• Construction Platform Andaime Roseta (South Amercia) with En12810 Standard CNBM System 1
  • Construction Platform Andaime Roseta (South Amercia) with En12810 Standard CNBM System 2
  • Construction Platform Andaime Roseta (South Amercia) with En12810 Standard CNBM System 3
Construction Platform Andaime Roseta (South Amercia) with En12810 Standard CNBM

Construction Platform Andaime Roseta (South Amercia) with En12810 Standard CNBM

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m.t.
Supply Capability:
30000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

  • Quick Details of Construction Platform Andaime Roseta (South Amercia) with En12810 Standard

  • Type:High Building

  • Material:Steel

  • Lapping Form:Full Scaffolding

  • Framework:Combined Scaffolding

  • Supporting Mode:Wall Hanging Scaffolding

  • Erection Position:External Scaffolding

  • Scaffolding Part Type:Scaffolding Platform

  • Move Method:Horizontal mobile Scaffolding

  • Structural Style:Tower Scaffolding

  • Surface Treatment:Hot DIP Galvanized, Galvanized, DIP Painted

  • Certificate:En12810, SGS Test Report for Loading Capacity

  • Color:Silver, Dark Red, Orange

  • Production Capability:100 Tons Per Week

  • Delivery Time:About 20-30 Days After Confirmation

  • Export Markets:Global


  • Construction Platform Andaime Roseta (South Amercia) with En12810 Standard CNBM

  • Construction Platform Andaime Roseta (South Amercia) with En12810 Standard CNBM


  • Construction Platform Andaime Roseta (South Amercia) with En12810 Standard CNBM


  • Descriptions of  Construction Platform Andaime Roseta (South Amercia) with En12810 Standard

  • 1. Standard:
        3000mm, 2500mm, 2000mm, 1500mm, 1000mm, 500mm.
    2. Ledger:
        3000mm, 2000mm, 1780mm, 1500mm, 1000mm, 500mm.
    3. Diagonal brace:
        3000x2000mm, 1780x2000mm, 1000x1500mm, 1000x2000mm, 1500x2000mm.
    4. Tube specification:
        Φ 48.3x4.0mm, φ 48.0 x3.25mm, φ 48.0 x3.0mm.
    5. Surface Finish:
        Hot DIP Galv. Electric Galv.Powder coating, Dip Painting.
    6. Material:
        Q235, Q345
    7. Certificate: 
        EN12810,SGS test report for loading capacity.

The Parts of  Construction Platform Andaime Roseta (South Amercia) with En12810 Standard

DESCRIPTIONMATERIALQTY.   (PCS)W. T.     (KG/PC)SURFACE
3.00m  standardQ345  48.3*3.2mm1.00 15.3Hot-dipped  Galvanized
2.50m  standardQ345  48.3*3.2mm1.00 12.9Hot-dipped  Galvanized
2.00m  standardQ345  48.3*3.2mm1.00 10.5Hot-dipped  Galvanized
1.50m  standardQ345  48.3*3.2mm1.00 8.1Hot-dipped  Galvanized
1.00m  standardQ345  48.3*3.2mm1.00 5.7Hot-dipped  Galvanized
0.50m  standardQ345  48.3*3.2mm1.00 3.3Hot-dipped  Galvanized
2.00m  ledgerQ345  48.3*2.5mm1.00 6.8Hot-dipped  Galvanized
1.80m  ledgerQ345  48.3*2.5mm1.00 6.2Hot-dipped  Galvanized
1.50m  ledgerQ345  48.3*2.5mm1.00 5.3Hot-dipped  Galvanized
1.20m  ledgerQ345  48.3*2.5mm1.00 4.4Hot-dipped  Galvanized
0.90m  ledgerQ345  48.3*2.5mm1.00 3.5Hot-dipped  Galvanized
0.60m  ledgerQ345  48.3*2.5mm1.00 2.6Hot-dipped  Galvanized
2.00*2.00m  braceQ235  33.5*2.3mm1.00 7Hot-dipped  Galvanized
1.80*2.00m  braceQ235  33.5*2.3mm1.00 6.7Hot-dipped  Galvanized
1.50*2.00m  braceQ235  33.5*2.3mm1.00 6.4Hot-dipped  Galvanized
1.20*2.00m  braceQ235  33.5*2.3mm1.00 6.1Hot-dipped  Galvanized
2.00*1.50m  braceQ235  33.5*2.3mm1.00 6.3Hot-dipped  Galvanized
1.80*1.50m  braceQ235  33.5*2.3mm1.00 6Hot-dipped  Galvanized
1.50*1.50m  braceQ235  33.5*2.3mm1.00 5.6Hot-dipped  Galvanized
1.20*1.50m  braceQ235  33.5*2.3mm1.00 5.2Hot-dipped  Galvanized
0.90*1.50m  braceQ235  33.5*2.3mm1.00 4.9Hot-dipped  Galvanized
0.60*1.50m  braceQ235  33.5*2.3mm1.00 4.7Hot-dipped  Galvanized
2.00*1.00m  braceQ235  33.5*2.3mm1.00 5.8Hot-dipped  Galvanized
1.80*1.00m  braceQ235  33.5*2.3mm1.00 5.4Hot-dipped  Galvanized
1.50*1.00m  braceQ235  33.5*2.3mm1.00 4.9Hot-dipped  Galvanized
1.20*1.00m  braceQ235  33.5*2.3mm1.00 4.5Hot-dipped  Galvanized
0.90*1.00m  braceQ235  33.5*2.3mm1.00 4.1Hot-dipped  Galvanized
0.60*1.00m  braceQ235  33.5*2.3mm1.00 3.8Hot-dipped  Galvanized
2.00*2.00m  braceQ345  48.3*2.5mm1.00 10.2Hot-dipped  Galvanized
1.80*2.00m  braceQ345  48.3*2.5mm1.00 9.8Hot-dipped  Galvanized
1.50*2.00m  braceQ345  48.3*2.5mm1.00 9.2Hot-dipped  Galvanized
1.20*2.00m  braceQ345  48.3*2.5mm1.00 8.8Hot-dipped  Galvanized
2.00*1.50m  braceQ345  48.3*2.5mm1.00 9.1Hot-dipped  Galvanized
1.80*1.50m  braceQ345  48.3*2.5mm1.00 8.7Hot-dipped  Galvanized
1.50*1.50m  braceQ345  48.3*2.5mm1.00 8Hot-dipped  Galvanized
1.20*1.50m  braceQ345  48.3*2.5mm1.00 7.4Hot-dipped  Galvanized
0.90*1.50m  braceQ345  48.3*2.5mm1.00 7Hot-dipped  Galvanized
0.60*1.50m  braceQ345  48.3*2.5mm1.00 6.6Hot-dipped  Galvanized
2.00*1.00m  braceQ345  48.3*2.5mm1.00 8.3Hot-dipped  Galvanized
1.80*1.00m  braceQ345  48.3*2.5mm1.00 7.7Hot-dipped  Galvanized
1.50*1.00m  braceQ345  48.3*2.5mm1.00 7Hot-dipped  Galvanized
1.20*1.00m  braceQ345  48.3*2.5mm1.00 6.2Hot-dipped  Galvanized
0.9*1m  braceQ345  48.3*2.5mm1.00 5.6Hot-dipped  Galvanized
0.6*1m  braceQ345  48.3*2.5mm1.00 5.2Hot-dipped  Galvanized
0.88m  board  bracketQ345  48.3*2.5mm1.00 9.5Hot-dipped  Galvanized
0.60m  base  collar  downQ235  38.1*4.5mm1.00 4.4Hot-dipped  Galvanized
0.60m  base  collar  upQ235  38.1*4.5mm1.00 5.2Hot-dipped  Galvanized
0.24*2.00m  PlankDX51D-Z801.00 8.2Hot-dipped  Galvanized
0.24*1.80m  PlankDX51D-Z801.00 7.5Hot-dipped  Galvanized
0.24*1.50m  PlankDX51D-Z801.00 6.5Hot-dipped  Galvanized
0.24*1.20m  PlankDX51D-Z801.00 5.5Hot-dipped  Galvanized
0.24*0.90m  PlankDX51D-Z801.00 4.5Hot-dipped  Galvanized
0.50*2.00m  PlankDX51D-Z801.00 15.3Hot-dipped  Galvanized
0.50*1.80m  PlankDX51D-Z801.00 14Hot-dipped  Galvanized
0.50*1.50m  PlankDX51D-Z801.00 11.9Hot-dipped  Galvanized
0.50*1.20m  PlankDX51D-Z801.00 9.9Hot-dipped  Galvanized
0.50*0.90m  PlankDX51D-Z801.00 7.9Hot-dipped  Galvanized
  • FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Q: Sweeping rod, large cross bar, small cross bar, scissors brace, vertical pole, right angle fastener, rotating fastener, butt joint fastener, even wall piece! If there is a cantilever frame, the main beam, steel wire rope, such as pull down support
Mobile scaffolding is the main frame, cross frame, cross diagonal brace, foot board, adjustable base and other components. The cross rod is also called the diagonal pull rod, and is a cross connecting rod which is vertically connected with the two door frames. The part of both ends of the rod part is punched with a pin hole, and the locking pin on the vertical rod of the door and the frame is locked when assembling.
Q: Every time someone in medieval times was murdered by the beheading a new scaffold was built for the next prisoner.
Well that's not entirely true; they didn't ALWAYS built a new scaffold. Probably movies let you think so but that was not the case.
Q: What are the requirements for acceptance of external scaffolding? Want to know before
7, scaffolding erection should be higher than the top of the building or the operating surface of 1.5m or more, and add enclosure. 8, the erection of the scaffolding on the steel pipe, fasteners, foot board and connection points shall not be arbitrarily removed. When necessary, the construction site must be approved by the person in charge of the site and take effective measures. 9, the use of scaffolding, the site should be responsible for the organization of inspection and acceptance, acceptance and fill in the inspection form before use. In the construction process should be professional management, inspection and warranty, and periodic settlement observation, found abnormal should take timely reinforcement measures.
Q: 1.How does Pearl react when Dimmesdale calls Hester and herself to mount the scaffold with him?
The answer can be found in the novel The Scarlet Letter by Nathaniel Hawthorne. Read that and you'll have the answer!
Q: Topic?Scaffolding construction program how to doSpecial construction scheme
Full support calculation method:1, determine the above line load (ie, the length of a variety of meters, take the maximum);2, to determine the bearing capacity of the foundation (through the strengthening of the bearing capacity);3, according to the bearing capacity of the foundation, about how many square meters per square meter to determine the vertical tube, assigned to specific point load;4, to determine the number of tons of vertical pipe can be per ton (according to pipe diameter, wall thickness calculation of allowable stress);
Q: THIS METAL SCAFFOLDING IS CONNECTED TO EARTH.Need 2 more questions to be answered:1.Is he going to be electrocuted if he wasn't holding the metal scaffolding?2.will the current flow through him or through the wire in both cases?
First of all, are you working with AC ( alternating current - like a house) or DC ( direct current - like a car)? Assuming you are working with AC, then: Which wire are you holding? This again is assuming 120 vac - Bare copper ( ground) White ( neutral ) or Black ( Hot ) If you have a bare copper ground wire or the White insulated wire you will be fine. If you have the Black insulated wire in your hand then you are going to have a bad day. Yes to the first question Yes to the second question ( I would hope he was smart enough to let go before being too badly zapped) Both is the answer to the third question, as the person is basically an extension of the circuit - being burnt up - until he touches earth (ground) allowing the current to seek ground. All in all I would say leave any exposed wires alone until you have a professional with a multi meter check it out first. If this is in a commercial ( business) setting the voltages are much higher, not to mention it is most likely 3 phase - so watch out. All colors are referenced for the United States.
Q: This is an answer to irreducible complexity. Are there any examples that we see in animals or organs? or on the cellular level? Are vestigial organs a form of quot;scaffoldingquot; that are in the process of being removed?
The classic demonstration was in the E. coli long term experiment. A strain gained the ability to metabolize citric acid after 31,500 generations. Culturing preserved strains from 15,000 and 20,000 generations showed that there was an event that occurred in between that enabled the later conversion to citrate metabolism.
Q: So im a guyAnd I might get oneAnyone had one before/got one?Any advice?How much do they normaly cost?if you answer this i will love you forever :)
okay, if you do end up getting it, make sure you get it on the side you DONT sleep on. dont let shampoo get on it. be really careful with it. if you have longer hair dont let your hair get caught in it cause it'll get tangled on it and it'll hurt and tug on the bar. it's usually around 40 dollars for it. this piercing requires a long time to heal and it has a high risk of infection. but if you take good care of it, you'll be good (: hope this helpedd.
Q: Fastener type steel pipe scaffold composed of which components?
3.2 fasteners3.2.1 fasteners shall be made of malleable cast iron or cast steel, the quality and performance shall be in accordance with the current national standardRegulation of GB15831 for pipe scaffold fastener. Fasteners made of other materials shall be tested and verifiedQuality meets the requirements of this standard before use.3.2.2 fasteners in bolt tightening torque to 65N * m, shall not be damaged.
Q: What are the safety requirements for the dismantling of construction scaffolding
(3) prior to the dismantling of scaffolding, the scaffolding should be retained on the material, debris and other clean, and should be removed by the removal of mechanical equipment, electrical and other pipelines, such as demolition, or to be protected.(4) the dismantling of the scaffolding should be unified command, should be approved by the construction plan, the requirements of the work instructions, from top to bottom in the order of the upper and lower levels are strictly prohibited demolition operations.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords