Shoring Coupling Pins Scaffolding Accessory

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Place of Origin:
Shandong China (Mainland)


Model Number:
coupling pin
Type:
Scaffolding Parts
Scaffolding Part Type:
Scaffolding Props
Quality:
High yield strength and tensile strength
STANDARDS:
BS1139 & EN74
MATERIAL:
Q235 steel
SIZE:
48.3*3.25mm pipe
PRICE:
CONTACT FOR LATEST PRICE
SAMPLE:
FREE
TECHNIQUES:
press
OEM SERVICE:
OFFERED
SHIPMENT:
20-30 DAYS

Packaging & Delivery

Packaging Detail:steel pallet or plywood pallet
Delivery Detail:20-30DAYS AFTER RECEIVING ADVANCE PAYMENT

Specifications

1.shoring coupling pins for scaffolding
2.Q235 steel
3.dia:40*180mm
4.pipe:48.3*3.25mm
5.0.05kg

Name and spec.  

1.shoring coupling pins scaffolding accessory
3.dia:32*2*178mm
4.pipe:48.3*3.25mm
5.wt:0.005kg


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:what are the scaffolding building on I-44 between milemarker 282 and 283 east bound on the north side of the h
Are you talking about where the trains are? The cylander shaped buildings? They are oil/fuel tanks... they have a big balloon like thing with a weight on top that as it fills will fill out inside the scaffolding. I have not seen them filled in years though.
Q:I want to know the classification of scaffolding in the building
Steel tubular scaffold. As to the steel pipe, and combined with other type of steel pieces composed of scaffolding, such as the channel has a base in the backwater or scaffolding, connecting steel scaffolding and so on. ScaffoldingBowl buckle steel pipe scaffolding when using steel pipe, as a "single steel pipe scaffolding"; when using the steel cross bar, for the "steel pipe based scaffold".
Q:I need to set up scaffolding on a tiled floor to reach some lights 28 ft high?
Put the wheels (locked) on 2 x 12 planks. This will distribute the weight.
Q:Classification and erection of scaffolding and related specifications
7, the unloading platform progress specification in our city construction scaffolding scaffolding collapse prevention effect falling accident according to the "construction safety management regulations" "construction of steel tubular scaffold safety technical specifications" (JGJ130-2001) related matters notice: now, the scaffold erection procedures for the implementation of the 1 basic requirements, construction the enterprise construction project before the implementation of special case according to the characteristics of building scaffolding (highly 24m tubular steel scaffolding, cantilever scaffold should be attached to the safety check node) the case should be responsible for the enterprise technology (General Engineering) signed by the chief supervision engineer signature recognition project review organization and implementation review does not pass the special construction case the implementation of
Q:Said chrysanthemum disc scaffolding system, disc scaffolding system, wheel type scaffolding system, buckle scaffold, layher frame
Cross barName specification A (mm) B (mm) theoretical weight (kg)
Q:How do you calculate the tonnage of scaffolds to use in a project?
tonnage is related to the volume of a certain material to be used in a certain project... so as to volume, tonnage is just the volume of the material to be used, given the specifiations in this case, scaffolds. consult your design and count the distribution of the scaffolds to be used.. average ratio of scaffolding tonnage is a ton per 10 square meter... also depends on the quantity of the project.
Q:Scaffold removal should comply with those requirements......
Preparation of scaffold safety demolition before demolition1 check the scaffold fastener connection, the wall, the support system is in line with safety requirements.2 according to the inspection results, supplement and improve the design of the demolition process, and after the implementation of the approval.
Q:Mobile scaffolding accessories prices
The price of each region is different, are you renting or buying?
Q:why in medieval times did they always build a new scaffold between beheadings?
Well that's not entirely true; they didn't ALWAYS built a new scaffold. Probably movies let you think so but that was not the case.
Q:]How does Pearl react when Dimmesdale calls Hester and herself to mount the scaffold with him?
The answer can be found in the novel The Scarlet Letter by Nathaniel Hawthorne. Read that and you'll have the answer!

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range