linear air diffusers made in china supplying

Ref Price:
Loading Port:
Ningbo
Payment Terms:
TT OR LC
Min Order Qty:
500 pc
Supply Capability:
999999 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Specification of Air Diffuser

 

Supplying Air Diffusers 
-Frame Thickness: 1.0mm /0.8mm
-Any Size be customed 
-Powder Coated RAL 9010/9016

  

Usage of Air Diffuser

 

The grille is suitable for ceilling  sidewall, soffit or cill mounting and may be used for supply or extract applications. 

Typical installations include offices, shops, hotels and most commercial or industrial buildings.

Available as standard in white polyester powder coat finish. 

Other polyester powder  coat finishes are also available as an option.

 

linear air diffusers made in china supplying

linear air diffusers made in china supplying

linear air diffusers made in china supplying

linear air diffusers made in china supplying

linear air diffusers made in china supplying

linear air diffusers made in china supplying

 

FAQ of Air Diffuser:

 

1, What's size do u have for round type diffuser?

A: We have face size from 150mm to 550mm,neck size from 250mm to 400mm

 

2, Do u still have other types ?

A: Yes, we have round diffuser/ rectangle diffuser/ linear grilles/ baseboard diffusers,etc

 

3, What's the most early delivery time?

A: Within 25 days for each 40'fcl

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What kind of pipe is better to use, which is more used?
Now do warm is basically more PEX tube...
Q:Which electric heating board is economical and economical
Is a new type of wall-mounted heating panels, electricity is one-third of air conditioning...
Q:Do you want to turn off the water return switch when the geothermal pipe is exhausted?
Geothermal (floor warm) water separator: We are exposed to the only equipment, but also we need to operate the exhaust equipment. Divided into the supply (into) water pipes and back (out) water pipes, in general, the top of the water supply pipe, the bottom is the return pipe, each have a valve, the ball valve: the horizontal direction is open, vertical helium float Feng Tong Feng is off. Gate valve: screw clockwise screw is off, counterclockwise twist is open. Another tool: a soft leather tube, the size and exhaust valve port similar to the elastic, can be tight in the exhaust valve port, to prevent the discharge when the pop, affecting health. A basin. 1. It is best to determine the exhaust in the normal heating 2. The best one by one system exhaust, in the geothermal first run process, because the pipeline pressure and water resistance is easy to produce air plug, resulting in water supply is not recycled, the temperature is not equal , Should be carried out by road exhaust. The method is: turn off the heating of the total return valve and the loop control valve, (the total return valve in front of the water separator, the pipe below the tube, the low temperature of the pipe is the return pipe.) First open the water separator A control valve, and then open the drain on the drain valve on the exhaust valve exhaust, drain the air and then close the valve, while opening the next valve. And so on, each way the air is drained and then all the valves open, the system is running. 3. The number of exhaust and heating are directly related to the length of time, such as running water and heating time, just started heating and fast heating because of heating time is short, circulating pump and heat transfer station also has time to stop, easily lead to gas block, so everyone Should be more exhaust, generally completely after a gas can be. In the later exhaust do not have to close the valve, you can directly discharge a small amount of air
Q:What is the warm lead of the heating cable
This is a kind of special sea ridiculed guest Curcuma Jiufeng after the end of the processing of the cable, belonging to the temperature control class of metal parts. When the room temperature is below the set temperature, he will be connected to the current, so that the heating system to run, generate heat to know to set the temperature.
Q:What does building HVAC include?
Heating (heating) ventilation air conditioning
Q:To warm the decoration of the pipe what requirements Mody, the market are their own good how to distinguish it?
As long as the PERT material can be
Q:Electricity to warm and water to warm contrast
Before the water is warm, it is electric to warm. The first is because the gas costs continue to rise, and electricity began to appear electricity peak and trough, the second is because the water can not be closed after the warm, can not be laid single room, and now warm home warm, warm floor, According to the time, the district of different ways of the switch, power consumption is also low, so what is better and worse than the factory to determine Yao Deng witnessed super cunning, landlord should understand.
Q:Liquefied gas can be installed to warm it?
It is recommended not to liquefied gas, its concentration is relatively large, that is, the same cubic liquefied petroleum gas with the pipeline for the rush stinging fumigation smoked gas, liquefied petroleum gas combustion power is a few times the pipeline gas The boiler combustion system is set up in accordance with the pipeline gas. The use of liquefied gas will cause damage to the boiler parts.
Q:The water in the heating furnace is often good
Good water change! But it is best to change the distilled water. Distilled water can not produce scale. Often change the water can wash away the rust inside the heating system! Distilled water is easy to do with some large boilers. In the hot days do not have the best time to heat the heating; winter if the indoor can not heat heating is best to put the water out, so as not to freeze the heating system.
Q:Home heating stove, how about? Is not very costly, which brand is better.
Beautiful, very costly, power two thousand to six kilowatts

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range