• Kwikstage Scaffolding System-Scaffold Wire Mesh Guard CNBM System 1
  • Kwikstage Scaffolding System-Scaffold Wire Mesh Guard CNBM System 2
Kwikstage Scaffolding System-Scaffold Wire Mesh Guard CNBM

Kwikstage Scaffolding System-Scaffold Wire Mesh Guard CNBM

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t
Supply Capability:
3000 m.t/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Quick Details

  • Model Number: KS-MG

  • Type: Scaffolding Parts, Wire mesh

  • Scaffolding Part Type: Scaffolding Planks

  • Material: Steel

  • Surface: Galvanized

  • Standard: AS1576 & AS1577

2.Packaging:pallet

3.Product Description

Model No: FAS-LP

Model Name: Scaffolding Hook-Lock Pin

Features:

1) Material: made of  Φ9 steel bar.

2) Surface: electro-galvanized/hot dipped galvanized

3) Weight: 0.1kg

4.

Model

Description

Weight(kg)

Weight(lbs)

AR.DB.3050x2000

Ring   Lock Bay Brace 3050x2000mm (10')

10.87

23.96

AR.DB.2745x2000

Ring   Lock Bay Brace 3050x2000mm (10')

10.24

23.96

AR.DB.2440x2000

Ring   Lock Bay Brace 2440x2000mm (8')

9.62

21.20

AR.DB.2130x2000

Ring   Lock Bay Brace 2130x2000mm (7')

9.03

19.91

AR.DB.1830x2000

Ring   Lock Bay Brace 1830x2000mm (6')

8.51

18.76

AR.DB.1520x2000

Ring   Lock Bay Brace 1520x2000mm (5')

7.91

17.45

5.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Kwikstage Scaffolding System-Scaffold Wire Mesh Guard CNBM

Q:Will the concrete cloth machine and the tower crane is different, long quite like Please explain the structure of the application, 3Q
The role of the tower crane is to a variety of building materials (such as brick, mortar, concrete - also due to small units do not pump, components, etc); turnover materials (such as steel formwork, scaffold tube, etc) The Forearm without a pipe, some pipe is 50mm below the structure of the steel pipe is not connected to each other, the end of a hook Crawler cranes commonly known as crawler cranes, the boom is generally not scalable but can be long, both the boom (commonly known as boom) are able to pitch, no tower, you can I can not see the track, I have seen the largest car crane is the largest weight from 80 tons, I have seen the largest crawler crane is the largest lifting weight of 1350 tons Tower crane (commonly known as the tower crane) can not tilt the general boom, can not be stretched, have a tower, generally can not move, and some can move but on the default rail, can not move the seat on the concrete base The You said something and tower cranes can be too different
Q:Would like to ask you under the construction of the rainy season, what measures ah? Teach the next sprinkle
pay close attention to weather forecast, do a good job in Taiwan flood prevention work, if necessary, should be reinforced in the construction of the project do a good job of building materials, rain and moisture work the construction site of the road, the facilities must be smooth drainage, as far as possible rain to stop the water, to prevent the ground water into the basement foundation, the basic project should do a good job slope anti-skid and anti-collapse in the rainy season before doing live housing, equipment, drainage and rain measures Ready to use the water pump and related equipment, prepare the right amount of plastic cloth, linoleum and other rain material encountered heavy rain should immediately stop the pouring of concrete, and has been pouring silicon parts of the plastic film covered all mechanical and electrical equipment to build the protective shed to be strong, and take rain, flood prevention measures, installation of grounding safety devices, electrical box leakage protection device must be sensitive and reliable, and often check the construction site of the tower crane, construction elevator, outside the scaffolding need to install lightning protection device, grounding resistance is not greater than 4Ω the rainy season construction to do a good job of anti-skid reinforcement work all mechanical equipment after the rain should first check whether the circuit is intact Dry and so on
Q:What is the most important safety hazard at the construction site?
Civilized construction Site fencing Some works in the urban area of ??the main section of the site is not set above the 25m fence some site fence material is not strong, unstable, not clean, do not meet the local aesthetic requirements
Q:A man of mass 74.4 kg stands on a scaffold supported by a vertical rope at each end. The scaffold has a mass of 21.9 kg and is 3.9 m long. Suppose the man stands to the right from the middle of the scaffold that is a distance one sixth of the length of the scaffold. What is the tension in the right rope? b) What is the tension in the left rope? thanks in advance.
this could be a 2d concern. The moments approximately any factor interior the gadget would desire to stability, in the different case the gadget (scaffold) would rotate. additionally, the vertical forces would desire to stability, or the gadget (scaffold) would translate. it form of feels to me that to the superb from the middle of the scaffold it somewhat is a distance one 6th of the dimensions of the scaffold is comparable to saying 2-thirds from the left-edge of the scaffold. The moments could be summed approximately any factor. i will evaluate the left facet of the scaffold, the place the 2d produced by the left rope is 0. comprehensive M = 0 = scaffold M + guy M + suited rope M 0 = 23.7kg*9.8m/s^2*(3.1m/2) + 60.1kg*9.8m/s^2*(2*3.1m/3) - F*3.1m wherein: the scaffold is considered a factor mass located at its center the strain F acts opposite to the load of the guy and the scaffolding, and subsequently has -ve sign remedy for F. To get the strain in the different rope, you are able to basically evaluate the vertical forces interior the gadget. on the different hand, you should sum the moments approximately another factor (say, the superb rope). wish this permits.
Q:PLEASE HELP!!!!!
maybe because her partner in crime was in the crowd and she didnt give- that takes some big balls
Q:Renovation of construction guidance? (Refers to the carpentry, painters, mud and other approach to the entry. Tooling)
First, into the construction site personnel safety production notes
Q:Im pretty sure that the 3 characters are Reverend Mr. Wilson, Governer Bellingham, and Mistress Hibbins. The hard part is finding what they represent.
First I would like to acknowledge that this question is from the book: The Scarlet Letter by Nathaniel Hawthorne
Q:- Construction safety and quality control report for the depth of construction quality and construction safety production, to ensure the safety and use of structural features to prevent the fall, collapse, mechanical injuries and other multiple accidents,
How is offshore oil mining?The method of lifting the oil from the bottom of the hole to the ground by the energy of the reservoir itself or by the artificial supply
Q:Pain on a scale of 1-10Advice on piercing?I heard it's easily infected??
Pain will differ from person to person so no one can really answer that. My advice is to sleep with your arm bent under your head so your ear is in that little whole and nothing can bother it. Also, avoid dying your hair for the next two months and be care when putting on sweaters, shirts, brushing hair, et cetera. Infection is a problem if you keep it clean but irritation is because every time you bump on side, you bump the other as well. Good luck!
Q:for 10 sq. meters = ? h/sq. m. and how many person need to do the job?
It depend upon availability sorting of ledger to be used.If prop ledger has been transported sorted then three person can do 10 sqm in maximum 3/4 hour .i.e.0.075 h/sqm

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords