Cuplock Standard Scaffolding High Quality
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 kg
- Supply Capability:
- 100000 kg/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Cuplock Standard Scaffolding High Quality
Information:
Name: Cuplock Scaffolding System
Category: Scaffolding system
Material: Steel (Q235/Q345)
Size:
48.3*3.25mm
Surface:
Electro Galvanized/Self Color/Painted/HDG
Details: Component: Standard, Ledger, Strengthened ledger, Transom Beam, Diagonal, Bracket, Top cup, Bottom cup, Ledger blade, etc.
Application: Highways/Subways, Bridges, Tunnels and Fire Electrical Engineering, Marine Engineering
Advantage: Durable, Stable, Skid-proof, Antirust, Easy to assemble & Dismantle
Manufacturer: OEM service is available
Items or goods can be manufactured according to your standards.
Cuplock Scaffolding
Cuplock scaffolding is one of the world’s widely used systems.
It’s unique circular node allows up to 4 components to be assembly in quick action.
Steel Tube: Diameter:48mm Thickness:2.75mm/3.0mm/3.2mm
Steel Grade: Q235,Q345
Surface: Hot Dip Gal., Electro Gal., Painting
Component: Standard, Ledger, Brace, Metal Plank, Ladder, Base jack, Up/bottom cup, Blade
More information:
Assembly Name | Length(mm) |
Standard | 500, 1000, 1300, 1500, 1800,2000, 2300,2500,3000 |
Ledger | 600, 900, 1000, 1200, 1300, 1600, 1800, 2500 |
Brace | 1300x2000, 1800x2000, 2500x2000 |
Transom | 565, 795, 1200, 1300, 1800, 2500 |
- Q:Bowl buckle scaffold from the machine to pull out the upper and lower bowl
- It seems that there is no specific load value in the code, but there are some requirements on the calculation method and some structural loads
- Q:is this right any answers please
- well id say not. go and talk to the owner of the company, there may have just been a mistake other wise go to you citezen advice and they will be able to better inform you
- Q:when must you wear safety harnesses on scaffolding?
- When you're on the scaffolding, of course.
- Q:I have a cartilage piercing on my right ear and now I want scaffolding. Can they just pierce the other side of my ear (opposite my other cartilage piercing) and put a scaffold bar through my existing cartilage piercing hole and the new piercing hole opposite? Can I then get another cartilage piercing straight underneath the scaffolding? How much does it hurt? Thanks in advance :)
- i've got heard it feels extra like a pinch. The septum piercing does not extremely bypass during the cartilage or something, in case you pull the midsection of your nostril down, there is slightly of epidermis there. that's the place the piercing is going via. My suggestion is to pinch it (in case you have nails) consisting of your nails, and you have the hassle-free thought of the 'oh, owch.' feeling? :]
- Q:Should I work Offshore or Scaffold?
- offshore for sure buddy,,scaffolding is a pain sometimes,,
- Q:The first scaffold scene is when Hester and Pearl are up there in front of the public.The second scene is with Dimmesdale, Hester, and Pearl at night. The stars create an quot;Aquot; in the sky.The third scene is in public again but with Dimmesdale and he dies.
- the first is puritanistic because of public humiliation and romanic because pearl notices her father at such a young age. the second because they are together as a fam(puritans did not belive in individualism) and romantic because the stars make an A in the sky. the third because of public confession and dimmesdale dies
- Q:Disc scaffolding used in the country?
- The bowl scaffold density is certainly better than the disc scaffolding for a little more, but the price is cheap, even than the disc with the volume, the cost price is one hundred percent less than the disc, at least 20%, this data is the safety performance of the above budget, I already mentioned, a diagonal bar is the use of ordinary tubes as scissors, and the top of the disc scaffolding cannot use the wooden keel as prescription, must use special steel keel disc, the cost is not small.
- Q:Bowl buckle scaffold can be used to support it
- Need to take some special way to do some processing
- Q:I really want to get an industrial piercing but I'm going to a music festival in about a month... If I get it done this weekend, will a month be time enough for it to heal, because I plan on being drunk for that whole festival so I doubt I'll find time to clean it haha..Should I get it done, or wait until after the festival?..Thanks :) x
- If you clean it for the first month real good you should be fine and clean it right when you get back. The only thing I'm thinking is that industrial is easily snagged and hit, which is going to cause pain and maybe infection. but if your willing to risk that go ahead. it's not the end of the world if you get an infection you just need to clean it with sea salt :P but it can be annoying, your choice.
- Q:I heard that because of the bicentennial in 2012, a lot of buildings are under renovation. I am worried that when we get there, all the buildings will be under scaffolding and we won't see anything or be able to appreciate the true ambiance of the city. Does anyone know what the city looks like right now?
- Hello. You can see most of everything. Not too many buildings in Restoration. The City looks well now . But Buenos Aires and generally Argentina are a mix of things. You visit Argentina and Buenos Aires for Monuments, Food, Culture, Dance and People. So....Enjoy Argentina and have fun
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Cuplock Standard Scaffolding High Quality
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1000 kg
- Supply Capability:
- 100000 kg/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords