• Underground GRP engineering pipe System 1
  • Underground GRP engineering pipe System 2
  • Underground GRP engineering pipe System 3
Underground GRP engineering pipe

Underground GRP engineering pipe

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Underground GRP pipe/ FRP pipe

FRP winding pipe characteristics

1. Good physical mechanics performance

2. Being resistant to chemical erosion and longer service life

3. Excellent hydraulic characteristics

4. Lower installation and keeping cost

5. Flexible design and shorter reform term

6. No medium pollution

FRP pipe classification by application field

1.Chemical medium transportation pipe

2.Various producing process pipe (chemical process, paper making process, polluted water treatment process, sea water purifying process, food and drink producing process, and medicine producing process)

3.Pressure pipe for small hydroelectric power station on the ground and cycling pipe for power plant

4.Polluted water collecting and transporting pipe

5.Drink water transporting main line and tubing pipe

6.Oil field water injecting pipe and oil transporting pipe

7.Heat transporting pipe and sea water transporting pipe

8.Agricultural irrigation pipe

9.FRP set (ventilation, air-conditioner, chimney, cleaner) and piping

10.Gas drainage pipe for mine

FRP pipe classification by pressure in working state

1.Medium and low pressure pipe 0.6MPa2.5 MPa

2.High pressure pipe5.5MPa24 MPa

3.Mobile gravity pipe (which can be used when the pressure is under 0.6MPa)

4.Vacuum tube, external pressure pipe or siphon

If you have interest in the FRP pipe, please provide the following parameters: media, pressure and the use of the environment (overhead or buried), temperature, stiffness requirements, connections, we shall provide you most competitive price. Looking forward to our cooperation!


Q:What is the whole heat exchange fresh air ventilator?
(GJG130 - Fan Jutang Duanjie Daojie Juejiao 2001) will be replaced by (GJG130-2011) is expected to begin the implementation of the construction of this year, the construction of fastener steel scaffolding safety technical specifications (GJG130), the construction of fastening steel pipe scaffolding safety technical specifications (GJG130- -2011)
Q:In the design, the building structure and the hydropower are generally designed by the Architectural Design Institute. The air conditioning ventilation is based on the design of the room. Or first air conditioning ventilation? More
Normal heat absorption is also due to poor ventilation (dirty) and air humidity so icing
Q:HVAC Heating: What are the main components of the air distribution system?
The reasons are the following: 1. Household electricity is not enough, can not start the compressor, so in the heating state can only be ventilated state, cooling the state directly jump electricity; 2. See if you are reported failure, Code to determine the need for on-site inspection in order to know the specific situation; 3. Four-way valve should be no problem, do not just believe that this is the problem Oh; help your words to adopt
Q:US direct mail dysonhp01 Dyson air purification cooling machine triple in the country to warranty it
Among them, the extruded polystyrene gypsum composite board is based on paper gypsum substrate, the use of adhesive and extruded polystyrene board through the factory processing compound
Q:Do 3cm thick wall insulation how much kilogram of slurry and how many kilograms of polystyrene particles
From the outside: ① rigid waterproof casing is only composed of steel casing and wing ring, simple structure; ② flexible waterproof casing mainly by: flange casing, seals, flange pressure plate, wing ring, bolts, nuts Composition, complex structure From the waterproof performance up to choose: ① rigid waterproof casing is outside the wing (ring made of steel ring on the steel pipe), installed in the wall (mostly concrete wall), for the general pipe wall, ; ② flexible waterproof casing in addition to the external wing ring, the internal file ring and the like, the flange wire, there are sets of sales, but also their own processing, for the need for shock absorption pipeline, such as and pump connected When the pipe is through the wall In other words, if the wall on both sides of the waterproof performance, it is necessary to use flexible waterproof casing; if only to consider the pipe through the wall, without considering the wall, the wall on both sides of the waterproof performance and displacement of the pipeline deformation You can use rigid waterproof casing
Q:Gree air conditioning 50 heating and cooling mechanism heat when the host cooling network is how the matter
Not the ,,, mobile air conditioning inside the compressor, the winter heating also need the compressor, but also a ventilation pipe, charged heating Well?
Q:Ventilation is very good, why still have to install fresh air system
You are a single raft toilet wipes Pie Tanzhuang open card would like to confirm what? Contract notarization or. The The If it is contract notarized, generally notary value of 0.25% -0.3%
Q:External wall insulation method of operation There are several combinations of materials
30-150 per square meter has, mainly to see the material, thickness and so on
Q:The installation method of ordinary air conditioner. The more detailed the better. Please thank you all
2.1.23 step distance liftheight the distance between the upper and lower horizontal axis of the axis of each other. 2.1.24 pole vertical (cross) distance longitudinal spacingofuprighttube Scaffolding vertical distance between adjacent rods. 2.1.25 Vertical distance transversespacingofuprighttube Scaffolding Horizontal distance between adjacent vertical rods, single row scaffolding for the outside pole axis to the wall distance.
Q:Air conditioning ventilation when the sound is a big reason
No matter, it is best to cut the distance between the material and the roof, like an arbor. Otherwise it is not foam board with it

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords