Underground GRP engineering pipe DN300

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Underground GRP pipe/ FRP pipe

FRP winding pipe characteristics

1. Good physical mechanics performance

2. Being resistant to chemical erosion and longer service life

3. Excellent hydraulic characteristics

4. Lower installation and keeping cost

5. Flexible design and shorter reform term

6. No medium pollution

FRP pipe classification by application field

1.Chemical medium transportation pipe

2.Various producing process pipe (chemical process, paper making process, polluted water treatment process, sea water purifying process, food and drink producing process, and medicine producing process)

3.Pressure pipe for small hydroelectric power station on the ground and cycling pipe for power plant

4.Polluted water collecting and transporting pipe

5.Drink water transporting main line and tubing pipe

6.Oil field water injecting pipe and oil transporting pipe

7.Heat transporting pipe and sea water transporting pipe

8.Agricultural irrigation pipe

9.FRP set (ventilation, air-conditioner, chimney, cleaner) and piping

10.Gas drainage pipe for mine

FRP pipe classification by pressure in working state

1.Medium and low pressure pipe 0.6MPa2.5 MPa

2.High pressure pipe5.5MPa24 MPa

3.Mobile gravity pipe (which can be used when the pressure is under 0.6MPa)

4.Vacuum tube, external pressure pipe or siphon

If you have interest in the FRP pipe, please provide the following parameters: media, pressure and the use of the environment (overhead or buried), temperature, stiffness requirements, connections, we shall provide you most competitive price. Looking forward to our cooperation!


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:External wall insulation method of operation There are several combinations of materials
30-150 per square meter has, mainly to see the material, thickness and so on
Q:Space blowing wind is not cold how is it?
The general level of more than 12 layers when you need to use.
Q:Ventilation is very good, why still have to install fresh air system
Also known as foam board, EPS board, is containing volatile liquid blowing agent of the polystyrene beads can be preheated by heating, heated in the mold and the formation of white objects
Q:Air conditioning ventilation when the sound is a big reason
According to my specific circumstances, in the following seven major hazards include the division, sub-project focus on control
Q:The installation method of ordinary air conditioner. The more detailed the better. Please thank you all
The basic operation of the same, but the different requirements of different professional, or to determine the direction of good, and then hands.
Q:HVAC Heating: What are the main components of the air distribution system?
The reasons are the following: 1. Household electricity is not enough, can not start the compressor, so in the heating state can only be ventilated state, cooling the state directly jump electricity; 2. See if you are reported failure, Code to determine the need for on-site inspection in order to know the specific situation; 3. Four-way valve should be no problem, do not just believe that this is the problem Oh; help your words to adopt
Q:Public building design, the building structure and water is generally designed by the Architectural Design Institute, air conditioning and ventilation is based on the design of the interior? Or first air conditioning ventilation?
Decoration refers to the home improvement part, housing construction is the content of the building
Q:Air conditioning machine work when the sound is too much reason
This is based on the density of benzene board decision, not what you said, know it buddy.
Q:Do 3cm thick wall insulation how much kilogram of slurry and how many kilograms of polystyrene particles
You are talking about the construction measures it is not the house measures it, because the house has a construction of Huohuohuohuo number of leather and bronze sculpture drawings and specifications, high-rise building scaffolding should be lightning protection measures, that is, under the scaffolding around Reliable grounding (not less than four times, not less than 16 square copper core BV line), if it is pick plus, and the house can be connected to the pressure ring. Tower crane I will not say, upstairs has been said.
Q:Single cold air conditioning function can not change the cold and warm?
Air conditioning heating than the cooling power consumption, power consumption and ambient temperature and set the temperature has a great relationship, the general cooling 1 hour 1-2 degrees, heating if the auxiliary heating about 2-3 degrees. If you want to save the appropriate temperature can be set higher, the general and the ambient temperature difference of about 5 degrees people feel more comfortable, shut off undesirable, not reach the purpose of saving.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range