Uninsulated Aluminum Flexible Duct
- Loading Port:
- Guangzhou
- Payment Terms:
- TT or LC
- Min Order Qty:
- -
- Supply Capability:
- 200000 m/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Ventilated Flexible Duct For HVAC For Ventilation & Refrigeration
1.Structure of Aluminum Flexible Duct for Ventilation & Refrigeration:
Aluminum Flexible Duct is widely used in Heating, Cooling, and Air Conditioning (HVAC) systems for air ventilation applications. Flexible Duct provides greater thermal efficiency to save energy. Because it is flexible, it is easy to run around and through obstacles in the building.
Flexible Duct Usage:
1. Ventilation system, Extraction of solvents, Extraction of corrosive gas and fumes
2. Low pressure application, Transfer of hot and cold air, Air conditioning
3. Vehicle construction, Engine construction, Exhaust fumes extraction
2.Main Features of Aluminum Flexible Duct for Ventilation & Refrigeration:
1. It's a range of fully flexible un-insulated aluminum PVC laminated ducting, it is easy to connect to ducting
2. Highly flexible
3. Excellent resistance to chemicals
4. Small bending radius
3. Aluminum Flexible Duct for Ventilation & Refrigeration Images
4. Aluminum Flexible Duct for Ventilation & Refrigeration Specification
PROPERTIES | VALUE |
DIARANGEMETER | 80~1200MM(3”~48’’) |
TEMPERATURE RANGE | -30~+250℃ |
VELOCITY OF AIR FLOW (MAX) | 20 m/s |
WORKING PRESSURE | 2500 Pa |
BENDING RADIUS | 0.54*D |
STANDARD LENGTH | 7.6M OR 10M |
5.FAQ
We have organized several common questions for our clients,may help you sincerely:
①What’s the Application for the products?
Flexible Duct is widely used in Heating, Cooling, and Air Conditioning (HVAC) systems for air ventilation applications. Flexible Duct provides greater thermal efficiency to save energy. Because it is flexible,it is easy to run around and through obstacles in the building.
② What’s the Advantages for the products?
No need special tools for cutting
In case of fire no toxic gas are emitted
The product have been successfully tested for fire resistance
Can be bent in any direction
③ How long can we receive the product after purchase?
In the purchase of product within two working days, We will arrange the factory delivery as soon as possible. The specific time of receiving is related to the state and position of customers. Commonly 7 to 10 working days can be served.
- Q: Such as the problem, and now air-conditioning technology is mature, the market a lot of air conditioning are cold and warm, and I would like to be able to put my home that the end of the century loaded Mitsubishi air conditioning (split single cold) into a cold Before the conversion of ordinary TV to the remote control, that air conditioning can be modified? How much does it cost? Where is this technology? More
- External wall insulation should pay attention to what the details?
- Q: If I feel the room cool off, one hour hot and open an hour this will be more expensive? More
- Common scaffold brace is the U-type care, "construction of fasteners steel scaffolding safety technical regulations" (JGJ Gong Gong Duo Ji-tao pan Revenge two 130-2011) provides "adjustable support bearing capacity design value is not Should be less than 40kN, the support plate thickness should not be less than 5mm ", the general calculation using 30kN.
- Q: Air to water heater host and air conditioning host is not the same
- You can try asphalt! Is the kind of paving the way! Very useful!
- Q: Air conditioning ventilation when the sound is a big reason
- No matter, it is best to cut the distance between the material and the roof, like an arbor. Otherwise it is not foam board with it
- Q: I added the space 18 degrees opened for 5 hours or not cold, we all know how is it? More
- The general level of more than 12 layers when you need to use.
- Q: Air conditioning machine work when the sound is too much reason
- This is based on the density of benzene board decision, not what you said, know it buddy.
- Q: What is the whole heat exchange fresh air ventilator?
- (GJG130 - Fan Jutang Duanjie Daojie Juejiao 2001) will be replaced by (GJG130-2011) is expected to begin the implementation of the construction of this year, the construction of fastener steel scaffolding safety technical specifications (GJG130), the construction of fastening steel pipe scaffolding safety technical specifications (GJG130- -2011)
- Q: External wall insulation method of operation There are several combinations of materials
- Seeking the existing building construction specifications Daquan! The The @
- Q: The installation method of ordinary air conditioner. The more detailed the better. Please thank you all
- The basic operation of the same, but the different requirements of different professional, or to determine the direction of good, and then hands.
- Q: HVAC Heating: What are the main components of the air distribution system?
- Geothermal construction, the heating pipe spacing can not be less than 100mm, the construction can not be achieved, big brother!
Send your message to us
Uninsulated Aluminum Flexible Duct
- Loading Port:
- Guangzhou
- Payment Terms:
- TT or LC
- Min Order Qty:
- -
- Supply Capability:
- 200000 m/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords