formwork cast iron wing nut --building construction

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
10000 pc
Supply Capability:
10000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Item:

wing nut

dia:

15/17mm

surface treatmnt:

black, galvanized

In application:

matching with tie bar 15mm





Packaging & Delivery

Packaging Detail:wing nut - 50 pcs per bag. 2000 pcs per ton bag. or as your demand.
Delivery Detail:25-30 days after receving your advanced payment

Specifications

Item:wing nut 
dimension: major dia 17mm, small dia:15mm 
material: Q235 
strength:105KN

Item: wing nut  

dimension: major dia 17mm, small dia:15mm
material: Q235
strength:105KN

Basic Information


Product/Service (We Sell):Tie Rod,Wing Nut,Formwork Jack,Coil Rod,Waller Plate  

Brands:TP  

Number of Employees:51 - 100 People  

Trade & Market


Main Markets:North America
South America
Southeast Asia
Oceania
Mid East
Western Europe

Total Annual Sales Volume:US$2.5 Million - US$5 Million  

Export Percentage:21% - 30%  

Factory Information


Factory Size (Sq.meters):5,000-10,000 square meters  

Factory Location:No.108 center road fumin economical development zone,Wuqing district,Tianjin,China  

Number of Production Lines:Above 10  

Number of R&D Staff:5 - 10 People  

Number of QC Staff:5 - 10 People  

Management Certification:ISO9001  

Contract Manufacturing:OEM Service Offered   Design Service Offered   Buyer Label Offered  


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:what's the meaning of scaffold?
scaffolding business would refer to building the business up in steps that are connected. A gradual increase, building up from what is already in place.
Q:New features of quick dismantling scaffolding?
The scaffold material for the Q235 high frequency welded pipe diameter 48mm wall thickness 2.75mm-3.5mm can be processed in accordance with the requirements of
Q:The bottom of the cantilever scaffold must be provided with the sweeping rod
Steel pipe: (1) steel pipe with 48mm outside diameter, wall thickness of 3.5mm steel welded pipe No. 3
Q:Introduction of external scaffolding
Temporary structure frame for feeding, piling and construction work outside the outer wall of the outer wall for building construction. 1.1 parts1.1.1 pipe1 scaffolding steel pipe with Phi 48mm, wall thickness of 3.5mm; horizontal horizontal bar maximum length of 2200mm, the maximum length of other rods 6500mm, and the maximum quality of each steel pipe should not be greater than 25kg.
Q:scaffold piercings? what do you think?
It's not going to hurt 'especially' don't worry. :) xoxox
Q:Scaffolding stuck, need ideas for removing.?
Heat the female connection with a torch. The outer connection will expand from the heat. Heat the connection hot enough not to touch but not cherry red. Put a pipe wrench on male side of tubing where its is cool and tap wrench with a hammer and it will come apart. If possible lay the scaffold on its size for better leverage.
Q:what is the height of a scaffold if the person is 6ft tall?
Whatever they set it at. It could be 1 foot, 4 feet, or 20 feet. How tall a person is, is irrelevant.
Q:How to solve the problem of scaffold pipe repair
In the construction of the bending, torsional irregular steel tube to adjust the straight, mechanical transmission, reasonable structure, high efficiency, safe and reliable
Q:Scaffold Piercing Im 15 Help.?
Sorry to rain on your parade, but neither of those plans will work. Scaffold piercings need to be lined up a certain way in your ear, so you can't start with an existing piercing because you can't change your ear to fit what is already pierced. Scaffold piercings also need to heal with a bar in for them to be able to support a bar. You can't just get 2 cartilage piercings and stick a bar through. They won't line up and may not be able to support the extra weight of the bar, and migrate out. Seriously, do some research and wait until you are 16 at least.
Q:Can you do the outer scaffolding?
(2) the outer side of the scaffold must be provided with scissors, scissors width should not be less than 4 span, and should not be less than 6m, the angle between the diagonal rod and the ground is 45-60 degrees. The intersection points of the oblique bars are on the same straight line and are arranged along the height of the frame. (3) a diagonal rod of the scissors is buckled on the upright post, and the other inclined rod is buckled on the end of the small transverse rod, and the two ends are respectively fixed with a rotating fastener. All fixed pitch master node distance not greater than 15 cm

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range