• Lopless Tower Crane New CMAX TC4808 Tyre System 1
  • Lopless Tower Crane New CMAX TC4808 Tyre System 2
  • Lopless Tower Crane New CMAX TC4808 Tyre System 3
  • Lopless Tower Crane New CMAX TC4808 Tyre System 4
  • Lopless Tower Crane New CMAX TC4808 Tyre System 5
  • Lopless Tower Crane New CMAX TC4808 Tyre System 6
Lopless Tower Crane New CMAX TC4808 Tyre

Lopless Tower Crane New CMAX TC4808 Tyre

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 Quick Details

Feature: Tower Crane                          Condition: New                                           Max.Lifting Load: 8T

Span: 48m                                             Place of Origin: Human China(Mainland) 

Brand Name: CMAX                              Model Number: TC4808         

 

Packaging & Delivery

Packaging Detail: Nude package          Delivery Detail: 25-30days

 

Specifications

● Provide stepless speed regulation. Outstanding in working efficiency, operating stability and reliability,

● Reduce future maintenance cost.

 

 

To Lead The Revoluation of International Trade

Q: On the wing chun T-shirts they got i print of a crane and a snake what do they mean and the yin and yang?
There are a couple of theories behind the snake and crane. One is that Wing Chun was developed as a hybrid of the snake and crane styles. The other goes back to the folk tale that a Shaolin nun named Ng Mui got inspiration for creating Wing Chun by watching either a snake and crane or fox and crane fight. The yin and yang is a religious symbol coming from taoism. It symbolizes opposites like hard and soft and how they must be in harmony.
Q: a crane lifts load of 500kg mass to a distance f 20m in 10s at a constant velocity. how much work is done?
work done(W) is given by the change in the potential energy(P.E). here, initial P.E = 0. final P.E = mgh = (500)(10)(20) = 100000 J =100 KJ (kilo joules) therefore work done = 100 KJ. here distance means vertical height.But if the crane takes the load parallel to the ground ,then work done will be zero.Time is given here to calculate the power of the crane given by work/time = 10 KW(kilo watts).
Q: If I can't leave them outside..what should I do?
what ive heard from the book sadako and the 1000 paper cranes, It is Japanese legend that folding 1000 paper cranes (senzaburu) so pleases the gods that the folder is granted a wish. SO MAKE A WISH!
Q: When you're training to work in construction, do you need to do a seperate course or qualification in order to be able to operate a crane? Or are all construction workers taught it in training?
Of course you need specialised training! Crane operators have to sit several courses in safe crane operations. Crane operators tend to just work cranes and not help with general building work as they earn more money and it is only cost effective to have them on site when they are actually needing to use the crane.
Q: Tower crane (tower crane)
Fixed tower crane, mobile tower crane, flat tower crane, movable arm tower crane
Q: Romney woulda had that thing fixed by now.
Obama hates cranes!
Q: I don't like the crane stock because it looks funny but if you can see the wires when you use a PEQ box I'd prefer a crane stock
I prefer crane stocks. I like the way they look (plus they're comfortable). I think PEQ boxes are ugly.
Q: Tower crane attached concrete pump can be? Are there any state regulations?
Do not need to expressly can not tower crane work mode cannot withstand recoil thrust and level, and these forces or dynamic load, if the use of the tower crane is not an accident, almost impossible, then help the wall studs, will fall off, the consequences are not dare to think.
Q: Who was the guy called the Headless Horseman in the story of Ichabod Crane?
In the Washington Irving version of the story (which may be the original, I don't know if he based it on an earlier story or not), the Horseman is the ghost of a Hessian mercenary who fought died during the American Revolutionary War (if you don't know about this, Hessians were German mercenaries that were hired by the British). However, in this story, the guy never is given a name. He might be given a name in other versions of the story, but I am only really familiar with the Washington Irving version the various movies based on that story.
Q: my sister would like to know this for some strange and bizzar reasion
It depends on how many people are making them. Depending on skill it takes about 2-5 minutes to make a crane. If you dedicate 5 hours a day that makes 7-50 days if one person is making them. Cranes are often made for memorial. It is a Japanese tradition, especially for Hiroshima. You make 1000 cranes as a memorial for the lost lives. She should definitely get her friends to help.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords