Kwikstage Scaffolding System-Scaffold Wire Mesh Guard CNBM

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t
Supply Capability:
3000 m.t/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Quick Details

  • Model Number: KS-MG

  • Type: Scaffolding Parts, Wire mesh

  • Scaffolding Part Type: Scaffolding Planks

  • Material: Steel

  • Surface: Galvanized

  • Standard: AS1576 & AS1577

2.Packaging:pallet

3.Product Description

Model No: FAS-LP

Model Name: Scaffolding Hook-Lock Pin

Features:

1) Material: made of  Φ9 steel bar.

2) Surface: electro-galvanized/hot dipped galvanized

3) Weight: 0.1kg

4.

Model

Description

Weight(kg)

Weight(lbs)

AR.DB.3050x2000

Ring   Lock Bay Brace 3050x2000mm (10')

10.87

23.96

AR.DB.2745x2000

Ring   Lock Bay Brace 3050x2000mm (10')

10.24

23.96

AR.DB.2440x2000

Ring   Lock Bay Brace 2440x2000mm (8')

9.62

21.20

AR.DB.2130x2000

Ring   Lock Bay Brace 2130x2000mm (7')

9.03

19.91

AR.DB.1830x2000

Ring   Lock Bay Brace 1830x2000mm (6')

8.51

18.76

AR.DB.1520x2000

Ring   Lock Bay Brace 1520x2000mm (5')

7.91

17.45

5.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Kwikstage Scaffolding System-Scaffold Wire Mesh Guard CNBM

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the exterior scaffolding erection specification? What do you need to pay attention to?
Presumably everyone on the external scaffolding erected norms of the word feel strange, do not know what it is about what is it? Now look at: what is the external walls of scaffolding erection specification: There are several to note: in their daily lives which are needed
Q:Two window washers, Bob and Joe, are on a 3.00 m long, 380 N scaffold supported by two cables attached to its?
Oh, Ashley, you can't fit more than an intro in the what would you like to ask. More room in details.
Q:A man of mass 74.4 kg stands on a scaffold supported by a vertical rope at each end. The scaffold has a mass o?
Left rope = T1 Right rope = T2 1/6 of 3.9 m = 0.65 m 3.9/2= 1.95 1.95 - 0.65 = 1.3 m from right rope. Take g = 10m/s^2 T1 = ((219 x 3.9)/2) + (744 x 1.3) = 1394.25 1394.25 = 3.9 x T1 1394.25/3.9 = T1 = 357.5 N (answer for left rope) T2 = ((219 x 3.9)/2) + (744 x (3.9 -1.3)) = 2361.45 2361.45 = 3.9 x T2 2361.45/3.9 = T2 = 605.5 N (answer for right rope)
Q:There is no shelter outside the scaffolding project has been accident accident case
I do not know what the problem you said is not clear, to send the following to you, for your reference: [Case 1] a single industrial plant project, eaves high 20m, construction area of ​​5800m2
Q:How to connect the frame column bars in several ways? What should you watch out for?
Hello, "farmers from the building, the most important is the quality and safety
Q:Seeking real estate development project emergency rescue plan, the word asked a little more. Thank you
In order to prevent the occurrence of production safety accidents at the construction site, improve the emergency working mechanism, in the event of the accident occurred in the project, the rapid and orderly emergency rescue work to carry out the accident, rescue the rescue project, the construction of the project site safety accident emergency plan The wounded, reduce the loss of the accident, the development of this plan
Q:A man is 2 ft from 1 end of a 6 ft plnk spprted at each end by scaffold. How much wght is spprted at each end?
the 4 ft end will support 66,66% of the weight and the 2 ft end will support 33,34% of the weight
Q:Can the fifteen typhoon blow up the three - storey house?
Strong winds may blow down buildings, high-altitude facilities, easily lead to casualties
Q:What is the difference between a steel pipe stent and a steel scaffolding? The
Template support and scaffolding are force components can be wood structure, steel structure and prefabricated concrete structure, which is classified according to their use of the general should not share the same structure, so as to avoid the operation of the construction process caused by the template shaking and affect the quality of the project The In general, the template support is through the template to bear the relevant load from the concrete; and scaffolding to bear the construction workers, equipment and construction materials and other loads
Q:How to calculate the amount of steel pipe Pay attention to meters as a unit, or tons of units! Thank you
With the number of specifications after each, in accordance with the principle of 260M for a ton See how much the specific need to be able to You said ten layers, not all ten layers of all structures, you can build three layers of three 3m high So you need to use more than 25 high steel pipe, because there are up and down positions Hope to help you, if you still do not understand, you can go to China Building Materials Leasing Network wwwzzzlllcom inquiries

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range