PT5210 5T tower crane with CE ISO certificate

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
100 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Descriptions of our tower crane:

1, PT5210 have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.5m to 52m, PT5210 tower cranes are famous for their large operating ranges, varied working methods and wide uses.  

2,This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.

3, It is original in design, reliable in operation and satisfactory in shape.

4,Equipped with all necessary safety devices, these cranes show a good speed-control capacity,, satisfactory operating stability and high work efficiency.

5,They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys. Best after sales service will be offered which will get rid of all your worries in the purchase of our products

Advantage of our tower crane:

1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, suitable for the group of tower cross homework.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Specification of our tower crane:

PT5210  5T tower crane with CE ISO certificate

PT5210  5T tower crane with CE ISO certificate

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How long would it take to make 1,000,000 paper cranes if making one takes 7 min & 11 sec?
If it takes 7*60 + 11 = 431 seconds to make 1 crane, then making one million would take 431,000,000 seconds. There are 3600s*24hr*365.25d = 31,557,600 seconds in an average year. Dividing 431 million by this gives a little over 13 years, with a remainder of 20,751,200 seconds. There are 3600*24*30 = 2,592,000 seconds in an average month. So that gives 8 months with a remainder of 15,200 seconds. There are 3600 seconds in an hour, so that gives 4 hours plus 800 seconds. The 800 seconds = 60*13 + 20 = 13 minutes, 20 seconds. This works out to 13 years, 8 months, 4 hours, 13 minutes, and 20 seconds. Though answers can vary depending on how many days you define to be in a year, and how many days in a month.
Q:What parameters are lifting machines called large equipment? 200
General purpose gantry cranes: MG, 440t, MG, 360t, MG, 450t, Me, 360t, ME, 900tGeneral purpose bridge crane: QD, 350t, QD, 400t, QD, 450t, QD, 390t, QD, 330t, QE, 350t, QE, 330tThe above tonnage is now recognized as a large lifting machinery.Hoisting machinery refers to the lifting of heavy objects with hooks or other lifting devices, and mechanical operations such as lifting and moving in space. There are many classifications of cranes, such as cranes, cranes, cranes, cars and so on. They are commonly referred to as one or more kinds of cranes.
Q:how do they get the construction crane onto the the tall buildings?
If the crane has a mountaineering physique it is going to diminish itself down, removing its very own tower sections till it somewhat is low adequate to be bumped off by potential of a cellular crane. If it doesnt a smaller crane stated as a derreck crane would be set up on the roof of the development, it is going to take the tower crane dowm, as quickly because it somewhat is bumped off the derreck crane is disassembled and taked down by potential of the homes raise
Q:Hunger Games Movie Spoiler! (question about Seneca Crane aka Gamemaker)?
Yeah, basically President Snow has him killed. The berries represent this. The whole point is he goes into the room, sees the berries and knows he is being killed for allowing Katniss and Peeta to use those berries to cheat the system.
Q:what is the overhead bridge crane?
www.okorder.com
Q:How To Make Origami Crane?
You okorder.com and see how to make origami crane step by step
Q:carribean crane jobs?
try okorder.com you can post your job there. Hope this help you out
Q:How do Crane Motors Work?
I'm not 100% familiar with this but this should be pretty close to the answer. Simple/standard crane motors work by applying power first through a rotating steel shaft into a gearbox. The gearbox allows the gearing ratio to be changed (to trade rotation speed for torque or torque for rotation speed). Another steel shaft carries the power out of the gearbox, again through rotation, to a spindle (think big thimble) around which steel cable is wrapped.
Q:Reaction to Sadako and the Thousand Paper Cranes?
Sniff Sniff. 'tears rolling down my cheaks.
Q:How does a person go about becoming a Gantry Crane Operator? And what is it like?
First you need an opportunity to operate a Gantry Crane, then you will to to get a crane operator license. Finally, you need to find a company who needs a Gantry Crane operator, but if you have located the first step, then you have found someone.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range