Scaffolding Accessories Limit Pin
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Place of Origin: | Brand Name: | Model Number: | |||
Type: | Material: | Surface: | |||
Color: | Size: | Weight: | |||
Technics: | Standard: | scaffolding coupler: | |||
Stable: |
Packaging & Delivery
Packaging Detail: | in bulk or pallet according to customer's requirement |
Delivery Detail: | no more than 20days |
Scaffolding coupler
1.have our own factory
2.Good bearing capacity
3.Stable& durable
4.Easy to assemble or dismantle
Our capability
Produce Equipment: 4 forged production lines,2assembly line,2 bolish line ,1sets 400 punch press,3sets 300t punch press
Produce Technology: stamping/pressing/forging;
Produce Capacity: 500 tons/month
Output: 3000 pcs/day couplers,3000pcs steel plank
Specification
Presed joint pin couper
1.size:48.3mm
2.weight:0.8kg
3.Material: Q235/225/345
4.surface :self-color / zinc plate / electro galvanized / HDG or painted
5.Standard: EN74 ,BS1139
6.Anti-rust ,skidproof ,high breaking strength
7.Durable finish, reliability, low maintenance, corrosion resistance, robust construction and high tensile strength
8. OEM serice is available
- Q:Key points for safety of portal scaffolding
- The main points of the safety of portal scaffolding1, scaffold erection must be held by professional Jia Zigong, and according to the current national standard "special operations personnel safety assessment management rules" (GB5036) qualification certificates. Staff should conduct regular physical examination, which is not suitable for high operator, not on the scaffold.
- Q:What does my earth science teacher mean when he says to do a powerpoint with Link Scaffolding,how d u do it?
- Link Scaffolding = A search found no answer. - Ask teacher to clarify.
- Q:I would like to ask how much scaffolding steel prices, scaffolding steel pipe use what are the requirements?
- The general price of 3800-4200 yuan per ton, you need to see the material and specifications.1 scaffolding steel pipe material Q195, Q215 or Q235, 2 scaffolding steel pipe specifications of phi, phi, phi, phi, phi, phi, 3.25, phi, phi, phi, 2.752, 5, 3 scaffolding steel pipe length of 1-6 meters, half a meter specifications; according to customer requirements specifications4 scaffolding steel pipe standard SY/T5768-
- Q:Can anybody provide me the formula for calculating scaffold volume on circular tank?
- Step 1. Measure the diameter of the tank (D). Step 2. Measure the height (h) for a vertical tank or length (l) of a horizontal tank. Step 3. Calculate the cross-sectional area of the tank using Equation 1. Equation 1: Cross-sectional Area, A = 3.14 x D x D/4 Step 4. Calculate the volume of the tank in cubic feet using Equation 2. Equation 2: Volume in cubic feet = A x h [for a vertical tank] Volume in cubic feet = A x l [for a horizontal tank] Step 5. Convert the volume of the tank from cubic feet to gallons using Equation 3. Equation 3: Volume in gallons = (Volume in cubic feet) x 7.48
- Q:What are the advantages and disadvantages of the fastener type steel pipe scaffold and bowl buckle steel tube scaffold
- (2) efficacy: the most commonly used rod length of 3130MM, weight 17.07KG. The entire frame cannibalize speed is 3 ~ 5 times faster than conventional, faster effort to fight demolition, workers with a hammer to complete all assignments, to avoid the inconvenience caused by bolt operation; (3) with strong: the main components are the ordinary steel tubular scaffolding steel pipe, steel pipe connecting fastener with general availability in general, strong.
- Q:The basic form of external scaffolding
- The bowl buckle steel tube scaffold is composed of steel pipe pole, cross bar, bowl buckle joint and so on. The basic structure and erection requirements and fastener type steel pipe scaffolding similar, the main difference lies in the bowl buckle joint.The bowl buckle joint is the core component of the scaffold system, which consists of the upper bowl buckle, the lower bowl buckle, the cross bar joint and the limit pin on the upper bowl buckle.
- Q:The bottom of the cantilever scaffold must be provided with the sweeping rod
- Product quality certificate and inspection report. Rust must be replaced, not to be used to build the frame.
- Q:I have to write a 1 page commentary on a geographical issue for school, and, I've never done that before.Could someone please tell me or link me to a very simple 'writing commentary' scaffold for beginners?Please?Thankyou :)
- To know about College and university! log on to alumne /
- Q:Disc scaffolding and bowl buckle scaffolding which kind of bridge support better?
- Characteristic1 Multi function. According to the specific requirements of construction, can be composed of multiple 0.6m module group frame size and load of single row, double row scaffolding, supporting frame, supporting the construction of equipment to enhance the function of frame columns, and other materials, and can do curve layout. Scaffolding can be adjusted with the bottom of the support, adjustable upper support, dual adjustable early demolition, pick beam, pick up the rack and other accessories with the use of various types of steel scaffolding can be used in conjunction with each other to achieve a variety of multi-functional
- Q:What are the requirements for the sampling inspection of scaffolding?
- Inspection and acceptance of cantilever scaffold1 after the erection of the cantilever support, the scaffold is erected;2 before loading on the work layer;3 after each set of 10m height;4 after reaching the design height;5 in the case of more than six winds and heavy rain;6 use more than a month.Cantilever scaffold inspection document1 special construction plan and design documents;2 safety technical disclosure;3 the provisions of appendix D, table D.1.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Scaffolding Accessories Limit Pin
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords