air diffuser factory
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Square Ceiling Diffusers
Description:
Square Ceiling Diffusers are designed to provide excellent directional performance typically in a 4 way airfow pattern.
The Louvre Face Diffuser is generally flush mounted to the ceiling line. This frame style is extremely versatile and is ideal for a lay-in application where the diffuser is placed into a T-Bar ceiling grid. The Louvre Face Diffuser may be used in place of a modular ceiling tile without any need arising to alter the T-bar construction.
It is easy for installation with its removeble core.
Ceiling diffusers blend seamlessly into modern office and commercial building ceilings.
Features:
Materials: Aluminium
Construction; Frames have punched in corner, in addition to welded joints.
Welded blade cores.
Aluminium tube supports blade cores inside frame.
Core: Removable with safety cord/ chain under
Color: Standard- RAL 9010 RAL9016 or Anodized
Opposite Blade Damper Optional
Standard Size:
Neck Size 145*145 Face Size 295*295 Height 51.2
Neck Size 220*220 Face Size 370*370 Height 51.2
Neck Size 295*295 Face Size 445*445 Height 51.2
Neck Size 370*370 Face Size 520*520 Height 51.2
Neck Size 445*445 Face Size 595*595 Height 51.2
- Q:What is the whole heat exchange fresh air ventilator?
- (GJG130 - Fan Jutang Duanjie Daojie Juejiao 2001) will be replaced by (GJG130-2011) is expected to begin the implementation of the construction of this year, the construction of fastener steel scaffolding safety technical specifications (GJG130), the construction of fastening steel pipe scaffolding safety technical specifications (GJG130- -2011)
- Q:In the design, the building structure and the hydropower are generally designed by the Architectural Design Institute. The air conditioning ventilation is based on the design of the room. Or first air conditioning ventilation? More
- Aluminum alloy metal shell better than the plastic shell; we all know that most of the market is now charging the lithium battery, lithium battery is the only drawback is the possibility of a long time with the explosion, so the use of aluminum Alloy shell, much better than steel; polymer battery is good, but the price is expensive,
- Q:Air to water heater host and air conditioning host is not the same
- This test with a small sample length 127mm, width 12.7mm, the maximum thickness of 3.2mm. In the absence of ventilation test chamber. The top of the specimen (6.4 mm place) is clamped with a clamp on the bracket and the longitudinal axis of the specimen is kept vertical. The lower end of the specimen is 9.5mm from the lamp tip and 305mm from the dry absorbent cotton surface. Bring the Bunsen burner and adjust it to produce a blue flame with a height of 19mm. Place the Bunsen Lights flame at the bottom of the sample for 10s, then remove the flame (at least 152mm away from the specimen) and write down the sample. Burning time. If the flame of the sample within 30s after removal of the flame is extinguished, the original lamp must be moved under the specimen again, re-ignite the sample for 10s, and then remove the Bunsen burner again and note the flame burning And flames burning the burning time. If the sample droplets drip, let it fall into the sample under the 305mm cotton, to see whether it ignited cotton. If the absorbent cotton is on fire, the rating should be taken into account. Specific grading indicators are as follows. Test Item 94V-094V-194V-21 Ten-time ignition Total flame burning time Maximum value (S) Individual flame burning time Maximum value (s) Flameless burning time (s) Yes Flame drop No No Allow only short time Burning general UL yellow card on the thickness of the test strip is divided into: 1/8 inch, 1/16 inch, 1/32 inch thickness, that is, 3.2mm, 1.6mm, 0.8mm three grades test.
- Q:HVAC Heating: What are the main components of the air distribution system?
- Geothermal construction, the heating pipe spacing can not be less than 100mm, the construction can not be achieved, big brother!
- Q:US direct mail dysonhp01 Dyson air purification cooling machine triple in the country to warranty it
- Embedded stove, such as the use of rubber tube connection, then the rubber tube in the platen, often subject to heat radiation easily aging; and aging, falling more difficult to find, so many local poisoning and other vicious accidents
- Q:Do 3cm thick wall insulation how much kilogram of slurry and how many kilograms of polystyrene particles
- Of course, is heating electricity. Heating has auxiliary electric heating, so electricity and electricity. Frequently open the fee, the air compressor is not good. 2 machine cooling power is 1700 watts, 1 hour is 1.7 degrees electricity. Heating with auxiliary electric heating power of 1500 watts, 1 hour is 3.2 degrees electricity.
- Q:If I feel the room cool off, one hour hot and open an hour this will be more expensive? More
- After learning that feel boring, to diverted it, brush point repair it. Architectural design institute will need to design equipment (that is, plumbing) design talent, that is, will generally participate in architectural design, the wages should be
- Q:External wall insulation method of operation There are several combinations of materials
- Seeking the existing building construction specifications Daquan! The The @
- Q:The installation method of ordinary air conditioner. The more detailed the better. Please thank you all
- 2.1.23 step distance liftheight the distance between the upper and lower horizontal axis of the axis of each other. 2.1.24 pole vertical (cross) distance longitudinal spacingofuprighttube Scaffolding vertical distance between adjacent rods. 2.1.25 Vertical distance transversespacingofuprighttube Scaffolding Horizontal distance between adjacent vertical rods, single row scaffolding for the outside pole axis to the wall distance.
- Q:Air conditioning ventilation when the sound is a big reason
- According to my specific circumstances, in the following seven major hazards include the division, sub-project focus on control
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
air diffuser factory
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords