• Underground GRP engineering pipe DN1100 System 1
  • Underground GRP engineering pipe DN1100 System 2
  • Underground GRP engineering pipe DN1100 System 3
Underground GRP engineering pipe DN1100

Underground GRP engineering pipe DN1100

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing


Underground GRP pipe/ FRP pipe

FRP winding pipe characteristics

1. Good physical mechanics performance

2. Being resistant to chemical erosion and longer service life

3. Excellent hydraulic characteristics

4. Lower installation and keeping cost

5. Flexible design and shorter reform term

6. No medium pollution

FRP pipe classification by application field

1.Chemical medium transportation pipe

2.Various producing process pipe (chemical process, paper making process, polluted water treatment process, sea water purifying process, food and drink producing process, and medicine producing process)

3.Pressure pipe for small hydroelectric power station on the ground and cycling pipe for power plant

4.Polluted water collecting and transporting pipe

5.Drink water transporting main line and tubing pipe

6.Oil field water injecting pipe and oil transporting pipe

7.Heat transporting pipe and sea water transporting pipe

8.Agricultural irrigation pipe

9.FRP set (ventilation, air-conditioner, chimney, cleaner) and piping

10.Gas drainage pipe for mine

FRP pipe classification by pressure in working state

1.Medium and low pressure pipe 0.6MPa2.5 MPa

2.High pressure pipe5.5MPa24 MPa

3.Mobile gravity pipe (which can be used when the pressure is under 0.6MPa)

4.Vacuum tube, external pressure pipe or siphon

If you have interest in the FRP pipe, please provide the following parameters: media, pressure and the use of the environment (overhead or buried), temperature, stiffness requirements, connections, we shall provide you most competitive price. Looking forward to our cooperation!


Q: If I feel the room cool off, one hour hot and open an hour this will be more expensive? More
Common scaffold brace is the U-type care, "construction of fasteners steel scaffolding safety technical regulations" (JGJ Gong Gong Duo Ji-tao pan Revenge two 130-2011) provides "adjustable support bearing capacity design value is not Should be less than 40kN, the support plate thickness should not be less than 5mm ", the general calculation using 30kN.
Q: Air to water heater host and air conditioning host is not the same
This test with a small sample length 127mm, width 12.7mm, the maximum thickness of 3.2mm. In the absence of ventilation test chamber. The top of the specimen (6.4 mm place) is clamped with a clamp on the bracket and the longitudinal axis of the specimen is kept vertical. The lower end of the specimen is 9.5mm from the lamp tip and 305mm from the dry absorbent cotton surface. Bring the Bunsen burner and adjust it to produce a blue flame with a height of 19mm. Place the Bunsen Lights flame at the bottom of the sample for 10s, then remove the flame (at least 152mm away from the specimen) and write down the sample. Burning time. If the flame of the sample within 30s after removal of the flame is extinguished, the original lamp must be moved under the specimen again, re-ignite the sample for 10s, and then remove the Bunsen burner again and note the flame burning And flames burning the burning time. If the sample droplets drip, let it fall into the sample under the 305mm cotton, to see whether it ignited cotton. If the absorbent cotton is on fire, the rating should be taken into account. Specific grading indicators are as follows. Test Item 94V-094V-194V-21 Ten-time ignition Total flame burning time Maximum value (S) Individual flame burning time Maximum value (s) Flameless burning time (s) Yes Flame drop No No Allow only short time Burning general UL yellow card on the thickness of the test strip is divided into: 1/8 inch, 1/16 inch, 1/32 inch thickness, that is, 3.2mm, 1.6mm, 0.8mm three grades test.
Q: Do 3cm thick wall insulation how much kilogram of slurry and how many kilograms of polystyrene particles
You are talking about the construction measures it is not the house measures it, because the house has a construction of Huohuohuohuo number of leather and bronze sculpture drawings and specifications, high-rise building scaffolding should be lightning protection measures, that is, under the scaffolding around Reliable grounding (not less than four times, not less than 16 square copper core BV line), if it is pick plus, and the house can be connected to the pressure ring. Tower crane I will not say, upstairs has been said.
Q: I added the space 18 degrees opened for 5 hours or not cold, we all know how is it? More
Common points are all sandwich panels, with a hard protective layer, the difference is the middle of the different materials, such as polystyrene board, polyurethane board. Polystyrene board which is the most common, because the price is cheap, easy to use so the use of more, but if the temperature is more than the requirements of the chicken inertia glycosylation moxibustion slim faint words, polystyrene board is not satisfied , So there is a polyurethane sandwich panels, polyurethane thermal conductivity of less than 0.. in the existing insulation materials, large quantities of processing, be the best. But because of its process is more complex, and the cost is relatively high, so with less, the common combination of cold storage and the like, I believe that with the economic and technological development, polyurethane sandwich board market share will be more and more High
Q: Air conditioning machine work when the sound is too much reason
This is based on the density of benzene board decision, not what you said, know it buddy.
Q: What is the whole heat exchange fresh air ventilator?
(GJG130 - Fan Jutang Duanjie Daojie Juejiao 2001) will be replaced by (GJG130-2011) is expected to begin the implementation of the construction of this year, the construction of fastener steel scaffolding safety technical specifications (GJG130), the construction of fastening steel pipe scaffolding safety technical specifications (GJG130- -2011)
Q: External wall insulation method of operation There are several combinations of materials
30-150 per square meter has, mainly to see the material, thickness and so on
Q: The installation method of ordinary air conditioner. The more detailed the better. Please thank you all
The basic operation of the same, but the different requirements of different professional, or to determine the direction of good, and then hands.
Q: In the design, the building structure and the hydropower are generally designed by the Architectural Design Institute. The air conditioning ventilation is based on the design of the room. Or first air conditioning ventilation? More
Normal heat absorption is also due to poor ventilation (dirty) and air humidity so icing
Q: HVAC Heating: What are the main components of the air distribution system?
The reasons are the following: 1. Household electricity is not enough, can not start the compressor, so in the heating state can only be ventilated state, cooling the state directly jump electricity; 2. See if you are reported failure, Code to determine the need for on-site inspection in order to know the specific situation; 3. Four-way valve should be no problem, do not just believe that this is the problem Oh; help your words to adopt

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords