powered roof in LA?
call so. cal. Edison up they might help on some financing also check around the new tech stuff is much better than last years stuff they are finally moving there *** in this field
Q:Which GENERALLY gives better auto rates, the BANK or a DEALERSHIP?
Usually dealership, but you can also try a line of credit from your bank, buts best to ask the bank yourself and see the amount of credit they can give you and at what rate. Dealership loans are actually through banks, it just seams to be easier to get approved
Q:Banks allow us to live wealthier lives?
when a resource runs out, its price goes up, and market economy adjusts by using the resource more efficiently, and eventually replacing it with a different resource. Banks help this by loaning money to whoever needs to make investment in this process, e.g. to consumers who buy electric cars, or for construction of sustainable power plants. Government's role is to make sure the above works as intended.
Q:Does the fact that the Federal Reserve is owned by private banks and charges us to run the system bother you?
Yep. okorder
Q:Power Supply Burn In Process?
Sure. It means your power supply, the one you have in your hands, has been operated on a load bank that draws the maximum rated power from the supply for a specific amount of time. It is similar to having an automobile engine run on a test stand at maximum design RPM for a specific amount of time. It is a good thing. Typically a sample of the production run is tested, perhaps 1 in 50, this way and all are plugged in for a few moments to make sure they operate and produce acceptable voltages but that test fails to isolate marginal components. The power supply normally won't be operated long enough for the whole power supply to get to full operating temperature. Temperature is what kills electronics. As components get hot their values change. That change is frequently in the direction that allows more current flow. More current means more heat and this vicious circle continues until something smokes and the supply stops working, best case, or it sets something on fire, worst case. The company that built your supply cared enough to test every supply it makes to the same degree as the cheaper companies test sample supplies. You shouldn't have any trouble with a unit tested this way. At least not for a long time. Congratulations, it sounds like you have an eye for the better stuff on the shelf.
Q:Do whole-house uninterruptible power supplies (UPS) exist?
Sure.
Q:Banks power pack for Ford 7.5L (460 cid)?
I would sure like to know what you want that for. Just stock 460 is strong enough! Use to drive one.
Q:bad creditwill salliemae or bank cards take my money out bank?
These collection agencies will soon sue you. They can garnish your wages or go after your assets (bank accounts). Statue of limitations on credit card debt is 7 years (in most states). With student loans, they can come after you for a lifetime.
Q:Pre-Calculus word problem help please?
This one is challenging because of the tricky wording. You have to do most of the problem before you can truly understand the last sentence. First, let's compute the least amount of money we can spend 1) Go straight across the river -- 0.5 miles * $12k / mile $6,000. 2) Go directly down the shore -- 8 miles * $8k / mile $64,000. 3) Add them together for a minimum cost of $70,000 ($6+$64). Now, you have $72k to spend, but you only need $70k to go straight over and down. The words how far from the substation should the wiring come to shore? must mean the company would like to run the wiring UNDERWATER for part of the 8 miles. So, how much can you run wiring underwater for the extra $2k we have to spend? If it costs $12k per mile $2k * 1mile/12k 1/6 mile extra So, $2k will get you an extra 1/6 mile downstream underwater. Or, stated another way, the wiring should come to shore 7 and 5/6 miles from the substation. 8 - 1/6 7 5/6.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range