• Scaffolding Accessories for Cuplock Scaffoldings System 1
  • Scaffolding Accessories for Cuplock Scaffoldings System 2
  • Scaffolding Accessories for Cuplock Scaffoldings System 3
Scaffolding Accessories for Cuplock Scaffoldings

Scaffolding Accessories for Cuplock Scaffoldings

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
30 m.t
Supply Capability:
10000 m.t/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Scaffolding System Accessories Cuplock Scaffoldings

Product pictures:

Scaffolding Accessories for Cuplock Scaffoldings

Scaffolding Accessories for Cuplock Scaffoldings

Scaffolding Accessories for Cuplock Scaffoldings

Product description:

Name:

Ringlock Scaffolding accessories

Category:

Scaffolding System

Material:

Steel (Q235/Q345)

Size:

D48*3.25mm, etc

Surface:

Electro Galvanized, Hot   Dipped Galvanized, Painted, Powder Coated

Component: 

Standard, Ledger, Diagonal   Brace, Bracket, Base Jack, U Head Jack, Etc.

Application:

Slab Support, Staircase,   Stage Plateforms, Bridge Support, Mobile Tower, etc.

Manufacturer:

OEM is Available

Items or goods can be   manufactured according to your standards.

Advantage

* Good loading capacity

* Easy to assemble and dismantle

* Excellent quality for formwork & scaffolding with wide choices

Other scaffolding & formwork products:

(1)   Scaffolding System

(2)   Scaffolding Frame & Accessories

(3)   Scaffolding Couplers/Clamps

(4)   Formwork System Scaffolding & Accessories

Company introduce and advantages:

1. One of Fortune 500 companies in the world. No. 5 in the building material field.
2. Six Sigma strategy , which means no more than 3.4 defects existing among one million of error
possibilities.
3. In line with the business, we launched E-business platform Okorder.com.
4. We are highly recognized by our business partners and clients all over the world and has obtained rapid
development under the spirit of win-win.

FAQ

Why Us?

We are one of the largest construction materials suppliers in China.

We own professional manufacturers with powerful producing capacity.

Extensive and comprehensive quality control system

Excellent products with competitive prices.

Efficient  services in pre and after sale.

Full energy with affluent experience team. 


Q: I have to write a 1 page commentary on a geographical issue for school, and, I've never done that before.Could someone please tell me or link me to a very simple 'writing commentary' scaffold for beginners?Please?Thankyou :)
A vegan alcoholic! A chuckle emerges, a laugh perhaps for a few more bobs. Absent the mind, nicely put.
Q: what are the scaffolding building on I-44 between milemarker 282 and 283 east bound on the north side of the h
Are you talking about where the trains are? The cylander shaped buildings? They are oil/fuel tanks... they have a big balloon like thing with a weight on top that as it fills will fill out inside the scaffolding. I have not seen them filled in years though.
Q: What are the dangers of scaffolding
Analysis of the types of scaffolding accidents1) the entire frame dumping or local collapse frame2) the whole frame instability and vertical collapse3) personnel from scaffold falling
Q: If you have two workers say standing on a scaffolding, their are downward forces from the weight of the workers along with the weight of the scaffold, and upward forces from tension suspending the scaffolding in place. The opposite forces add to zero and thus the scaffolding remains at rest.My question has to do with what would occur if more/less workers were on the scaffolding. It appears to me that the scaffolding would always remain at rest. Would there always be a ΣF=0 regardless of the amount of workers? As the decreases in weight from removing a worker would also cause the tension force to be weaker? And vice versa if there were more workers?I
You are correct so long as the scaffolding is not allowed to move. I.e. the cables suspending it are locked and not unwinding from their spools as more workers get on. More weight added would necessarily increase the tension in this type of case. However, if, when another worker got on and the tension could not increase for what ever reason, a downward acceleration would take place that is proportional to the worker's weight. Hope that clears things up.
Q: How many time was Hester Prynne on the scaffold? why was she on it each time? What about the time when pearl and dimmesdale was on it with her? HELP!!!
Hester Prynne On The Scaffold
Q: Scaffolding scaffolding erection norms which requirements, who can say?
Scaffolding operators must be qualified through the examination of professional personnel, should be held on the card and do a regular physical examination, the operator must wear a helmet, fasten the seat belt, wear non slipIn the process of using frame control load less than ZkN/mZ2kN/ square meters, the prohibition of arbitrary demolition wall connecting rod and other safety facilitiesEach component and frame tube of the cantilever frame must be transmitted to the ground in timeWhen the shelf is removed, a fence or warning sign should be set up around it, and someone should be assigned to guard itFasteners and steel pipe diameter matching use, and the factory certificate. It is found that there is crack, deformation, the prohibition of the use of silkThe erection of temporary power lines and the grounding of the suspension frame and the lightning protection measures shall be carried out according to the national standards
Q: Scaffold removal should comply with those requirements......
Demolition safety requirementsThe removal order should be 1 layers from the top down, at the same time no homework.2 remove the frame rods and connectors, springboard and other materials, should be used in rolling, prohibited throw down. The foot lever and remove the plate have been demolished, should be disposable.3 all the pieces of the wall should be removed from the scaffold layer by layer, it is strictly forbidden to take the whole or a few layers of the demolition of the wall and then dismantle the scaffolding; the demolition of the height difference should not be greater than two steps, such as the height difference is greater than the two step should be added to strengthen the wall.4 when the scaffolding removed to the lower part of the last long steel pipe height, according to the needs of the site in the appropriate position to take temporary support reinforcement, after the demolition of the wall.
Q: how long should i leave it before i change it, should i do it myself or go to the piercer to they can do it?and is it still normal for the pericing to hurt after quite a while of having it done?
Hi :) You can change it after 4 months usually But sometimes it can take up to a year It depends on the person , everybody's body heals differently You should go back to your piercer and ask if it's healed enough to change the jewellery Yep , it's normal A scaffold piercing goes through the cartilage and cartilage piercings can take up to a year to fully heal :)
Q: Which hurts less, the piercing at the top of the ear, or the piercing from one side of the upper ear to the other?Thanks. =)
The first piercing of the scaffold will feel the same as getting your helix done. The second will hurt a bit more. The healing of a scaffold, however, will probably be more painful than just one helix piercing and will take a bit longer.
Q: i am getting my industrial (scaffold) pierced on one ear and i want my cartilage on the other ear, how long do i have to wait between them? What are pros and cons for industrial (scaffold)? what are risks and stuff and how much is it? i want to get it so any information or anything i should know would be great thanks especially for industrial:)
You can have both done in the same day if you can handle the pain and shock. Get the industrial done first, and if you still feel OK afterwords, you can get your other ear done by the same piercer. Talk to him/her and let them know what you want to do before you start. If you feel like you need to wait after the industrial, wait at least a day before getting the second piercing. It's all about what you can handle.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords