Phenolic HVAC air duct board
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 80000 m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Description:
The Lusty Phenolic Foam Preinsulated Duct panel system is the most advanced and inovative energy saving system of centre air-conditioning ductwork available worldwide. The Ductwork is fabricated by using rigid phenolic insulation panels in length of 4m and provide the optimum energy saving and environmental solution in comparison with other types of ductwork. The system consists of Phenolic Pre-insulated Duct Panels, fabrication methods, jointing systems and a complete line of accessories to complete a system.
The Lusty ® Phenolic Foam Preinsulated Duct System is the recoganized leader in new generation pre-insulated ductwork. It offers the triple benefits to cut down the energy, carbon and cost whilst already having proved itself in its highly competitive marketplace. Being based on a phenolic resin it has outstanding fire resistance characteristics and extremely low smoke emission when expose to a flame source.
Parameters:
Item | Unit | Specification |
Panel Structure | Alu./Foam/Galvanized sheet | |
Standard Panel Size | mm | 3950*1200*20 |
Alu. Foil / Galvanized sheet Thickness | mm | 0.04/0.17 |
Foam Density | kg/m3 | 40 |
Thermal Conductivity | w/m.k | 0.02 |
Compressing Strength | Mpa | 0.25 |
Bending Strength | Mpa | 1.2 |
Combustibility Property | Class 0 (BS476 Part 6 & 7) | |
Water Absorption | % | 1.9 |
Max Smoke Density | % | 2 |
Dimension Change | % | 0.3 |
Ambent Temperature | °C | -250- +150 |
Maximum Allowable Wind Velocity | m/s | ≤12 |
Continuous Running Maximum Temperature | °C | ≤70 |
Advantages:
Compared to traditional insulated Sheet Metal Ductwork:
Do it in one time, no lag insulation required, save the labor and cost.
Save the buiding space due to good insulation function
Lightweight, decrease the total weight of building
Decrease air leakage by using flange joint
Low thermal conductivity, no condensation, energy saving
Closed cell foam, good acoustic insulation
Fire-resistance, no smoke when expose to fire
Faced with aluminum foil, it’s water proof and anti-microbial
CFC and HCFC free, environment friendly
Applications:
- Q: Air to water heater host and air conditioning host is not the same
- This test with a small sample length 127mm, width 12.7mm, the maximum thickness of 3.2mm. In the absence of ventilation test chamber. The top of the specimen (6.4 mm place) is clamped with a clamp on the bracket and the longitudinal axis of the specimen is kept vertical. The lower end of the specimen is 9.5mm from the lamp tip and 305mm from the dry absorbent cotton surface. Bring the Bunsen burner and adjust it to produce a blue flame with a height of 19mm. Place the Bunsen Lights flame at the bottom of the sample for 10s, then remove the flame (at least 152mm away from the specimen) and write down the sample. Burning time. If the flame of the sample within 30s after removal of the flame is extinguished, the original lamp must be moved under the specimen again, re-ignite the sample for 10s, and then remove the Bunsen burner again and note the flame burning And flames burning the burning time. If the sample droplets drip, let it fall into the sample under the 305mm cotton, to see whether it ignited cotton. If the absorbent cotton is on fire, the rating should be taken into account. Specific grading indicators are as follows. Test Item 94V-094V-194V-21 Ten-time ignition Total flame burning time Maximum value (S) Individual flame burning time Maximum value (s) Flameless burning time (s) Yes Flame drop No No Allow only short time Burning general UL yellow card on the thickness of the test strip is divided into: 1/8 inch, 1/16 inch, 1/32 inch thickness, that is, 3.2mm, 1.6mm, 0.8mm three grades test.
- Q: Gree air conditioning 50 heating and cooling mechanism heat when the host cooling network is how the matter
- Not the ,,, mobile air conditioning inside the compressor, the winter heating also need the compressor, but also a ventilation pipe, charged heating Well?
- Q: Do 3cm thick wall insulation how much kilogram of slurry and how many kilograms of polystyrene particles
- You are talking about the construction measures it is not the house measures it, because the house has a construction of Huohuohuohuo number of leather and bronze sculpture drawings and specifications, high-rise building scaffolding should be lightning protection measures, that is, under the scaffolding around Reliable grounding (not less than four times, not less than 16 square copper core BV line), if it is pick plus, and the house can be connected to the pressure ring. Tower crane I will not say, upstairs has been said.
- Q: Air conditioning machine work when the sound is too much reason
- Many of the good quality of the model, of course, bear some of the larger. Common scaffolding brackets are U-type care, "construction fastener steel scaffold safety technical regulations" (JGJ130-2011) provides "adjustable support bearing capacity design value should not be less than 40kN, support plate thickness should not be less than 5mm ", the general calculation using 30kN. Not to say how fast buckle steel scaffold can bear the load, but according to how much load to calculate how scaffolding erection. Need to be calculated. In the "construction of fasteners steel scaffold safety technical specifications" provides instructions. Double fastener (anti - skid) bearing capacity design value 3.2KN. Right angle fastener, rotary fastener (anti-skid) bearing capacity design value 8KN.
- Q: What is the whole heat exchange fresh air ventilator?
- Depends on the main control panel is not cold and warm, single cold common motherboard. Only a generic motherboard can be changed. In the single cold air-conditioning on the outdoor machine to install the appropriate specifications of the four-way valve, adjust the amount of refrigerant to the appropriate level can be.
- Q: External wall insulation method of operation There are several combinations of materials
- Seeking the existing building construction specifications Daquan! The The @
- Q: The installation method of ordinary air conditioner. The more detailed the better. Please thank you all
- 2.1.23 step distance liftheight the distance between the upper and lower horizontal axis of the axis of each other. 2.1.24 pole vertical (cross) distance longitudinal spacingofuprighttube Scaffolding vertical distance between adjacent rods. 2.1.25 Vertical distance transversespacingofuprighttube Scaffolding Horizontal distance between adjacent vertical rods, single row scaffolding for the outside pole axis to the wall distance.
- Q: Ventilation is very good, why still have to install fresh air system
- Also known as foam board, EPS board, is containing volatile liquid blowing agent of the polystyrene beads can be preheated by heating, heated in the mold and the formation of white objects
- Q: In the design, the building structure and the hydropower are generally designed by the Architectural Design Institute. The air conditioning ventilation is based on the design of the room. Or first air conditioning ventilation? More
- Decoration refers to the home improvement part, housing construction is the content of the building
- Q: HVAC Heating: What are the main components of the air distribution system?
- (HS Code) Yes, the tax rebate is 13% (April . 2009 latest data). Floor of the board of the tax number is, the tax rebate is 9% (June . 2009 the latest data), floor board is the inspection of goods, exports need to be checked. There is nothing to understand where to add me MSN:
Send your message to us
Phenolic HVAC air duct board
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 80000 m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords