• Luffing Tower Crane New TCD5032 supplier System 1
  • Luffing Tower Crane New TCD5032 supplier System 2
  • Luffing Tower Crane New TCD5032 supplier System 3
  • Luffing Tower Crane New TCD5032 supplier System 4
  • Luffing Tower Crane New TCD5032 supplier System 5
Luffing Tower Crane New TCD5032 supplier

Luffing Tower Crane New TCD5032 supplier

Ref Price:
$40,000.00 - 200,000.00 / unit get latest price
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 Quick Details of TCD5032 Luffing Tower Crane


Feature: Tower Crane                          

Condition: New                                          

Max.Lifting Load: 10T

Place of Origin: China(Mainland)          

Model Number: TCD5032       

 

Packaging & Delivery of TCD5032 Luffing Tower Crane

 

Packaging Detail: Nude package          

Delivery Detail: 25-30days

 

Images of TCD5032 Luffing Tower Crane

 

 

 

FAQ of TCD5032 Luffing Tower Crane

 

Q: What is the principal to quote the right tower crane to the client?

A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client: max lifting capacity, height (height under hook), tip load and jib length.

Second, we need to know what the foundation requirement from the client is. (Fixed/undercarriage/ undercarriage with traveling system), mast section type (panel/integrated), power supply source (voltage, ampere and frequency), the distance between the machine and power supply……

Third if there are special needs, we could suggest proposal according to clear data provided by the clients. End-user, as construction machinery buyer, knows the site situation well and should make decision, such as the machinery specification, type…….

 

Q: What about our tower crane's warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the tower crane?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.



 

To Lead The Revoluation of International Trade


Q: What windproof devices should be set up for crane work?
2. torque limiterTorque limiter is an integrated safety protection device for jib cranes.We know that an arm crane represents the load condition from the moment of gravity. The load moment value is made up of product weight, amplitude decision, amplitude value is determined by the product, the boom of the crane arm length and angle cosine so that the crane is overloaded, in fact are the weight, arm length and arm angle limit, while also considering the working conditions and other parameters as well as constraints effect of control is more complex.At present, the widely used microcomputer controlled torque limiter can synthesize various situations and solve this problem better. The torque limiter consists of a load detector, an arm length detector, an angle detector, a work condition selector, and a microcomputer. When the crane to enter the working state, the computer will detect the signal input parameters of the actual working state, after operation, amplifying and processing, and advance into the rated load moment value, and at the same time in the display to display the corresponding actual values. When the actual value reaches the rated value of 90%, it will issue a warning signal when the actual value exceeds the rated load when the alarm signal, at the same time the crane to stop dangerous direction (lifting, boom, arm and rotary movements continue to drop).
Q: which crane makes only one Life Partner ?
um---one of them queer cranes? ha HA! cause only them gays use that term, life partner! am i right?
Q: What are the special operators of tower cranes?
The tower has special operations personnel of heavy machinery refers to the construction site in the tower crane division signal cable, installation and disassembly, the driver, and the demolition work of gondola installation, may cause serious harm to themselves, others and the surrounding facilities operations personnel.
Q: Just wondering i am so confused
It's a crane thing. Seriously though - overhead crane, gantry or polar crane!
Q: What are the requirements for the use of an anti-two block device on a lattice boom crane used as a drill?
Any modifications to a crane or other hoisting device should be checked with the manufacturer or designed by an Engineer schooled in the proper discipline IE: not an electrical or nuclear engineer.
Q: What should i do to solve tower crane collapse?
tower okorder / to see if whether your trouble is one of those tower crane troubles ?may be you can solve your question under its help.
Q: In the poem "The Wayfarer”, what is Crane's ironic comment on the pursuit of truth?
On a semi-close inspection, it would seem to me that Crane is saying that, ironically, the truth hurts. He's making a statement similar to Shakespeare in Hamlet. Hamlet is NOT muddled by indecision, as so many poor readers have often thought, but he sees much too much of the truth of the way of the world, and sees how futile and terrifying it is, and is embarrassed, or even humorously angered, that he should be asked to fix the world in the face of such impossible distress and futility. Similarly, the path to truth in Crane's The Wayfarer is overgrown with painful daggers which, if you step onto the path, will cut up your feet; if you take the path and find truth, you'll be hurt and dumbstruck and terrified by this path, so that the Truth (with a capital 'T') itself convinces the poem's 'hero' to turn to a different path, to choose something other than truth. And he doesn't even need to walk the path at all, only get a bit of a glimpse into truth, in order to be terrified by it.
Q: How do you apply for it? What are the specific requirements?
and their own preparation program, the use of side with security records, often do this, all know!
Q: What company makes a good engine crane I can order online?
I would suggest going to Harbor Freight or Oreilley's auto parts... they both should have them at at very reasonable price...if you order online it wouldnt be cost effective due to the shipping and handling added on to the price.
Q: how do they erect those large tower cranes you see on big building projects?
with another crane. assemble the tower first in sections, assemble the jib on the ground then lift it into place