• Ring-lock Scaffolding,Stable,Easy Maintenance,Competitive Prices System 1
  • Ring-lock Scaffolding,Stable,Easy Maintenance,Competitive Prices System 2
Ring-lock Scaffolding,Stable,Easy Maintenance,Competitive Prices

Ring-lock Scaffolding,Stable,Easy Maintenance,Competitive Prices

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
2000 pc
Supply Capability:
3000000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1. Main Description of Ring-lock Scaffolding:

 

  • During construction, scaffolding system and shoring system have great difference in designing and manufacturing, as they have different loading mode and magnitude on the vertical standard. To distinctively use them in the construction can ensure secutity, reduce steel consumption, save assembly & dismantling time and freight cost. 

  • Name: Ring Lock Scaffolding.

  • Category: Scaffolding system.

  • Material: Steel (Q235/Q345).

  • Size: D48.3*500/1000/1500/2000/2500/3000/4000.

  • Surface: Electro Galvanized/Self Color/Painted/HDG.

  • Component: Standard, base collar, ledger, diagonal brace end, ledger end, ring, connector, guard rail, etc.

  • Application: Highways/Subways, Bridges, Tunnels and Fire Electrical Engineering, Marine Engineering.

  • Advantage:  Durable, Stable, Skid-proof, Antirust, Easy to assemble & Dismantle.

  • Components: Ring-Lock Standard With Spigot, Ring-Lock Ledger, Ring-Lock Diagonal, Wedge Pin, Base Collar, Steel Plank, Steel Stair Case.

 

 

2. Main Futures of Ring-lock Scaffolding

 

  • Standard:  Made of 48mm O.D. x 3.2mm thickness high grade steel tube, 1 discal leg 0.5meter, Length: 3000, 2500, 2000, 1500, 1000,  500mm etc.

  • Ledger: Made of 48mm O.D. x 3.2mm thickness high grade steel tube, length800mm/ 1500mm, length can be ordered.

  • Ring: Made from cast-steel or pressed steel.

  • Ledger connection-peg: made from cast-steel.

  • Base screw jack: length 600mmx3.5mm thickness strength tube, length to be order, solid tube available.

  • U head screw jack: length 600mmx3.5mm thickness strength tube with U head plate, length can to be order, solid tube available.

  • Surface: painted/electro (hot dipped) galvanized or to be order.

  • Also can be customized.

 

3. Detailed Pictures about Ring-lock Scaffolding

 

 Ring-lock Scaffolding,Stable,Easy Maintenance,Competitive Prices

 

Ring-lock Scaffolding,Stable,Easy Maintenance,Competitive Prices

 

 

4. FAQ

 

1) What can we do for you? 

    .We can ensure the quality of the Timber Beam Wall Formwork and avoid extra expenses for customers.    

    .We can provide you the professional technical team.    

    .We can provide professional building proposal for your projects.        

 

2) What promises can be done by us?

   . If interested in this kind of formwork, please feel free to write us for any QUOTE.

   . If need any technical and building assistance, we could provide on-site professional staff for instruction.

   . Please DO check goods when courier knocks your door and contact us asap if any issueS.

 

3) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

 4) What about the package and shipping time?

    .Packing: wood package and adhesive tape

    .Shipping: by sea

     Shipping time: Normally small orders, it just1week business days to arrive your hand; When comes to the customs declaration, it may need 2weeks.

Q:Mine has passed the healing date and i have had another one put in it's been over 2 months since i had it done...but there is still some swelling on the top half of the ear that is pierced...will it go down eventually or is there something wrong with it?
it will eventually go down. industrials can take up to a year to heal. don't worry about it.
Q:I got mine done this morning, and like the dumba** I am, I got it on the side that I sleep on. A friend of mine said she slept on hers the first night and didn't hurt and it was fine, but I don't believe that to be true. If I have to sleep on my other side, I could but it's very hard for me to fall asleep like that, and I often switch positions while asleep unconsciously. Any tips?
Mine was too painful when I got the industrial done to sleep on the same side. I took a blanket, rolled it up, and placed it at my back so it would deter me from rolling over onto it. After about a week I was good to go on sleeping on that side. However, it#x27;s been two years and sometimes it gets too sore to sleep on the side with the industrial. I have definitely learned that it will always be sore if I constantly sleep on the same side every night instead of rotating sides. I learned the hard way about 2 weeks ago when I got the opposite side pierced at the rook. Good luck!
Q:I need to rent a scaffle that is motorized so I can reach up to 16 ft
your best thing to do is to look up in the phone book or Internet. there are lots of different companies that rent out lifts. Depending on where you live. I know of a few nationwide ones, Hertz for one. Just call the company and tell them you need a lift. if the work is to be done outside I would use a small boom lift, but if it needs to be done inside just a regular platform lift should do the job. they also come in gas, and electric but being that you only need one to reach 16 ft. you probably only need an electric, just be sure to charge it over night when you are not using it! You will probably have to make a credit card deposit also.
Q:What are the requirements for the erection of the bowl - shaped steel tube scaffold
Span and step distance is in accordance with the relevant regulations; the top of the free end is more than the specifications is not greater than 50cm, and free from backwater not greater than 30cm;
Q:What is the significance of the three scaffold scenes in the Scarlet Letter?
Scaffold Scarlet Letter
Q:I'm asking this in favour of my friend who currently has no internet.She had her scaffold piercing done about 2 days ago and today it got knocked and started bleeding. It's been bleeding for about 3 hours now and she's worried about it.
First you gotta stop touching it, that's probably causing the irratation, hence bleeding. IT'll take time to heal, just leave it alone clean out the blood every hour or so, BE CAREFUL! and LEAVE IT IN!
Q:I recently had a scaffold piercing. It seems to be healing well, however it is still sore.My body tends to reject piercings, so is there anything I can do to help it heal?I am currently using saline solution taking vitamins.
your body wont reject it cuz its cartilage and it wont reject. its just sore becuase you just go a while ago so it will hurt of a couple of weeks
Q:Scaffolding plug (90, outside the 400), this is what ah? How to use ah?,
Bowl buckle scaffold, called bowl buckle frameThe bowl buckle frame is composed of a steel pipe vertical rod, a cross bar and a bowl buckle joint
Q:And how long do you have to keep it on? Any other knowledge I should know?
8 - 16 weeks - healing time. But with some people it can be alot longer! Clean 3 - 4 times a day. Try cleaning with a mix of tea tree oil and water! It doesn't hurt much :)
Q:The main load-bearing structure of the bridge is a hole L0=36 m reinforced concrete arch, with a total width of 3.4 meters, the highest to the lowest level of 17 meters, the use of bowl buckle scaffolding, scaffolding longitudinal 0.6m, transverse 0.9m, step 1.2m. Help me to calculate the bearing capacity of ah thank you!
Fulcrum spacing is 60cm longitudinal timbers, fulcrum M, square distance is W then according to uniform load distribution Q=p/wThen according to the number of cross W-1 span continuous beams with calculated Pmax and MmaxIn the calculation of I, W, E the final Mmax/W< limit stress but also to calculate the degree of winding </1400L (I value according to the size of the calculation, i=bh^2/6)The first layer of wood even finished the calculationThen go down and check it outThe second layer is the fulcrum of wood 90cm

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords