• PIR Pre-insulated Ducting Aluminium Flexible Ducts System 1
  • PIR Pre-insulated Ducting Aluminium Flexible Ducts System 2
  • PIR Pre-insulated Ducting Aluminium Flexible Ducts System 3
PIR Pre-insulated Ducting Aluminium Flexible Ducts

PIR Pre-insulated Ducting Aluminium Flexible Ducts

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
500 PCS
Supply Capability:
50000 PCS/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Product Description:

Features and Characters of aluminium flexible ducting:

1)Non-insulated and insulated Flexible Duct offered  2) Up to 150 and 250 Max. temperature   3) Fire retardant   4) OEM&ODM service offered

Introduction of aluminium flexible ducting:

Flexible Duct is widely used in Heating, Ventilation and Air Conditioning (HVAC) systems for air ventilation applications. Flexible Duct provides greater thermal efficiency to save energy. The product is also covered in a heavy duty, silver jacket for durability. The vapor barrier prevents condensation forming on the outside of ducts carrying air. Because it is flexible, it is easy to run around and through obstacles in the building.

1)     Non-insulated Flexible Duct Structure: Two-layer aluminum foils +1 layer of PET film.

2)     Insulated Flexible Duct: Structure: 1 layer of Alu. Foil+1 layer PET film+ glass wool, Outer jacket: 1 layer of Aluminium foil   Glass Wool Density: 16kg/m3; Thickness: 25mm

3)     Combined flexible Duct

Pictures of aluminium flexible ducting:

PIR Pre-insulated Ducting Aluminium Flexible Ducts

PIR Pre-insulated Ducting Aluminium Flexible Ducts

FAQ of  aluminium flexible ducting:

1.      What temperature maximum? Our products: 150 and 250

2.      What MOQ? Our MOQ: 500 pcs

3.      What payment terms? We accept T/T and L/C

4.      What lead time: 10 days

 

 

 

 

Q:I added the space 18 degrees opened for 5 hours or not cold, we all know how is it? More
The general level of more than 12 layers when you need to use.
Q:The installation method of ordinary air conditioner. The more detailed the better. Please thank you all
The basic operation of the same, but the different requirements of different professional, or to determine the direction of good, and then hands.
Q:HVAC Heating: What are the main components of the air distribution system?
Geothermal construction, the heating pipe spacing can not be less than 100mm, the construction can not be achieved, big brother!
Q:Do 3cm thick wall insulation how much kilogram of slurry and how many kilograms of polystyrene particles
You are talking about the construction measures it is not the house measures it, because the house has a construction of Huohuohuohuo number of leather and bronze sculpture drawings and specifications, high-rise building scaffolding should be lightning protection measures, that is, under the scaffolding around Reliable grounding (not less than four times, not less than 16 square copper core BV line), if it is pick plus, and the house can be connected to the pressure ring. Tower crane I will not say, upstairs has been said.
Q:Air conditioning ventilation when the sound is a big reason
According to my specific circumstances, in the following seven major hazards include the division, sub-project focus on control
Q:US direct mail dysonhp01 Dyson air purification cooling machine triple in the country to warranty it
Embedded stove, such as the use of rubber tube connection, then the rubber tube in the platen, often subject to heat radiation easily aging; and aging, falling more difficult to find, so many local poisoning and other vicious accidents
Q:Ventilation is very good, why still have to install fresh air system
You are a single raft toilet wipes Pie Tanzhuang open card would like to confirm what? Contract notarization or. The The If it is contract notarized, generally notary value of 0.25% -0.3%
Q:If I feel the room cool off, one hour hot and open an hour this will be more expensive? More
But after all, is the master you want to Zhuo good jade is certainly a lot of difficulties, whether it is Longfeng Pei or other subject matter need a lot of effort in addition to the need for technical research also need to continue to learn theoretical knowledge, especially
Q:What is the whole heat exchange fresh air ventilator?
(GJG130 - Fan Jutang Duanjie Daojie Juejiao 2001) will be replaced by (GJG130-2011) is expected to begin the implementation of the construction of this year, the construction of fastener steel scaffolding safety technical specifications (GJG130), the construction of fastening steel pipe scaffolding safety technical specifications (GJG130- -2011)
Q:Air to water heater host and air conditioning host is not the same
You can try asphalt! Is the kind of paving the way! Very useful!

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords